Concentrate to Cathode - FRB Investor Presentation
Released
Released
Announcement PDF
“Concentrate to Cathode”
Advanced Lithium Manganese Battery
Materials Developer
18 November 2025
ASX: FRB firebirdmetals.com.au A division of Firebird Metals Limited
2
DISCLAIMER
This presentation contains summary information about Firebird Metals Limited (Firebird) (ABN 24 610 035 535) and is current as of 18th November
2025. The information in this presentation is of a general background and does not purport to be complete. This presentation is not investment or
financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision.
The information contained in this presentation has been prepared without taking into account the objectives, financial situation or needs of
individuals. Investors should obtain their own advice before making any investment decision. Firebird has prepared this document based on
information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or
completeness of the information, opinions and conclusions contained in this presentation.
This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified by the use of forward-
looking words such as, “expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” and other similar
expressions. Indications of, and guidance on, future earnings and financial position and performance are also forward-looking statements. Forward-
looking statements, opinions and estimates provided in this presentation are based on assumptions and contingencies which are subject to change
without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions. Forward-
looking statements including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied
upon as an indication or guarantee of future performance
This presentation contains statements that are subject to risk factors associated with Firebird and the mining exploration industry. It is believed that
the expectations reflected in these statements are reasonable, but they may be affected by a range of variables which could cause actual results or
trends to differ materially. Firebird disclaim any intent or obligation to publicly update any forward-looking statements, whether as a result of new
information, future events or results or otherwise. To the maximum extent permitted by law, Firebird, their related bodies corporate (as that term is
defined in the Corporations Act 2001 (Cth) and the officers, directors, employees, advisers and agents of those entities do not accept any
responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss arising from
the use of the presentation or its contents or otherwise arising in connection with it.
This presentation has been approved by the Board of Firebird.
JORC Compliance Statement
This announcement contains references to Exploration Results and Mineral Resource Estimates, which have been reported in compliance with ASX
Listing Rules 5.7 and 5.8 and extracted from previous ASX announcements as referenced. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the said announcements, and in the case of estimates of Mineral Resources,
that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and
have not materially changed.
The Company confirms that the material assumptions and technical parameters underpinning the production target disclosed in the Company's
announcement dated 7 May 2024 continue to apply and have not materially changed.
Oakover Resource: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource of 176.7 Mt at 9.9%
Mn
Hill 616 Resource: Inferred Resource of 57.5 Mt at 12.2% Mn
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23, 30/8/23, 1/9/23, 18/10/23, 21/11/23, 13/12/23,
29/1/24, 13/3/24, 7/5/24, 14/5/24, 28/5/24, 5/6/24, 10/9/24, 12/9/24, 24/9/24, 2/10/24, 21/10/24, 28/10/24, 9/12/25, 10/2/25,
20/2/25, 18/3/25, 12/5/25, 24/6/25, 21/7/25, 30/7/25, 5/8/25
ASX: FRB firebirdmetals.com.au
CAUTIONARY STATEMENT – SULPHATE FEASIBILITY STUDY
The Feasibility Study referred to in this presentation is a Technical Feasibility of the establishment of the Battery Grade Manganese Sulphate Project Stage 1
Processing Plant in China (the Plant). The Feasibility Study is based on the material assumptions contained in the Feasibility Study document released to the ASX on
7 May 2024. These include assumptions about the availability of funding. While the Company considers all of the material assumptions to be based on reasonable
grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by the Feasibility Study will be achieved.
Notwithstanding the developments set out in this quarterly report, Investors should note that there is no certainty that the Company will be able to raise the
amount of funding to develop the Plant when needed. It is also possible that such funding may only be available on terms that may be dilutive to or otherwise affect
the value of Company’s existing shares.
It is also possible that the Company could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the Plant. If it does, this could
materially reduce the Company’s proportionate ownership of the Plant. Given the uncertainties involved, investors should not make any investment decisions based
solely on the results of the Feasibility Study.
CAUTIONARY STATEMENT- DMS CONCENTRATE SCOPING STUDY
The Updated Scoping Study announced to the ASX on 30 August 2023 has been undertaken for the purpose of initial evaluation of a potential development of the
Oakover Manganese Project. The Scoping Study is a preliminary technical and economic study of the potential viability of the Oakover Manganese Project as a
manganese producer. The Scoping Study outcomes, production target and forecast financial information referred to in this release are based on low accuracy level
technical and economic assessments that are insufficient to support estimation of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/- 35% in line with a scoping level study accuracy. While each of the JORC modifying factors was
considered and applied, there is no certainty of eventual conversion to Ore Reserves or that the production target itself will be realised. Further exploration and
evaluation work and appropriate studies are required before the Company will be in a position to estimate any Ore Reserves or to provide any assurance of an
economic development case. Accordingly, given the uncertainties involved, investors should not make any investment decisions based solely on the results of the
Scoping Study. Given that the results of the Scoping Study are subject to the qualifications above (including assumptions as to accuracy), any results reported in this
release should be considered as approximates and subject to variances having regard for the assumptions referred to in this release. The Company has reasonable
grounds for disclosing a Production Target, given that approximately 99% of the Life-of-Mine (LOM) Production Target is in the Indicated Mineral Resource category,
and 1% is in the Inferred Mineral Resource category. The production target stated in this announcement is based on Firebird’s current expectations of future results
or events and should not be relied upon by investors when making investment decisions. Further evaluation work and studies are required to establish sufficient
confidence that the production target will be met. Firebird confirms that the financial viability of the Oakover Manganese Project is not dependent on the inclusion
of Inferred Resources in the Scoping Study.
The Company considers all the material assumptions in this Study to be based on reasonable grounds. These include assumptions about the availability of funding.
While Firebird considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range
of outcomes indicated by the Scoping Study will be achieved. To achieve the range of potential outcomes indicated in the Scoping Study, funding of in the order of
$123 million (excluding working capital and finance costs) will likely be required. Investors should note that there is no certainty that Firebird will be able to raise
that amount of funding when needed. However, the Company has concluded it has a reasonable basis for providing the forward-looking statements included in this
announcement and believes that it has a "reasonable basis" to expect it will be able to fund the development of the Project. It is also possible that such funding may
only be available on terms that may be dilutive to or otherwise affect the value of Firebird’s existing shares. It is also possible that Firebird could pursue other ‘value
realisation’ strategies such as a sale, partial sale or joint venture of the project. If it does, this could materially reduce Firebird’s proportionate ownership of the
project. Given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study.
The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of
the JORC Code (2012). For full details of the Mineral Resources estimate, please refer to Firebird’s ASX release dated 23 March 2023. Firebird has confirmed that it is
not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters
underpinning the estimates in that ASX release continue to apply and have not materially changed.
3
ASX: FRB
Company
Overview
FIREBIRD METALS
Mn-Rich Future
Pioneering next-generation manganese-
rich battery cathodes with superior
performance.
Demand for energy storage (ESS) is surging
Vertically Integrated Battery Tech
Maximizing margin capture through
“Concentrate to Cathode capability”.
Access to a significant JORC compliant Mn
resource in Australia
World-class Technical Team
Globally designed, strategically located sector-
leading technological development, fully
Australian owned & engineered for global
battery market scalable deployment.
Strategic Partners
Working with some of the largest Western
HPMSM manufacturers worldwide.
Engagement with Western OEMS, battery
and cathode players
Disruptive Battery Tech - LMFP
Firebird’s breakthrough tech enabled lower-cost,
high-performance LMFP pCAM production with
globally replicable, patent-backed technology.
firebirdmetals.com.au
Energy saving process HPMSM
Energy saving kiln that uses at least 70%
less electricity.1
5th Generation Crystallisation reactor use
90% less energy than conventional single
effect evaporator. 2
Note:
1) Refer ASX announcement 21/10/2025 and 2) ASX announcement 30/11/2023
4
ASX: FRB firebirdmetals.com.au
Market Opportunity
ASX: FRB
The Shift To Manganese-
Rich Cathodes
firebirdmetals.com.au 5
Today
Emerging
The Future
LFP
LMR
Lithium Iron Phosphate (LFP) 80% of cathode market
Lithium Manganese Iron Phosphate (LMFP) rapid
adoption from 2028
Lithium Manganese Rich (LMR) mass adoption after 2030
LMFP
0
10
20
30
40
50
LFP NMC Sodium Ion LMFP LMR
Manganese
Content
(%)
% Rising Mn Content
Source: Giga Mn & Magnus Bekker, note estimated elemental content in cathode
0
15
20
25
50
LMFP batteries offer higher energy density (15–20% more) and a higher voltage than LFP
batteries making them cheaper on a cost per kWh basis.
LMFP Has Taken Off
Manganese-rich Outpace Other Cathode Mixtures
6
ASX: FRB
LMFP Market growth
firebirdmetals.com.au
Source: Project Blue 2025
“Both GM and Ford have publicly announced plans to
begin commercial production of LMR battery chemistries
by 2029.”
Source: Ford and GM investor presentations, 2023–2024
Source: CRU Battery Value Chain Service
Battery Energy Storage (ESS) Market is surging
7
ASX: FRB
ESS Market growth
firebirdmetals.com.au
Source: Albermarle, Nov 2025
Source: Macquarie, Nov 2025
“CALB Group estimates global ESS battery
shipments to reach 1,000GWh in 2026, up
67% YoY vs ~600GWh in 2025.”
“Li-ion stationary storage demand driven by competitive
economics and desire for energy reliability.”
Source: Synergy 100MW Big Battery Project, Kwinana Western Australia
ASX: FRB
The BESS & LMFP Opportunity
LMFP Advantage
LMFP uses less expensive metals
to produce higher density
prismatic batteries. This leads to:
▪ more energy in an equivalent
size pack
▪ lower overall costs and
▪ a smaller development
footprint
This is the reason LMFP BESS is
forecast to be commercially
deployed on a significant scale
firebirdmetals.com.au 8
2025 2025 2027
Tesla MegaPack 3
5.0 160-180 50%
MWh LFP (Wh/kg) Pack density
CATL
9.0 170-190 73%
MWh LFP (Wh/kg) Pack density
LMFP
14.0-18.0 225-255 80-85%
MWh LFP (Wh/kg) Pack density
Tesla Megablock Battery System
launched Sept 2025
0
20
40
60
80
100
120
2024 2025 2030
Market
Size
(USD
BN)
BESS Market Size
Source: Global BESS Market Size, Share & Industry Trends Growth Analysis Report published July 2024 by MarketsandMarkets
37.23
105.96
50.81
2023
Tesla MegaPack
3.9 160-180 50%
MWh LFP (Wh/kg) Pack density
9
ASX: FRB firebirdmetals.com.au
Firebird Metals
Technology Driven
Value Proposition
Raw
Materials (Mn conc.)
Input Materials (HPMSM)
& Precursor (pCAM)
Cathode Active
Materials (CAM)
Mn-Rich
Battery Cell
Mn-Rich
Battery Pack
10
ASX: FRB firebirdmetals.com.au
1 2 3 4 5
Sector-leading expertise and propriety technology positions
Firebird at the forefront of manganese innovation
11
ASX: FRB
Competitive Advantage:
Our Team & IP
Sector-Leading Australian-Chinese Team
Over 50 years of combined expertise in manganese and chemical sectors,
unmatched in Western markets
firebirdmetals.com.au
Central South University (CSU) Partnership
Collaboration with CSU with strong reputation for producing world-leading battery
materials processes. CSU staff are global experts in Li-ion battery supply chain,
including alumni who founded BYD and Ronbay Technology
Extensive Patent Portfolio
Firebird’s process and technology is already the subject of six (6) LMFP related
patents (2 granted and 4 under application). These are currently held by Hunan
Firebird Battery Technology (HFBT), Firebird Metals’ 100%-owned Chinese subsidiary.
Global IP ownership & Replicability
Complete Firebird ownership of all IP, enabling deployment of technology
platforms worldwide
Firebird Lab: Concentrate to Cathode
12
ASX: FRB
Fully operational
since Dec 2023
Continuous research and
development with rapid
innovation cycles
firebirdmetals.com.au
Hydrometallurgy Processing & Analysis Cathode Material (CAM) Production 3rd Party Battery Testing Centre
Our state-of-the-art pilot plant facility demonstrates
complete integration from manganese concentrate to
battery cathodes
Multiple Manganese
Chemistry Capabilities
Flexible production of all types of Mn chemicals: HPMSM,
Mn3O4, MFP and other advanced manganese battery chemicals
to be used in manganese rich cathodes in emerging and future
cathode markets
3rd Party
Battery Testing
Batteries are made at a 3rd
party facility run by our CSU
partners for testing
Regional Advantage
for R&D
To date, laboratory set up
and operation costs are a
fraction of Western peers
ASX: FRB
Firebird HPMSM
Special Tech
firebirdmetals.com.au
High-level HPMSM Process Flow Diagram
13
Manganese Conc.
Grinding
Calcination
Leach Residue
Leaching
Filtration
Ni /Co Sulphide
Precipitate
1st Crystallisation
Centrifuging
Sustainable and Eco-Friendly
The process is designed to be environmentally
sustainable, ensuring that all residues are either
consumed or sold, minimizing waste and
environmental impact
Innovative Proprietary Technology
The project is supported by proprietary technology
specifically aimed at reducing operational
expenses (OPEX), enhancing overall cost efficiency
and competitiveness
Flexibility
We can process all types of manganese ores, using
adapted methods. This specific process is optimized for
our own ore and selected third-party feed
Firebird’s technical team brings extensive
commercial production experience
Impurity Removal Filtration
MVR Evaporation
2nd Crystallisation
Drying and Packing MnSO4·H2O
Note:
1) per ASX announcements dated 7/5/2024
Firebird Lab: Concentrate to Cathode
14
ASX: FRB firebirdmetals.com.au
Products from Firebird’s Chinese pilot facility, including HPMSM, LMFP CAM and coin cell
batteries made using Firebird Manganese products
Firebird's Strategic Value Proposition
Concentrate to Cathode R&D Lab
Strategic Growth Pipeline
• Vertically integrated from Mn concentrate to high-purity Mn chemicals
• Feedstockagnostictechnology
• Capability to supply ALL types of manganese chemicals for
current,emerging and future cathode markets
• Leveraging proven commercial experience in manganese processing
• LMFP(LithiumManganeseIronPhosphate):Currentlyunderdevelopment
asprimaryfocus
• LMR(LithiumManganese Rich):Identified asnextmajorfrontier,drivenby
OEMinterest.
• LMRisexpectedtobethemostsuitedsolidstatebatterycathodematerial
Development Work
Completed to Date
Design and equipment selection is complete. LMFP test work at our China pilot plant is
ongoing, with samples being prepared for customer distribution. The next step is to construct
an Australian Demonstration Plant (ADP) to support future commercial LMFP development.
ASX: FRB firebirdmetals.com.au 15
ACTIVITY Nov 2023 Jan 2024 May 2024 Jun 2024 Oct 2024 Mar 2025 Jun 2025 July 2025 H2 2025
Establishment of a world-class, sector leading technical team
Commencement of Pilot Plant operations
Completion of highly successful Feasibility Study, Safety
Permit received
Sunward Agreement on Firebird designed highly efficient kiln
Firebird-Sunward kiln testing delivered impressive results
Central Southern University – LMFP collaboration agreement
FRB produces LMFP coin cell batteries
Initial LMFP Battery test results
2 LMFP Patents received, 4 in processing
Continued cathode test work and development.
Potential offtake discussions for manganese chemicals,
pCAM and CAM both within China and internationally
INDUSTRY: Mn Rich cathode chemistries continue to develop.
LMFP continues to grow in China. LMR is emerging as a future
high-performance cathode material
16
ASX: FRB firebirdmetals.com.au
Australian Demonstration Plant
17
ASX: FRB firebirdmetals.com.au
Australian Demonstration Plant (ADP)
Next Steps
• Firebird in discussions with 2 of only 3 Global HPMSM manufacturers who are interested in our technology.
• Firebird to develop Australia’s first demonstration-scale, end-to-end, high purity battery materials facility.
• The ADP will demonstrate the transformation of manganese concentrate into High Purity Manganese Sulphate Monohydrate
(HPMSM), Lithium Manganese Iron Phosphate (LMFP) Precursor Cathode Active Material (PCAM) and Cathode Active Material
(CAM).
• This proprietary, patent protected process will support Australia’s national ambitions for supply chain resilience and value-
adding in the lithium-ion rechargeable battery manufacturing sector.
• This end-to-end process has been proven, across multiple campaigns, at our wholly owned pilot plant in China.
• The ADP will produce representative samples of HPMSM, PCAM and CAM for initial product validation with OEMs, cell
manufacturers and cathode producers. Government funding sources are available, customer engagement and site selection
process is underway.
• Successful validation will support agreements advancing toward contractual offtake arrangements and ultimately the
development of a commercial-scale production facility.
ASX: FRB firebirdmetals.com.au
Executive Chairman
Evan Cranston
Mr. Cranston is an experienced mining
executive, with a background in
corporate and mining law.
Proven Team
CEO
Ron Mitchell
Mr. Mitchell has more than 25 years’
experience in senior commercial,
strategy, sales and business
development roles including 15 years
specialising in lithium, battery materials
and critical minerals.
Non-Executive Director
Brett Grosvenor
Mr. Grosvenor is an
experienced mining
executive, with over 25
years’ experience in the
Mining and Power
industry. Holds a dual
tertiary qualification in
Engineering and a Master
in Business.
Non-Executive Director
Ashley Pattison
Mr. Pattison is a Chartered
Accountant with over 20
years’ experience in the
resources sector, spanning
operations, finance,
strategy, and corporate
finance.
Executive Director
Wei Li
Mr. Li, a Chartered
Accountant, has broad
experience in the
resource sector, having
managed a base metal
exploration company in
the Northern Territory
and helped commission a
A$150M EMD plant in
Hunan, China.
Special Advisor to Board
Ken Hoffman
Mr. Hoffman was formerly Global Head
of Battery Materials at McKinsey,
advising on strategy, supply chains, and
capital raising across the battery value
chain.
18
Key Consultant
Peter Allen
Mr. Allen is a mining
executive, with more than
20 years' experience in
marketing of manganese,
lithium and a range of
other commodities.
19
ASX: FRB
Investment Snapshot
Unique LMFP Technology
Positioned in a rapidly growing
manganese-rich cathode market with
proprietary processing
Global Technology Platform
Scalable IP model designed in China, owned
in Australia, deployable worldwide
Market Timing
Entering LMFP market as demand forecasts
to reach US$20B+ by 2030
firebirdmetals.com.au
Share Price (11 Nov 2025)
$0.135
Shares on issue
163.69 M
Market Capitalization
$22.1 M
Options @ $0.3 to $1.00
36.5 M
Performance Rights
2.2 M
Cash on hand: 18 Nov 2025
(additional proceeds from
tranche 2 placement and 3rd
party payments of $3.4 M to
come)
$3.0 M
8.37%
Canmax Technologies
8.10%
Board & Management
7.85%
Tolga Kumova
75.68%
Other Shareholders
Capital Structure
Firebird is committed to responsible mining and chemical
production practices with transparent ESG standards
20
ASX: FRB
Sustainability &
ESG Commitment
Low-Carbon Process
Our kiln technology reduces energy consumption by 70%, while our 5th-
gen crystalliser cuts energy usage by 50% compared to industry
standards
firebirdmetals.com.au
Waste Minimization
Zero-waste principles with all residues either consumed or sold to
minimize environmental impact across our value chain
Transparent Supply Chain
Full traceability from ore to cathode with rigorous ethical sourcing
standards and third-party verification
Community Engagement
Partnering with local communities in Western Australia
and China to create shared value and sustainable
development opportunities
Firebird:
At The Forefront Of
Battery Cathode
Innovation
21
ASX: FRB firebirdmetals.com.au
Australian-owned, delivering world-
class LMFP technology as EVs shift to
manganese-rich batteries
Pioneering Mn-Rich Tech
Multiple patents and proprietary
know how with significant cost and
energy saving innovations
Proprietary Technology
Integrated process for maximum
value from manganese
concentrate to cathode
Feedstock agnostic
Margin Capture
Technology replicable worldwide
with full IP ownership
Global Scalability
22
ASX: FRB firebirdmetals.com.au
A division of Firebird Metals Limited
Thank you
ASX: FRB
firebirdmetals.com.au
Ron Mitchell
Chief Executive Officer
ron.mitchell@firebirdmetals.com.au
ASX: FRB firebirdmetals.com.au
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23 and 30/8/23
23
176.65 Mt @ 9.9% Mn
Granted mining lease
Mineral Resource
Classification
Tonnes (Mt) Mn (%) Fe (%) SiO2 (%) Al2O3 (%) P (%)
Indicated 105.78 10.1 8.9 39.2 9.8 0.10
Inferred 70.87 9.6 8.0 36.5 9.5 0.09
Total 176.65 9.9 8.6 38.1 9.7 0.10
Resource
A$741M NPV
Project Value
73% IRR
Return on Investment
18-year Life of Mine
Project Lifespan
Oakover provides the future upstream security for our manganese
chemicals business, with favorable geology, near-surface deposits and
metallurgical testing confirming battery-grade material viability
Oakover Project
Strategic resource securing long-term manganese supply for our battery materials
PERTH
NEWMAN
PORT HEDLAND
WESTERN
AUSTRALIA
Oakover Project
24
ASX: FRB firebirdmetals.com.au
Appendix 1:
China Lab Test Results
25
ASX: FRB firebirdmetals.com.au
Note:
1) Raw Material costs have been calculated by using chemical formula for LMFP, deriving molecular weights and theoretical mass, excluding Lithium Carbonate, then using SMM market price for each item
2) Stated savings are calculated costs for each removed stage of HPMSM process by using LMFP process as per ASX announcements dated 7/5/2024 and 21/10/2024
• Direct MnSO₄ solution utilization: Eliminates HPMSM crystallization,
streamlining pCAM synthesis for LMR.
• Controlled impurity retention: Trace metals in solution act as beneficial
dopants, enhancing structural stability and electrochemical performance.
• Cost efficiency: Reduces raw material and processing expenses by
removing a crystallization step. Reducing 1/6 cost of pCAM.
• Improved pCAM quality: Delivers superior consistency and performance
compared to conventional synthesis methods.
• Process innovation: Provides both economic and technical advantages for
next-generation LMFP cathode materials.
Sintering Jet milling LMFP products
Nova
co-precipitation
process pCAM
Without
crystallisation of
HPMSM, MnSO4
solution is used
directly Spray drying
Milling LMFP Battery
FRB LMFP – Utilising HPMSM Expertise Reducing pCAM Cost by >17%
ASX: FRB
FRB LMFP Key Performance
firebirdmetals.com.au 26
Key Drivers for LMFP
Safety: Higher thermal
runaway temperature
Energy Density: Up to
20% increase vs LFP
Cost: Reduced dependency on
expensive metals
Winter Performance: Matching
NCM cold weather capability
Parameter FRB Results Industry
Standard
Technical Significance
Impurity content (K, Na, Ca, Mg,
Cu, Zn, Pb, Ni)
≤ 100 ppm
(Low impurity)
≤ 150 ppm Inactive impurities—especially magnetic metals—reduce specific capacity and energy density and
may seriously affect cycle life and safety.
Particle size distribution (D₅₀) 5–15 μm 5–20 μm Smaller particles shorten Li-ion diffusion paths and improve kinetics; overly small particles may
agglomerate, increasing internal resistance. A rational distribution allows small particles to fill voids
between larger ones, improving tap density and volumetric capacity.
Tap density ≥ 0.75 g/cm³ ≥ 0.7 g/cm³ Higher tap density is key to improving volumetric energy density and supports large-scale
manufacturing stability.
Metal (Mn+Fe):P ratio &
elemental uniformity
0.91–0.99 0.90–1.00 Proper metal ratios promote a pure olivine phase, reduce Fe³⁺/Mn²⁺ segregation, and enhance
conductivity and capacity retention; improves structural uniformity and electrochemical stability.
0.1C discharge specific capacity 156 mAh/g 150 mAh/g High 0.1C capacity reflects high purity, high-quality crystal structure, excellent reversibility, and
good conductivity.
1C discharge specific capacity 136 mAh/g 130 mAh/g Key indicator for commercialization, reflecting optimized microstructure, carbon coating quality, Li-
ion diffusion, and electronic conductivity.
27
ASX: FRB firebirdmetals.com.au
FRB LMFP Testing Results
Discharge Specific
Capacity
Firebird Results Targeting Chinese Industry Standard
(T/CIAPS0029—2023)
0.1 C 156 mAh/g > 160 mAh/g 150 mAh/g
1 C 136 mAh/g >140 mAh/g 130 mAh/g
>150 batches completed in total, Button Battery tests
Results exceed Chinese industry standards, using materials that are all commercially
available from 3rd party chemical suppliers, customer verification has commenced.
Identical XRD Analysis of FRB LMFP and competitors LMFP (inset: SEM Scan )
Uniform morphology, excellent particle size
ASX: FRB firebirdmetals.com.au 28
0
10
20
30
40
50
60
Guangxi
Yuding
Materials
ISKY
Chemicals
Guangxi
Huijin Energy
Guizhou
Manganese
Firebird E25 Euro
Manganese
US$
Millions
0
200
400
600
800
1000
1200
1400
1600
1800
Euro Manganese Study
- refer addendum
E25 Feasibility study -
refer addendum
Benchmark Mineral
Intelligence – China
EMM Route as at April
2024
Benchmark Mineral
Intelligence – Ore to
Sulphate (44% Mn) -
based Mn Ore at
$5dmtu as at April
2024
Firebird Feasibility plus
Kiln Savings
US$/t
FRB Feasibility Price (Benchmark Minerals Intelligence Forecast April
2024, refer ASX announcement 7/5/24)
HPMSM OPEX Advantage
Firebird maintains the lowest OPEX among global
manganese sulfate producers
Industry-leading cost position
US$579/t1
Lowest energy
consumption
Proprietary technology
advantages
Advanced process
engineering
Strategic China
production base
Capital Intensity US$/10,000t Of MnSO4 Firebird is Targeting Lowest OPEX Even in China
FRB CAPEX Intensity marginally higher than other Chinese plants to ensure
efficient environmental and waste processing
Source1 : Refer ASX announcements 21/10/24 and 7/5/24, Note: for Capital Intensity and OPEX cost source refer addendum at end of presentation
Firebird Metals
(ASX: FRB)
Source:
ASX Announcement
Element 25 Train 1
(ASX: E25)
Source:
ASX Announcement
Euro Manganese
(ASX:EMN, TSXV: EMN,
OTCQB: EUMNF)
Source:
ASX Announcement
Study Complete Feasibility Study
ASX announcement 7/5/24
Feasibility Study
ASX announcement 12/4/23
Feasibility Study
ASX announcement 28/7/22
Production Capacity 72,500 t/a HPMSM 65,000 t/a HPMSM
100,000 t/a HPMSM & 15,000 t/a
HPEMM
Products
50,000 t/a HPMSM & 10,000 t/a
Mn3O4
65,000 t/a HPMSM
100,000 t/a HPMSM & 15,000 t/a
HPEMM
Capital US$ 83.5 M US$289 M US$757.3M
Production Cost
US$609 per tonne product
US$579 per tonn
Share your feedback