China-based Battery Business Update
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 November 2023
CHINA-BASED BATTERY GRADE MANGANESE SULPHATE AND
LMFP BUSINESS UPDATE
HIGHLIGHTS
Following excellent results from the China-Based Battery Grade Manganese Sulphate
Scoping Study, which demonstrated the potential of a very competitive low-cost CAPEX
and OPEX operation, Firebird continues to efficiently progress key activities in China,
which include the following:
•
•
•
•
•
Establishment and registration of the Company’s Chinese subsidiary, which has been
named Hunan Firebird Battery Technology Co Ltd
o Appointment of highly regarded and leading Manganese sulphate specialist Mr
Zhou Qiyun as Chief Operating Officer (COO)
o Key research & development, operational & administration personnel appointed,
with the team to be led by Mr Zhou
Advanced and commercialised crystallisation technology secured, providing a key
operation and cost advantage for Firebird
o Agreement to use patented technology entered into with Hunan Yuxiong
Technology Co., LTD company, which is controlled by Mr Zhou
o 5th generation technology is proven, in operation at other China-based plants and
enables significant energy cost reductions for MnSO4 production
Pre-Feasibility Study (PFS) commenced, with excellent progress being made
o Experienced PFS & engineering design experts appointed
o Preliminary engineering design & PFS expected to be completed in late Q1 2024
Research & Development (R&D) lab, including pilot plant design complete
o Procurement of all major equipment underway and Plant scheduled to be in
operation in early Q1 2024
Ongoing discussions to finalise potential plant site nearing completion
Advanced Manganese developer Firebird Metals Limited (ASX: FRB, “Firebird” or “the
Company”) is pleased to provide a progress update on its China-based Manganese Sulphate and
Lithium Manganese Iron Phosphate (LMFP) battery strategy.
The recently completed in-house China-based Battery Grade Manganese Sulphate Scoping Study
validated Firebird’s focus to produce battery grade manganese sulphate in China, with impressive
results highlighted by a strong projected NPV of approximately US$331M, low-cost total
capital expenditure of approximately US$82.3M, an internal rate of return of 47% and a
payback period of less than two years. (See ASX announcement: Excellent Results from ChinaBased MNSO4 Scoping Study, 21November 2023).
Since announcing the next phase of strategic growth in early September 2023, Firebird has moved
quickly to assemble its in-country team and commence key workstreams, as the Company
continues to work towards becoming a near-term producer of battery-grade manganese sulphate
in China.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Technical & Operational Team
Firebird has made its first major team appointment for its Chinese subsidiary, Hunan Firebird
Battery Technology Co Ltd, with Mr Zhou Qiyun agreeing to join as Chief Operating Officer (COO).
Based in China, Mr Zhou is a highly regarded and leading MnSO4 expert, who has spent majority
of his career across the development, optimisation and commercialisation of technologies for
MnSO4 processing (including patents), with a key focus on energy saving optimisation processes
through evaporation and crystallisation stages.
Mr Zhou was previously a part-owner of a battery grade MnSO4 plant and has consulted to a large
number of existing MnSO4 plants in China, principally advising on technical processing issues. Mr
Zhou also consults to the Central South University as an expert in manganese sulphate processing.
As part of Mr Zhou joining Hunan Firebird Battery Technology Co Ltd, he has introduced several
other technical experts, who also bring Mn3O4 process technology experience, to consult to and
work for Hunan Firebird Battery Technology Co Ltd. The establishment of a leading, high-purity
manganese team, places Firebird in a strong position to execute on a busy 12-month work
program in China and ensure the level of experience required is in place to grow into a high-purity
manganese producer.
The key near-term objectives for Mr Zhou and his team will be:
• Manage the setup of Firebird’s R&D centre
• Assisting in the PFS process
• Provide the technical process flow sheet for MnSO4 & Mn3O4 and engineering design
• Ongoing development of new products for manganese rich PCAM materials, with a key focus
on LMFP commercialisation
• Construction of the plant, sourcing equipment and operational production management once
the plant is operational
Advanced Crystallisation Technology Secured for China Operation
Product quality and cost efficiency remain key focus areas for Firebird in developing a competitive,
long-term high-purity manganese operation. The Company announced attractive low CAPEX
numbers in the recent China-based Battery Grade Manganese Sulphate Scoping Study, however,
remain focused on developing further cost advantages to operate further down the cost curve.
To support the development of a low-cost, high-margin operation, Firebird has secured Mr Zhou’s
energy saving technology patent. Mr Zhou has sold & installed this technology, which is currently
in it’s 5th generation, across all generations there are approximately 20 plants using the
technology.
The patented 5th generation has being used in one operation in China, with the technology
equipment currently being fabricated to be installed in another two MnSO4 factories.
The success of this technology derives from the utilisation of residual heat from the initial
crystallisation process, to recycle and preheat solution feeding into crystallisation process, which
ultimately leads to energy consumption of around 1/10th of existing standard crystallisation plants.
Mr Zhou also agreed that Firebird can use other patents & inventions which he is the
owner/inventor or part owner/inventor. In securing Mr Zhou’s leading patented technology,
Firebird has entered into a head of agreement with Mr Zhou on the terms set out in Appendix A
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Pre-Feasibility Study Underway and Leading Engineering Group Appointed
The China-based manganese sulphate Pre-Feasibility Study (PFS) is underway including
preliminary engineering design, with the Company already making excellent progress on several
key activities.
Firebird has appointed Hunan Chemical Engineering Design Institute (HCEDI) to complete key PFS
workstreams. HCEDI will be responsible for all engineering design work & permitting documents.
HCEDI has more than 60 years’ experience across all facets of engineering work, including
consulting, design, survey, supervision and general contracting of engineering construction.
HCEDI has a team of more than 200 engineering and technical personnel and is seen as one of
China’s leading specialist engineering firms, having completed work on several previous
manganese sulphate plants. HCEDI has successfully designed 3 MnSO4 plant that are currently in
operation.
Firebird expects the PFS to be completed by the end of Q1 2024.
Figure 1: HCEDI and Hunan Firebird Battery Technology staff including Mr Zhou
R&D Lab progress
The Company is making strong progress on the development of the R&D lab. The design layout of
the lab is now complete and all specialised equipment is being ordered.
Firebird expects the lab to be operational in January 2024. Initially the lab will produce samples for
MnSO4 & Mn3O4 for potential customers and for PFS work.
Plans to complete testing on several other potential manganese rich PCAM materials is underway
and expected to be produced soon after. The R&D centre costs are on time and budget.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Plant Location Site
The Company has carried out extensive due diligence on possible factory locations within China,
visiting 10 industrial park sites in different provinces.
Firebird has considered various facets of the Manganese Sulphate and LMFP battery strategy
when visiting these industrial parks, including availability of sulphuric acid, steam, key reagents,
proximity to customers, transportation routes, factory residue consumers and the ability to
accommodate future expansion plans. The Company will announce is preferred location during
the PFS study.
Commenting on the strong progress being made in China, Firebird Managing Director
Peter Allen said, “I would like to welcome Mr Zhou to the Firebird team and along with Executive
Director and CFO Wei Li, look forward to working closely with Mr Zhou as we continue to progress our
China LMFP battery strategy.
To attract someone of the calibre and experience of Mr Zhou is an excellent result for Firebird and
shows that we have established the right strategy and platform for success in China to build a tier-one,
high-purity manganese sulphate operation. The significant value that Mr Zhou’s will bring to the
Company, his knowledge of manganese sulphate production and his patented and proven technology
processes, truly elevates Firebird China based manganese sulphate plant aspirations to a world class
level.
“We continue to make excellent strides with our LMFP battery strategy and look forward to executing a
busy 12-month work program, which once completed, will place the Company in a strong position to
grow into a near-term producer of battery-grade high-purity manganese sulphate.”
This announce has been approved for release by the Board.
For further information contact:
Mr Peter Allen
Managing Director
+61 8 6245 9818
admin@firebirdmetals.com.au
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
Michael Weir / Cameron
Gilenko
Citadel-MAGNUS
0402 347 032 / 0466 984 953
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Appendix A
Mr Zhou (including his Company) and Firebird have entered into a Binding Heads of Agreement
to grant Firebird an exclusive licence to use Mr Zhou and his company’s technology, including for
the purpose of producing manganese sulphate, manganese oxide and LMFP (Lithium
Manganese Iron Phosphate) P-CAM, the exclusive license includes key patents and intellectual
property.
Terms include A$100,000 cash on signing and A$500,000 paid in FRB shares within 30 days of
signing.
A further A$2,500,000 equivalent to be converted into Chinese subsidiary “Hunan Firebird
Battery Technology Co Ltd “ shares on successful completion of the following key performance
indicators;
a)
b)
c)
d)
Completion of China Based Battery Grade Manganese sulphate PFS;
Set up and running of Chinese Pilot Plant and R&D centre:
Final Investment Decision made by Firebird Metals Board of Directors on China Based
Battery Grade Manganese sulphate plant; and
Agreed production levels achieved
It is expected that Mr Zhou holding in Firebird’s Chinese subsidiary, Hunan Firebird Battery
Technology Co Ltd post full construction investment will be in the order of approximately 1-2%.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
About Firebird Metals Limited
Firebird Metals is a manganese developer focused on its advanced, 100% owned project
portfolio, located in the renowned East Pilbara manganese province of Western Australia. The
portfolio boasts a total Resource of 234Mt, with exciting exploration and development growth
upside.
The Company’s flagship Oakover Project holds a Mineral Resource Estimate 1 of 176.7Mt at 10%
Mn, with 105.8Mt in an Indicated category. A Scoping Study completed by Firebird at Oakover
highlighted the outstanding long-term potential of the Project as a manganese operation. This
potential was further strengthened through production of >99.8% purity manganese sulphate
monohydrate crystal, which confirmed Oakover manganese ore can be processed into battery
grade HPMSM.
The Company’s other key Projects are Hill 616 and Wandanya which provide Firebird with
compelling growth opportunities.
Hill 616 contains an Inferred Mineral Resource2 of 57.5Mt @ 12.2% Mn and shares similar
geological traits to Oakover. Wandanya is a high-grade exploration opportunity, with Direct
Shipping Ore potential.
Importance of manganese within EV’s, due to its cost reduction abilities without reducing energy
density and range, along with growing demand for battery grade manganese sulphate, highlights
the critical need for projects like Oakover to become operational mines. With a limited number
of advanced ASX manganese developers, Firebird is in a strong position to develop Oakover and
supply a high-quality product into a growing and supply-constrained market.
The Company is committed to generating sustainable long-term value and growth for
stakeholders, through the implementation of best practice exploration methods while
prioritising the well-being, health and environmental protection of its employees and
communities it operates in.
JORC Compliance Statement
This announcement contains references to Exploration Results and Mineral Resource Estimates,
which have been extracted from previous ASX announcements as referenced. For full details of
Exploration Results and Mineral Resource Estimates in this release that have been previously
announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the said announcements, and in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates
in the relevant market announcements continue to apply and have not materially changed.
1
For full details refer ASX announcements dated 10/3/2022 and 23/3/2023
2
For full details refer ASX announcement dated 1/12/2021