Updated Presentation Materials
Released
Released
Announcement PDF
CORPORATE PRESENTATION
FEBRUARY 2024
ASX:FRB
DISCLAIMER
This presentation contains summary information about Firebird Metals Limited (Firebird) (ABN 24 610 035 535) and is current as of 9th February 2024. The information in this
presentation is of a general background and does not purport to be complete. This presentation is not investment or financial product advice (nor tax, accounting or legal
advice) and is not intended to be used for the basis of making an investment decision.
The information contained in this presentation has been prepared without taking into account the objectives, financial situation or needs of individuals. Investors should
obtain their own advice before making any investment decision. Firebird has prepared this document based on information available to it at the time of preparation. No
representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information, opinions and conclusions contained in this
presentation.
This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified by the use of forward-looking words such as, “expect”,
“should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” and other similar expressions. Indications of, and guidance on, future earnings and
financial position and performance are also forward-looking statements. Forward- looking statements, opinions and estimates provided in this presentation are based on
assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current
market conditions. Forward-looking statements including projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied
upon as an indication or guarantee of future performance
This presentation contains statements that are subject to risk factors associated with Firebird and the mining exploration industry. It is believed that the expectations reflected
in these statements are reasonable, but they may be affected by a range of variables which could cause actual results or trends to differ materially. Firebird disclaim any intent
or obligation to publicly update any forward-looking statements, whether as a result of new information, future events or results or otherwise. To the maximum extent
permitted by law, Firebird, their related bodies corporate (as that term is defined in the Corporations Act 2001 (Cth)) and the officers, directors, employees, advisers and agents
of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss
arising from the use of the presentation or its contents or otherwise arising in connection with it.
Firebird is not aware of any new information or data that materially affects the information included in its announcement dated 21 November 2023, and all material
assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23, 30/8/23, 1/9/23, 18/10/23, 21/11/23, 13/12/23 and 29/1/24.
JORC Compliance Statement
This announcement contains references to Exploration Results and Mineral Resource Estimates, which have been extracted from previous ASX announcements as referenced. For full details of
Exploration Results and Mineral Resource Estimates in this release that have been previously announced, refer to those announcements.
The Company confirms that it is not aware of any new information or data that materially affects the information included in the said announcements, and in the case of estimates of
Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially
changed.
CAUTIONARY STATEMENT – CHINA BASED BATTERY GRADE MNSO4 SCOPING STUDY
The China-based Manganese Sulphate Scoping Study, announced to the ASX on the 21/11/2023 is a preliminary technical and economic study of the potential viability of the
processing of part of the manganese concentrate to be produced from the Oakover Manganese Project at a facility to be established in China. The Scoping Study outcomes,
production targets and forecast financial information referred to in this release are based on low accuracy level technical and economic assessments that are insufficient to
support estimation of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/- 35% in line with a scoping level study accuracy. While each of the JORC modifying factors was considered
and applied, there is no certainty of eventual conversion to Ore Reserves or that the production target itself will be realised. Further exploration and evaluation work and
appropriate studies are required before the Company will be in a position to estimate any Ore Reserves or to provide any assurance of an economic development case.
Accordingly, given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study. Given that the results of the
Scoping Study are subject to the qualifications above (including assumptions as to accuracy), any results reported in this release should be considered as approximates and
subject to variances having regard for the assumptions referred to in this release. The Company has reasonable grounds for disclosing a Production Target, given that
approximately 99% of the Life-of-Mine (LOM) Production Target is in the Indicated Mineral Resource category, and 1% is in the Inferred Mineral Resource category. The
production target stated in this announcement is based on Firebird’s current expectations of future results or events and should not be relied upon by investors when making
investment decisions. Further evaluation work and studies are required to establish sufficient confidence that the production target will be met. Firebird confirms that the
financial viability of the Oakover Manganese Project is not dependent on the inclusion of Inferred Resources in the Scoping Study.
The Company considers all the material assumptions in this to be based on reasonable grounds. These include assumptions about the availability of funding. While Firebird
considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes indicated by
the Scoping Study will be achieved. To achieve the range of potential outcomes indicated in the Scoping Study, funding of in the order of US$82.3 million (excluding working
capital and finance costs) will likely be required. Investors should note that there is no certainty that Firebird will be able to raise that amount of funding when needed.
However, the Company has concluded it has a reasonable basis for providing the forward-looking statements included in this announcement and believes that it has a
"reasonable basis" to expect it will be able to fund the development of the Project. It is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of Firebird’s existing shares. It is also possible that Firebird could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture
of the project. If it does, this could materially reduce Firebird’s proportionate ownership of the project. Given the uncertainties involved, investors should not make any
investment decisions based solely on the results of the Scoping Study.
The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC
Code (2012). The Competent Person’s Statement is found on page 5 of this announcement. For full details of the Mineral Resources estimate, please refer to Firebird’s ASX
release dated 10th March 2022 and 23 March 2023. Firebird has confirmed that it is not aware of any new information or data that materially affects the information included
in that release. All material assumptions and technical parameters underpinning the estimates in that ASX release continue to apply and have not materially changed.
CAUTIONARY STATEMENT- DMS CONCENTRATE SCOPING STUDY
The Updated Scoping Study announced to the ASX on 30th August 2024 has been undertaken for the purpose of initial evaluation of a potential development of the Oakover
Manganese Project. The Scoping Study is a preliminary technical and economic study of the potential viability of the Oakover Manganese Project as a manganese producer.
The Scoping Study outcomes, production target and forecast financial information referred to in this release are based on low accuracy level technical and economic
assessments that are insufficient to support estimation of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/- 35% in line with a scoping level study accuracy. While each of the JORC modifying factors was considered
and applied, there is no certainty of eventual conversion to Ore Reserves or that the production target itself will be realised. Further exploration and evaluation work and
appropriate studies are required before the Company will be in a position to estimate any Ore Reserves or to provide any assurance of an economic development case.
Accordingly, given the uncertainties involved, investors should not make any investment decisions based solely on the results of the Scoping Study. Given that the results of the
Scoping Study are subject to the qualifications above (including assumptions as to accuracy), any results reported in this release should be considered as approximates and
subject to variances having regard for the assumptions referred to in this release. The Company has reasonable grounds for disclosing a Production Target, given that
approximately 99% of the Life-of-Mine (LOM) Production Target is in the Indicated Mineral Resource category, and 1% is in the Inferred Mineral Resource category. The
production target stated in this announcement is based on Firebird’s current expectations of future results or events and should not be relied upon by investors when making
investment decisions. Further evaluation work and studies are required to establish sufficient confidence that the production target will be met. Firebird confirms that the
financial viability of the Oakover Manganese Project is not dependent on the inclusion of Inferred Resources in the Scoping Study.
The Company considers all the material assumptions in this Study to be based on reasonable grounds. These include assumptions about the availability of funding. While
Firebird considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be correct or that the range of outcomes
indicated by the Scoping Study will be achieved. To achieve the range of potential outcomes indicated in the Scoping Study, funding of in the order of $123 million (excluding
working capital and finance costs) will likely be required. Investors should note that there is no certainty that Firebird will be able to raise that amount of funding when needed.
However, the Company has concluded it has a reasonable basis for providing the forward-looking statements included in this announcement and believes that it has a
"reasonable basis" to expect it will be able to fund the development of the Project. It is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of Firebird’s existing shares. It is also possible that Firebird could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture
of the project. If it does, this could materially reduce Firebird’s proportionate ownership of the project. Given the uncertainties involved, investors should not make any
investment decisions based solely on the results of the Scoping Study.
The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in accordance with the requirements of the JORC
Code (2012).. For full details of the Mineral Resources estimate, please refer to Firebird’s ASX release dated 10th March 2022 and 23 March 2023. Firebird has confirmed that it
is not aware of any new information or data that materially affects the information included in that release. All material assumptions and technical parameters underpinning
the estimates in that ASX release continue to apply and have not materially changed.
LMFP STRATEGY – RIGHT PRODUCT, RIGHT MARKET, RIGHT LOCATION
Manganese is becoming the low-cost strategic battery material solution, either
through manganese rich nickel-based batteries (NCM) or manganese phosphate
batteries, like Lithium Manganese Iron Phosphate (LMFP)
Through the execution of a clear
speed-to-market strategy,
Firebird’s China-based batterygrade high-purity manganese
sulfate project stands out. With
significantly lower CAPEX and a
highly competitive OPEX, Firebird
is well-positioned to supply into
the thriving Lithium Manganese
Iron Phosphate (LMFP) market.
LMFP is forecast to be the dominant cathode for Electric Vehicle (EV) batteries
and estimated to be >$US20 billion market by 2030
LMFP is safer, cheaper and provides better range:
• LMFP has a higher thermal run-away temperature than nickel-based batteries
• LMFP costs approximately 30% of nickel-based batteries
• Enhances the voltage platform and increases energy density by 15-20%
Benchmark Minerals forecast 2.3Mt of LMFP is in either operation, under
construction or planned in South China alone, which comes in at an estimated
investment of over US$5 Billion
Benchmark Minerals estimate significant demand growth for high-purity
manganese sulphate (MnSO4) by 2040. MnSO4 is required to scale ~25 times
from their 2023 base case (high LMFP penetration case)
For full details refer ASX announcements dated 23/3/23, 10/3/2023, 30/8/2023, 30/1/23 and 18/10/23
Source: Benchmark Minerals, Soochow Securities, Caitong Securities Company Research
5
THE FIREBIRD VISION
COMPANY VISION
Become a global leader in the manganese industry by seamlessly combining mining and downstream processing, with a profound
dedication to the advancement of Li-ion & Na-ion battery sectors.
By harnessing the power of innovation and sustainability, Firebird aims to play a pivotal role in shaping the future of energy
storage solutions and significantly contributing to a more sustainable and electrified world.
BATTERY MINERALS
MINING
China Stage 1
50,000tpa Battery Grade MnSO4 and 10,000tpa Mn3O4
China Stage 2
300,000tpa Battery Grade
MnSO4
Cathode Producer
Australian Production PFS
Australian
Production
Rest of world
Production
Oakover
Manganese
Concentrate
18-year mine
life
Other battery
grade project
development
opportunities
Continue to
increase Mn
Resource base
GLOBAL CATHODE PRODUCER
6
DELIVERING ON STRATEGY - BUILDING A LOW-COST PRODUCER
China Research and Development lab, including Pilot Plant design and
construction complete – operations underway for production of battery grade MnSO4
and Mn3O4
China-based Battery Grade MnSO4 Scoping Study generated excellent results, including
impressive economics, low CAPEX, competitive OPEX, right location and importantly,
validated establishment of a China-based manganese sulphate plant
Cornerstone investment of $1.7m by Canmax Technologies Co. Ltd, becoming the
Company’s largest shareholder with 9.7 % holding
Flagship Oakover Manganese Project in W.A. – 177Mt Resource, with 106Mt in an Indicated
Category.
Concentrate DMS Scoping Study at Oakover – 18-year mine life, 1.2Mtpa with low strip
ratio and mining costs
Firebird team possesses extensive manganese experience, along with access to leading
process and production specialists
For full details refer ASX announcements dated 23/3/23, 10/3/2023, 30/8/2023, 30/1/23 and 18/10/23
For full details refer to ASX announcements 10/3/22, 23/3/23, 30/8/23, 18/10/23, 21/11/23, and 29/1/24
7
GROWING IMPORTANCE
AND USE OF MANGANESE
IN BATTERIES
MANGANESE PROCESS FOR BATTERIES
In Australia
Mn Concentrate Process - A proven metallurgical flow sheet
Mining
Crushing, Screening,
Scrubbing
DMS
Concentrate
Value add: MnSO4
In China
Battery Grade
MnSO4 powder
Crystallisation
Purification
Leaching
Value add : Cathode material
Battery Grade
MnSO4
dissolution
Mix solutions
Or
Solid mixing
Drying and Roasting
CAM i.e. “LMFP”
9
MANGANESE USES IN BATTERIES
Traditional
Uses
• Manganese has a long history of being a
cathode material for batteries in the form of
Electrolytic Manganese Dioxide (EMD) and in
its natural form
• Current production market sizes are 482kt in
China and 107kt for rest of the world
Manganese content (kg) in per battery in each vehicle above
Source: Benchmark Mineral Intelligence
Manganese
Lithium-ion
Batteries
Na-ion
Batteries
• Mn is used Li-ion batteries, including NCM,
LMO and LMFP – Due to significant benefits of
LMFP, the use of this cathode mix is set for
massive growth
• Size and growth of LMFP market is
potentially the largest in medium to long
term
Indicative Metals Intensity By Battery Type
LFP
NCA
NCM 9½½
NCM 811
Mn
NCM 712
Ni
NCM 622
• Na-ion batteries inherently have lower density
• Sodium batteries contain around 30% Mn
Co
NCM 523
Li
NCM 307
Research and advocates for manganese rich batteries
is on the rise, due to manganese being abundant and
relatively inexpensive compared with nickel and
cobalt.
Emerging
Manganese
rich
Battery
configurations
Fe
NCM 217
P
NCM 111
LMFP
LMO
0
0.2
0.4
0.6
Source: Benchmark Mineral Intelligence and company research
0.8
1
1.2
1.4
10
LMFP IS THE FUTURE CATHODE FOR EV BATTERIES
EV manufacturers Using LFMP
• Lithium Iron Phosphate (LFP) is the world’s most used Li-ion cathode material
for EV batteries
• Three critical key considerations for battery manufacturers when assessing and
developing a cathode mix is safety, cost and capacity
• Adding high purity manganese sulphate (MnSO4) to LFP, creates LMFP,
which delivers significant operational and safety benefits to a battery
Battery Manufacturers Using LFMP
• LMFP is an upgrade from LFP by introducing manganese to replace iron
•
LMFP maintains LFP safety advantages over nickel-based batteries
•
LMFP is cheaper than LFP and nickel-based batteries
•
LMFP is flexible, used on its own or mixed with nickel-based batteries
• Soochow Securities forecast LMFP will replace 50% of LFP batteries by 2030
• Caitong Securities forecast blending LMFP with nickel-based batteries in
China to reach 30% by 2030
Cathode Material Manufacturers Using LMFP
• Benchmark Minerals estimate significant growth in high-purity manganese
sulphate (MnSO4) demand up to 5.3Mt (high LMFP penetration case) by
2040. A massive increases considering in 2012 demand was only 32kt
• Firebird is executing its LFMP battery strategy at the perfect time and will
be well-positioned to supply into this rapidly growing market
力泰锂
能
11
Source: Benchmark Minerals, Soochow Securities, Caitong Securities Company Research
CHINA LMFP BATTERY STRATEGY
SPEED TO MARKET – DELIVERY OF THE LMFP BATTERY STRATEGY
Since announcing the LMFP battery strategy in September 2023, Firebird has achieved rapid progress and delivered several key milestones
2023
SEPTEMBER
LMFP battery strategy announced. Established to deliver the next phase of major growth for Firebird
OCTOBER
Heavily oversubscribed $8m Placement completed – funds raised to advance key LMFP battery activities and ongoing
development work at Oakover
Strategic Investor secured through the Placement - cornerstone investment completed by China-based Canmax
Technologies Co., Ltd –China's leading lithium chemical producer
NOVEMBER
China-Based MnSO4 Scoping study generated excellent results:
• Strong projected NPV of ~US$331M, using 8% discount rate and before tax
• Low-cost total CAPEX of ~US$82.3M
• Highly competitive OPEX of ~US$659/mt
• Internal rate of return of 47% before tax
• Payback period of less than two years
Registration of Chinese subsidiary - Hunan Firebird Battery Technology Co Ltd
Manganese sulphate specialist Mr Zhou Qiyun appointed Chief Operating Officer of Hunan Firebird Battery Technology
Co Ltd
Advanced and commercialised crystallisation technology secured, providing key operation and cost advantages
2024
DECEMBER
Sulphate plant location selected – Will be situated in the Jinshi High Tech Industries Development Zone, Jinshi, Hunan
province, China
JANUARY
Research and Development lab, including Pilot Plant design and construction complete. Pilot Plant operations
commenced, with samples of MnSO4 and manganese tetra oxide (Mn3O4) to be produced for potential customers and
offtake parties
13
For full details refer to ASX announcements 30/1/23, 1/9/23, 18/10/23, 21/11/23, 30/11/23, 13/12/23 and 29/1/24
GLOBALLY COMPETITIVE COST ADVANTAGES IN CHINA
•
Firebird has developed two major advantages
through its LMFP battery strategy:
•
Company owned impurity removal process that easily meets
Chinese and European specification standards
•
Agreement to use 5th generation energy saving technology,
which is in operational in China. This technology recaptures
energy during the crystallisation process to pre-heat solutions
going into reactor
•
Firebird process is environmentally friendly, with no
wastewater produced & solid waste sent to nearby
cement factories as feedstock
•
Other HPMSM producers have to manage processing
issues which include:
•
Removing Mg & Ca from ore feedstock. Generally treated with
the addition of fluorine (which itself requires removal). This is
expensive, tailings are more difficult to treat and can create
several environmental issues. Companies using this process
are much higher up the cost curve
•
Using Electrolytic Manganese Metal (EMM) as a feed stock.
The production of EMM consumes a lot of energy and
removing impurities from EMM is difficult and a costly process
Source: Benchmark Mineral Intelligence Ltd
Firebird is set to be positioned in the lowest quartile of production for high-purity manganese sulphate
Refer to ASX announcement 21/11/2023, Firebird Feed pricing has been based on the company’s long term market view as per the Concentrate scoping study sales price of
US$4.80/CIF China for 32% Mn.
14
INDUSTRY LEADING MANGANESE TEAM
• Firebird has recruited an industry leading, high-purity
manganese team, with a proven track record across the
development and operational lifecycle in China
• Team assembled to ensure Firebird develops into a longterm, low-cost MnSO4 producer
• Highly experienced in-country technical team led by
manganese sulphate specialist Mr Zhou Qiyun, Chief
Operating Officer of Hunan Firebird Battery Technology Co Ltd
• Mr Zhou was previously a part-owner of a battery grade
MnSO4 plant and has consulted to many existing MnSO4
plants in China.
• Across his career, Mr Zhou has been involved in
the development, optimisation and commercialisation of
technologies for MnSO4 processing (including patents)
Hunan Chemical Engineering Design Institute (PFS engineering group)
and Hunan Firebird Battery Technology staff
• Firebird’s partners are leaders within their industries.
Design and engineering institute engaged to complete the
Feasibility Study are highly-experience in MnSO4 & Mn3O4
engineering design
15
HUNAN AT THE EPICENTRE OF CHINESE MNSO4 DEMAND
•
•
Key factors for Firebird’s decision on sulphate plant
location included proximity to and availability of:
•
Sulphuric acid, steam and key reagents
•
Customers (within 150km radius of site)
•
Transportation routes; and
•
Factory residue consumers
Decision to build the plant in the Jinshi HighTech Chemical Park due to following key
operational and logistical benefits:
•
Located ~237km north from Changsha, which is
the capital of Hunan
•
Situated on the Li Shui River, providing access to
the low-cost Yangtze River transport network
•
126 large scale industrial enterprises operational
•
Fully permitted and local government fully
supporting of chemical park and existing and
emerging projects
•
Land price incentive & 6-year tax break
•
Chinese Government policies are changing on
how best to attract foreign capital and
investment
Firebird’s Sulphate plant will be located in Jinshi, Hunan province, China - central to the rapidly growing
battery gigafactory development in Southern China
16
HUNAN AT THE EPICENTRE OF CHINESE MNSO4 DEMAND
17
R&D LAB COMPLETE, PILOT PLANT TRIALS UNDERWAY
• Firebird completed construction of the Research and Development Lab in January 2024, ahead of schedule and under budget
• Pilot Plant operational and will produce samples of MnSO4 and Mn3O4 for potential customers and offtake parties
• Plant has design capacity to produce 10kgs of battery grade MnSO4 per day
• The Plant will also be used to demonstrate the production process to financiers
• Results will play a key role in securing finance to construct the Company’s plant in Hunan and work towards becoming a lowcost MnSO4 producer in the next 18-24 months
• R&D Lab will be used to complete testing on several other potential Mn rich precursor cathode active materials (pCAM)
18
For full details refer to ASX announcements 29/1/24
PLATFORM SET FOR A BUSY FIRST HALF 2024
Battery Grade Manganese Sulphate Feasibility Study at advanced stage – Completion in Q1 24
Investor and Customer Site Visits - March and May 2024
EPC discussions commenced and ongoing
Finance discussions commenced and ongoing
Permitting process progressing simultaneously with Feasibility Study
Product qualification process to commence March 2024
19
FIREBIRD PROJECT PORTFOLIO
W.A. PROJECT PORTFOLIO
OAKOVER (FLAGSHIP)
• Near-surface, gently dipping geology
• Metallurgical test work demonstrated saleable 30 - 32% Mn Concentrate product achievable
• Hydrometallurgy test work demonstrated Battery Grade MnSO4 achievable
1
PORT HEDLAND
• Concentrate DMS Scoping Study – 18-year mine life, 1.2Mtpa with low strip ratio and mining costs
3
• Concentrate DMS Scoping Study - Low CAPEX optionality
• Sulphate Scoping Study Completed
Mineral Resource
Classification
Tonnes (Mt)
Mn (%)
Fe (%)
SiO2 (%)
Indicated
105.78
10.1
8.9
39.2
9.8
0.10
Inferred
70.87
9.6
8.0
36.5
9.5
0.09
Total
176.65
9.9
8.6
38.1
9.7
0.10
HILL 616
2
Al2O3 (%) P (%)
• 35km south of Oakover
• 57.5 Mt @12.2% Mn Inferred Mineral Resource
NEWMAN
2
1
WANDANYA
3
• Similar geology to Oakover
• Exploration focused, high-grade, Direct Shipping Ore potential
• 50km southwest of world class Woodie Woodie Manganese Mine
PERTH
• Rock chip results up to 64.9% Mn and 55.2% Mn
21
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23 and 30/8/23,
MANGANESE RESOURCES SNAPSHOT
Significance of the Oakover Manganese Project cannot be underestimated from the perspective of global supply, with
continued decline of worldwide manganese production grades and limited number of ASX manganese developers
GHANA (~6% of Seaborne Trade)
• Full carbonate ore
• Overall grade decreasing
• 27% Mn
• Production grown under Chinese ownership
GABON (~20% of Seaborne Trade)
• Oxide Ore
• Only county to significantly increase high grade (>40% Mn) ore
production
SOUTH AFRICA (~50% of Seaborne Trade)
• Semi Carbonate
• Overall grade decreasing
• Production mainly 35-37% Mn (semi-Carbonate ore)
• Grown from 18% in 2011 to 39% in 2022 of World (IMnI)
• However, plagued with logistics issues
• Semi Carbonate most suited to steel production
CHINA
• Mainly carbonate ore
• Combination of depleting resources and environmental
policies making mines unprofitable
• Overall grade decreasing
• Production decreasing
• Largest market for Mn ore
• Imports grow each year (currently ~30Mtpa)
AUSTRALIA (~16% of Seaborne Trade)
• Oxide ore
• Overall grade and production decreasing
• Several existing producers
• Some of existing mines approaching end of mine life and
processing tailings
22
OAKOVER - LARGE RESOURCE WITH STRONG GROWTH UPSIDE
• Firebird has successfully explored and developed Oakover into a sizeable
manganese project, with exciting growth potential
• Development work, including completion of a Dense Media Separation (DMS)
Manganese Concentrate Scoping Study and Sulphate Study highlghted the Project
as a long-life, high-quality operation
• The Company’s primary focus is on the execution of its China-based LMFP battery
strategy; however, development and environmental work will continue throughout
2024, with key activities including:
•
Environmental surveys and studies to be completed in Q1 and Q2 2024
•
Diamond drill program for ongoing metallurgical test work to be completed in Q1
2024
•
PFS metallurgical test work program
•
Hydrology/water monitoring
•
Finalisation of the Mining Lease Application, including native title and heritage
negotiations
• Execution of these workstreams will see Firebird successfully deliver on its
vision to become a global leader in the manganese industry, combining
mining and downstream processing and building WA’s next major manganese
operation
23
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23 and 30/8/23,
ESG
Firebird’s ESG methodology plays a crucial role in our planning and business operations, including:
CORPORATE GOVERNANCE
SYSTEM
HUMAN RESOURCES
MANAGEMENT SYSTEM
SUPPORT FOR LOCAL
COMMUNITIES
OPERATIONAL
MANAGEMENT
Establishing a sound corporate
governance structure to ensure
transparency, accountability,
and compliance. This includes
effective board operations,
reasonable e
Share your feedback
Discover