Firebird Metals Investor Presentation
Released
Released
Announcement PDF
FIREBIRD METALS
Manganese: From Critical Mineral to Next
Generation Battery Material
A Fully Integrated Proprietary Platform
Investor Roadshow | August 2026
ASX: FRB
firebirdmetals.com.au
firebirdmetals.com.au
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Why Firebird,
why now
TRANSFORMING A FRAGMENTED, MULTI - FACILITY, MULTI - COUNTRY CRITICAL MINERALS AND BATTERY SUPPLY CHAIN INTO A
SINGLE INTEGRATED PROCESS
Four catalysts converging behind a single,
sovereign manganese -to-cathode platform.
World -first Tech
Perth site readiness underway.
Equipment arrival, assembly and
commissioning Q4 2026.
Government -validated
A$2M ARENA grant, non -dilutive; first
A$1.0M milestone payment received.
Defensible IP to 2045
Five core LMFP patents under
exclusive ex -China licence ; high -
efficiency kiln patent
Upstream optionality
234 Mt of WA manganese resources
at Oakover and Hill 616, ore -agnostic
flowsheet.
2
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
3
From concentrate to
cathode in one circuit
INTEGRATED PROCESS
Mn
Concentrate
Feedstock
HPMSM
purified metal
FIREBIRD PROPRIETARY MN CONCENTRATE TO CAM PROCESS
LMFP & LMR
battery cathode
A focused Australian processor pairing proven IP with the only Western fully integrated manganese -to-CAM facility
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
4
Sovereign western HPMSM &
cathode production
STRATEGIC SIGNIFICANCE
Battery materials processing is concentrated
in China. Western OEMs, energy storage
developers and governments need an
alternative.
TODAY
Concentrated,
dependent supply chain
WITH FIREBIRD'S ADP
First credible Western
pathway
Virtually all global battery
materials produced in China
Fragmented, multi -facility,
multi-country processing
Critical vulnerability for
Western OEMs, ESS
developers and governments
Identified as a strategic
priority across AU, US, EU,
Japan, Korea
Only fully integrated Mn -to-
CAM facility outside China
First -tier mining jurisdiction
(Australia)
Aligned with AU Critical
Minerals Strategy and Net
Zero 2050
Commercial pathway via
licensing, JVs, equipment
sales and CAM offtake
AUSTRALIAN DEMONSTRATION PLANT
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Perth Site Ready for Deployment
Osborne Park
ADP - SITE SECURED
April 2026: Multi year lease over a 775 sqm purpose -fit facility
August 2026: Moved into site.
13 Sangiorgio Court
Osborne Park, Perth WA
~7 km from Perth CBD
10 min drive time
Multi year lease + options to extend
775sqm light -industrial footprint
Capital -light deployment with room to scale.
Sufficient three -phase
grid power (+ solar)
Light industrial zoning aligned to
planned activities
Suitable building footprint, layout and
scale -up flexibility
SITE SELECTION
RATIONALE
Proximity to engineering services and
skilled workforce
Excellent access for customer, OEM and
investor site visits
Capital -light pathway from demo to
commercial deployment
Source: ASX announcement, 30 April 2026
6
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
ADP - SITE SECURED
7
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
8
ADP Site Layout
ADP - SITE SECURED
“The ADP is designed to demonstrate Firebird's
world-first, fully integrated technology platform,
converting manganese ore directly into high-
purity manganese sulphate monohydrate
(HPMSM), precursor cathode active material (p-
CAM), and finished cathode active material
(CAM) within a single facility and process line.
This integrated approach removes conventional
intermediate processing steps, delivering
significant energy, capital and operating cost
advantages.”
Source: ASX announcement, 30 April 2026
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
A world -first,
end-to-end manganese
cathode facility
AUSTRALIAN DEMONSTRATION PLANT
From manganese concentrate to high purity manganese
sulphate to advanced cathode active material (CAM) in a
single integrated process line, the first outside China.
1st
Outside China
100%
Integrated process
1st
Quartile of the
technology cost curve
150+
Batches outperforming
China Industry Standards
WHY IT
MATTERS
De-risked
China -developed process know -
how with Western engineering,
safety and regulatory standards.
Proven
End -to-end process demonstrated
across multiple campaigns at our
wholly owned Hunan pilot plant.
Flexible
Ore -agnostic feedstock; circular by -
product recycling for a zero -tailings
system.
WHAT IT
PRODUCES
HPMSM
High -purity manganese sulphate
monohydrate.
p-CAM
Precursor cathode
active material.
CAM
Finished LMFP and LMR
cathode active material for
OEM qualification, licensing
and product sales.
9
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
10
ASX: FRB firebirdmetals .com.au
Australian Demonstration Plant
CY 2026 Development Timeline
ACTIVITY Q1 Q2 Q3 Q4
IP Licence Agreement
Federal Government Grant Funding
Site Selection
Equipment Order
Site Readiness
Equipment Delivery
ADP Assembly & Commissioning
ADP Sample Production
Customer / Investor / Govt Site Visits
Australia Patent Application
China Pilot Plant LMR Development
10
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
FEDERAL GOVERNMENT BACKING
A$2.0M ARENA grant secured, A$1.0M received
Non -dilutive funding under the Battery
Breakthrough Initiative, validating Firebird's
technology platform and delivery track record
A$2.0M
ARENA grant secured | A$1.0M received
Non -dilutive • No IP rights granted • Matched 1:1 by Firebird
Battery Breakthrough Initiative
Federal Government Program | National Battery Strategy
GRANT VALIDATION AND DELIVERY
Technical viability
Independent technical review confirms the integrated manganese -to-CAM platform is credible
and commercially relevant.
Strategic alignment
Direct fit with Australia's Critical Minerals Strategy, energy storage priorities and Net Zero 2050
commitments.
Milestone 1 complete: A$1.0M received
Osborne Park ADP site secured, all key equipment ordered and Risk Management Plan accepted
by ARENA, ahead of schedule and within budget.
Milestone 2 underway
Firebird relocating to the Osborne Park ADP facility; remaining A$1.0M payable across coming
milestones.
ARENA CEO Darren Miller: "…an important step toward building domestic capability
to convert Australian manganese into battery cathode materials."
11
ASX: FRB firebirdmetals .com .au
11
Source: ASX announcement, 23 April and 17 July 2026
THE PROVEN INTEGRATED PROCESS
Delivering exceptional performance and cost metrics
benchmarked against China Industry Standards
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
13
Proven, patented, ready to deploy
TECHNOLOGY FOUNDATION
ADP de -risked by an operating pilot plant, an extensive patent portfolio and a sector -leading technical team
650 sqm
HUNAN
PILOT PLANT
5+1
LMFP &
KILN PATENTS
+50 yrs
MANGANESE
EXPERTISE
Operating since Dec 2023
with multiple successful
concentrate -to-cathode
campaigns
Five core LMFP patents
under exclusive ex -China
licence through 2045,
plus high -efficiency
electric calcination kiln
patent
Combined manganese,
battery and resource
sector experience
across the team that
is unmatched in Western
markets
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
14
ASX: FRB
Fully operational since 2023 - Multiple Manganese Battery Chemistry Capabilities
firebirdmetals .com.au
Leaching/
Filtration /
Impurity
Removal
Mn
concentrate
Reduction
Roasting
LMFP and
LMR CAM
Co -
precipitation
MFP and LMR
p-CAM
CAM Process
Milling, Metal
Doping and
Spray drying
CELL Maker
(customer)
CAM
Process
Sintering and
Jet Milling
Pristine
HPMS
(solution)
Advanced China R&D & Pilot Plant Facility
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
15
Customer testing
confirms >99.99%
purity
INDEPENDENT VALIDATION – High Purity Manganese Sulphate
Independent international customer testing exceeds
Chinese industry standards across all key parameters
PURITY
>99.99%
MnSO₄ purity confirmed by international
customer testing in June 2026.
GRADE
32.6%
Manganese content exceeds the
Chinese Superior Grade benchmark of
32.18 Wt.%.
IMPURITIES
<0.5 ppm
Most impurity elements below detection
limits, validating in -line impurity removal.
IMPURITY LEVELS BENCHMARKED TO CHINA INDUSTRY STANDARD
Element China standard (Superior) Firebird HPMSM (Jun 2026)
Iron (Fe) ≤ 10 ppm <0.5 ppm
Copper (Cu) ≤ 10 ppm <0.5 ppm
Lead (Pb) ≤ 10 ppm <0.5 ppm
Chromium (Cr) ≤ 10 ppm <0.5 ppm
Aluminium (Al) ≤ 10 ppm <0.5 ppm
Potassium (K) ≤ 30 ppm <0.5 ppm
Calcium (Ca) ≤ 50 ppm <0.5 ppm
Sodium (Na) ≤ 100 ppm 2.6 ppm
HPMSM battery -grade prices up 23% year -to-date, on growing EV and storage demand
(SMM, June 2026)
Source: ASX announcement, 2 July 2026
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
16
LMR cathode matches commercial benchmark
LMR CATHODE PROGRAM
One of the first western companies to report Independent electrochemical testing
Confirms Firebird's proprietary LMR cathode performance in line with commercial benchmark material
263.7
mAh/g DISCHARGE
CAPACITY (0.1C)
+65%
VS TYPICAL LFP
CATHODES
20
SYNTHESIS
CAMPAIGNS
0.1C discharge capacity of
263.7 mAh/g and 1C
capacity of 211.2 mAh/g, in
line with commercially
sourced benchmark
material
Approximately 65% higher
discharge capacity than
typical LFP and 26% higher
than high -nickel NCM
cathode materials
Among the first Western -
listed companies to
publicly report
electrochemical
performance data for
proprietary LMR cathodes
160
210
261.3 263.7
LFP NCM LMR ref. Firebird
LMR
0.1C discharge capacity (mAh/g)
Source: ASX announcement, 20 July 2026
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
17
Commercial Opportunity
TECHNOLOGY POSITIONED ON THE FIRST QUARTILE OF THE COST CURVE IN A MARKET THAT IS GROWING SIGNIFICANTLY
Firebird maintains the lowest OPEX among
global manganese sulphate producers
1,577
1,294 1,250
790
579
0
300
600
900
1200
1500
1800
Euro Manganese
Study (ASX ann.
14/5/2026)
E25 Feasibility,
Train 1 (ASX
12/4/2023)
Benchmark Mineral
Intelligence: China
EMM route (Apr
2024)
Benchmark Mineral
Intelligence: China
ore to sulphate,
44% Mn (Apr 2024)
Firebird Feasibility
plus kiln savings
US$579/t¹
SMM price, May 2026
0
500
1000
1500
2000
2500
3000
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
0
1000
2000
3000
4000
5000
6000
Bloomberg GWh forecast (Dec 2025) and FRB
HPMSM demand (kt)
HPMSM demand (kt) Global GWh
GWh kt
Source ; Bloomberg GWh forecast (Dec 2025), Firebird -derived HPMSM demand.
US$/t
Source: ASX announcement, 7 May 202 4
THE MARKET DRIVERS
FIREBIRD METALS
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
19
The shift to
manganese -rich
cathodes
MARKET DRIVER
Manganese is cheaper, safer, more abundant and
supply -secure, and it is moving up the cathode mix
TODAY
LFP
Lithium Iron Phosphate dominates
~80% of cathode market.
EMERGING
LMFP
Lithium Manganese Iron Phosphate,
rapid adoption from 2028.
THE FUTURE
LMR
Lithium Manganese Rich, mass adoption
after 2030.
Manganese content of cathode (%)
0
15
20
25
>50
-5
5
15
25
35
45
55
65
LFP NCM Sodium-Ion LMFP LMR
Firebird Tech
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
20
LMR v NCM: delivers
~1/3 the p -CAM raw -
material cost
MARKET DRIVER
vs high -nickel NCM811: comparable high
energy density at a fraction of the input cost
Raw -material cost per tonne of p -CAM (¥)
0
20000
40000
60000
80000
100000
120000
NCM811 LMR (75 Mn:25 Ni)
Nickel (NiSO₄) Cobalt (CoSO₄) Manganese (MnSO₄)
Source: Firebird analysis of China domestic raw -material prices
NICKEL
NiSO₄ NCM811: ¥76,494 → LMR: ¥24,525
COBALT
CoSO₄ NCM811: ¥28,637 → LMR: —
MANGANESE
MnSO₄ NCM811: ¥1,400 → LMR: ¥10,787
Firebird LMR
75% Mn content represents only 30% of the total cost
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
21
Strong fit across the defence battery value chain
DEFENCE APPLICATIONS
LMFP and LMR address distinct defence requirements, from low -cost attritable drones to high -energy missile -replacement systems
Soldier systems
Portable power. LMFP for safety,
durability and portability.
Remote power
Strongest LMFP use case: long -
duration reliability for forward
operating bases.
Swarm / attritable drones
Cost -driven, high -volume LMFP
deployment for thousands of units.
Loitering munitions
LMFP and LMR for high -performance,
longer -range systems.
Military vehicles
Dual chemistry pathway: LMFP safety
with LMR energy density for ground
platforms.
Naval / submarines
LMFP thermal stability for safety -
critical applications below deck.
Western chemistry. Sovereign supply.
Defence -ready platform
OAKOVER MANGANESE PROJECT
100% owned
Granted mining lease
176Mt JORC resource
Tier 1 mining jurisdiction
FIREBIRD METALS
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
23
100% Owned Oakover
Manganese Project
UPSTREAM SECURITY
234 Mt of manganese resources in
Western Australia provides long -term
feedstock optionality for the ADP
176.65 Mt
Oakover JORC Resource
@ 9.9% Mn
73%
IRR
(DMS scoping study, 2023)
A$741M
NPV
@ 8% discount rate
18 yrs
Life of Mine
JORC Mineral resource estimate
Classification Tonnes (Mt) Mn (%) Fe (%) SiO₂ (%) Al₂O ₃ (%) P (%)
Indicated 105.78 10.1 8.9 39.2 9.8 0.10
Inferred 70.87 9.6 8.0 36.5 9.5 0.09
Total 176.65 9.9 8.6 38.1 9.7 0.10
HILL 616 +
57.5 Mt
@ 12.2% Mn (Inferred)
Total 234 Mt
across Firebird's WA portfolio.
Source: ASX announcements, 23 March 2023 and 30 August 2023
Source: ASX announcement s, 23 March 2023 and 30 August 2023
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Mining
Lease
Firebird has been granted
Mining Lease
ML 52/1086
for the Oakover Manganese Project
Receipt of the Mining Lease is
conditional on the Company’s
development of a mining proposal,
requiring approval from the
Department of Energy, Mines,
Industry Regulation and Safety
(DEMIRS)
The Mining Lease covers a large area
of 3,429.8 ha, including the Sixty
Sixer, Jay Eye and Karen Pits, as well
as proposed processing plant,
tailings storage and waste dump
DMS Manganese concentrate
scoping study
Updated Dense Media Separation (DMS)
Manganese Concentrate Scoping Study
(30/8/23) results confirm flagship Oakover
Project as long -life, tier -one manganese
operation.
18-year Life of Mine
Approximate A$741.3 M NPV at a
discount rate of 8% , Impressive IRR of
73.1%, with pay back in 16 months
~4Mt annual processing, ~1.2 Mt of 30 -32
% Manganese (Mn) concentrate annually
Capex estimated of A$123 million
Low mine strip ratio of 0.45:1
Indicated material accounts for 99.2% of
the material processed
Key results include
Environmental surveys/studies
Flora, Fauna, Sub
Terranean Fauna,
Aquatic Fauna
surveys complete
Desk top Water
study complete
Source: ASX announcement, 18 March 2025
Source: ASX announcement, 18 March 2025
LEADERSHIP & CORPORATE
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
26
Sector -leading Battery Materials Australian -Chinese team
LEADERSHIP
Over 50 years of combined manganese expertise paired with
deep battery materials and capital markets experience
Evan Cranston
Executive Chairman
Mining executive; corporate &
mining law background.
Ron Mitchell
Chief Executive Officer
25+ yrs commercial, strategy &
BD; 15 yrs in lithium and
battery materials.
Wei Li
Executive Director
Chartered Accountant; led
commissioning of A$150M
EMD plant, Hunan.
Ashley Pattison
Non -Executive Director
Chartered Accountant; 20+ yrs
in resources operations,
finance & strategy.
Brett Grosvenor
Non -Executive Director
25+ yrs mining & power
industry; engineering & MBA
qualified.
Ken Hoffman
Special Advisor (Board)
Former Global Head of Battery
Materials, McKinsey; battery
value chain strategy.
Peter Allen
Key Consultant
20+ yrs marketing manganese,
lithium and other commodities.
Mr Zhou Qiyun
China CTO
20+ yrs in Mn sulphate
processing; MVR crystalliser
design and patents.
Mr Tang
China CEO
Mn sulphate plant operations &
engineering; MVR
commissioning and process
optimisation .
+
Central South University partnership, global leaders in Li -ion battery
materials processes; alumni founded BYD and Ronbay Technology.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Corporate
Snapshot
Capital
structure
Board & Management 13.64%
Tolga Kumova 8.14%
Westbeck Capital Management 6.40%
Canmax Technologies 6.20%
Other Shareholders 65.62%
Global technology platform
Scalable IP model designed in China, owned in Australia, deployable worldwide
$0.165
Share price
7 August 2026
$30.09 M
Market
capitalization
0.8 M
Performance
rights
182.36 M
Shares on issue
49 M
Options
@ $0.3 to $1.00
$3.6 M
Cash on hand:
30 Jun 2026
(excludes $1.0 M received by ARENA on 17 July 2026)
Shareholders
ASX: FRB | firebirdmetals.com.au 27
THANK
YOU
ASX: FRB
firebirdmetals.com.au
firebirdmetals.com.au
RON MITCHELL
CHIEF EXECUTIVE OFFICER
ron.mitchell@firebirdmetals.com.au
+61 407 726 325
ASX: FRB
ASX: FRB | firebirdmetals.com.au
F I R E B I R D M E T A L S
1
Disclaimer
IMPORTANT INFORMATION
This presentation contains summary information about Firebird Metals Limited (Firebird) (ABN 24 610 035 535) and
is current as of July 2026. The information in this presentation is of a general background and does not purport to be
complete. This presentation is not investment or financial product advice (nor tax, accounting or legal advice) and is
not intended to be used for the basis of making an investment decision.
The information contained in this presentation has been prepared without taking into account the objectives,
financial situation or needs of individuals. Investors should obtain their own advice before making any investment
decision. Firebird has prepared this document based on information available to it at the time of preparation. No
representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the
information, opinions and conclusions contained in this presentation.
This presentation contains certain “forward-looking statements”. Forward looking statements can generally be
identified by the use of forward-looking words such as, “expect”, “should”, “could”, “may”, “predict”, “plan”, “will”,
“believe”, “forecast”, “estimate”, “target” and other similar expressions. Indications of, and guidance on, future
earnings and financial position and performance are also forward-looking statements. Forward- looking statements,
opinions and estimates provided in this presentation are based on assumptions and contingencies which are
subject to change without notice, as are statements about market and industry trends, which are based on
interpretations of current market conditions. Forward-looking statements including projections, guidance on future
earnings and estimates are provided as a general guide only and should not be relied upon as an indication or
guarantee of future performance
This presentation contains statements that are subject to risk factors associated with Firebird and the mining
exploration industry. It is believed that the expectations reflected in these statements are reasonable, but they may
be affected by a range of variables which could cause actual results or trends to differ materially. Firebird disclaim
any intent or obligation to publicly update any forward-looking statements, whether as a result of new information,
future events or results or otherwise. To the maximum extent permitted by law, Firebird, their related bodies
corporate (as that term is defined in the Corporations Act 2001 (Cth) and the officers, directors, employees, advisers
and agents of those entities do not accept any responsibility or liability including, without limitation, any liability
arising from fault or negligence on the part of any person, for any loss arising from the use of the presentation or its
contents or otherwise arising in connection with it.
This presentation has been approved by the Board of Firebird.
JORC COMPLIANCE
This presentation contains references to Exploration Results and Mineral Resource Estimates, which
have been reported in compliance with ASX Listing Rules 5.7 and 5.8 and extracted from previous ASX
announcements as referenced. The Company confirms that it is not aware of any new information or
data that materially affects the information included in the said announcements, and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcements continue to apply and have not
materially changed.
The Company confirms that the material assumptions and technical parameters underpinning the
production target disclosed in the Company's announcement dated 7 May 2024 continue to apply and
have not materially changed.
Oakover Resource: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for
global Resource of 176.7 Mt at 9.9% Mn
Hill 616 Resource: Inferred Resource of 57.5 Mt at 12.2% Mn
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23, 30/8/23, 1/9/23,
18/10/23, 21/11/23, 13/12/23, 29/1/24, 13/3/24, 7/5/24, 14/5/24, 28/5/24, 5/6/24, 10/9/24, 12/9/24,
24/9/24, 2/10/24, 21/10/24, 28/10/24, 9/12/25, 10/2/25, 20/2/25, 18/3/25, 12/5/25, 24/6/25, 21/7/25,
30/7/25, 5/8/25
CAUTIONARY STATEMENTS
SULPHATE FEASIBILITY STUDY
The Feasibility Study referred to in this presentation is a Technical Feasibility of the establishment of
the Battery Grade Manganese Sulphate Project Stage 1 Processing Plant in China (the Plant). The
Feasibility Study is based on the material assumptions contained in the Feasibility Study document
released to the ASX on 7 May 2024. These include assumptions about the availability of funding. While
the Company considers all of the material assumptions to be based on reasonable grounds, there is
no certainty that they will prove to be correct or that the range of outcomes indicated by the Feasibility
Study will be achieved.
Notwithstanding the developments set out in this quarterly report, Investors should note that there is
no certainty that the Company will be able to raise the amount of funding to develop the Plant when
needed. It is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of Company’s existing shares. It is also possible that the Company could
pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the Plant. If it
does, this could materially reduce the Company’s proportionate ownership of the Plant. Given the
uncertainties involved, investors should not make any investment decisions based solely on the
results of the Feasibility Study.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Cautionary statements
DMS Concentrate Scoping Study
The Updated Scoping Study announced to the ASX on 30 August 2023 has been undertaken for
the purpose of initial evaluation of a potential development of the Oakover Manganese Project.
The Scoping Study is a preliminary technical and economic study of the potential viability of the
Oakover Manganese Project as a manganese producer. The Scoping Study outcomes,
production target and forecast financial information referred to in this release are based on low
accuracy level technical and economic assessments that are insufficient to support estimation
of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/ - 35% in line with a scoping
level study accuracy. While each of the JORC modifying factors was considered and applied,
there is no certainty of eventual conversion to Ore Reserves or that the production target itself
will be realised. Further exploration and evaluation work and appropriate studies are required
before the Company will be in a position to estimate any Ore Reserves or to provide any
assurance of an economic development case. Accordingly, given the uncertainties involved,
investors should not make any investment decisions based solely on the results of the Scoping
Study. Given that the results of the Scoping Study are subject to the qualifications above
(including assumptions as to accuracy), any results reported in this release should be considered
as approximates and subject to variances having regard for the assumptions referred to in this
release. The Company has reasonable grounds for disclosing a Production Target, given that
approximately 99% of the Life -of-Mine (LOM) Production Target is in the Indicated Mineral
Resource category, and 1% is in the Inferred Mineral Resource category. The production target
stated in this announcement is based on Firebird’s current expectations of future results or
events and should not be relied upon by investors when making investment decisions. Further
evaluation work and studies are required to establish sufficient confidence that the production
target will be met. Firebird confirms that the financial viability of the Oakover Manganese
Project is not dependent on the inclusion of Inferred Resources in the Scoping Study.
The Company considers all the material assumptions in this Study to be based on reasonable
grounds. These include assumptions about the availability of funding. While Firebird considers
all of the material assumptions to be based on reasonable grounds, there is no certainty that
they will prove to be correct or that the range of outcomes indicated by the Scoping Study will
be achieved. To achieve the range of potential outcomes indicated in the Scoping Study,
funding of in the order of $123 million (excluding working capital and finance costs) will likely be
required. Investors should note that there is no certainty that Firebird will be able to raise that
amount of funding when needed. However, the Company has concluded it has a reasonable
basis for providing the forward -looking statements included in this announcement and believes
that it has a "reasonable basis" to expect it will be able to fund the development of the Project. It
is also possible that such funding may only be available on terms that may be dilutive to or
otherwise affect the value of Firebird’s existing shares. It is also possible that Firebird could
pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the
project. If it does, this could materially reduce Firebird’s proportionate ownership of the project.
Given the uncertainties involved, investors should not make any investment decisions based
solely on the results of the Scoping Study.
The Mineral Resources underpinning the production target in the Scoping Study have been
prepared by a competent person in accordance with the requirements of the JORC Code
(2012). For full details of the Mineral Resources estimate, please refer to Firebird’s ASX release
dated 23 March 2023. Firebird has confirmed that it is not aware of any new information or data
that materially affects the information included in that release. All material assumptions and
technical parameters underpinning the estimates in that ASX release continue to apply and have
not materially changed.
30