Logo
Firebird Metals

Operations  ·  Upstream optionality

Manganese Projects

234Mt of manganese resources in Western Australia. Because our flowsheet is ore-agnostic, these are long-term feedstock optionality rather than a precondition for production.

NPV, IRR and life of mine are drawn from the Updated DMS Manganese Concentrate Scoping Study announced 30 August 2023, prepared to an accuracy of ±35%. The Scoping Study is preliminary in nature. There is no certainty of conversion to Ore Reserves or that the production target will be realised. Investors should not make an investment decision based solely on the Scoping Study. Refer to the ASX announcements of 30 August 2023 and 18 March 2025.

  • 176.65MtResource at 9.9% Mn
  • A$741.3MNPV at 8% discount
  • 73.1%Internal rate of return
  • 18yrLife of mine

Oakover Project

Mineral Resource Estimate

ClassificationTonnes (Mt)Mn (%)Fe (%)SiO2 (%)Al2O3 (%)P (%)
Indicated105.7810.18.939.29.80.10
Inferred70.879.68.036.59.50.09
Total176.659.98.638.19.70.10

Refer to ASX announcements 23 March 2023 and 30 August 2023. Firebird confirms it is not aware of any new information or data that materially affects the information included in the original market announcements.

  • 57.5MtMaiden Inferred resource at 12.2% Mn
  • 8.1MtNear-surface supergene zone at 17.4% Mn
Tenure
E52/3633
Project area
~15.7 km² (5 blocks)
Location
~85km SE of Newman, Peak Hill Mineral Field
Drilling
112 holes for 3,727m

Related ASX announcements