JUNE 2026 QUARTERLY ACTIVITIES REPORT
Q2 CY2026 Highlights
• A$2,000,000 ARENA grant awarded. Firebird was awarded a A$2 million Federal
Government grant under ARENA’s Battery Breakthrough Initiative (BBI) Program, a major
independent validation of Firebird’s proprietary technology platform. The grant will
support the development of the Australian Demonstration Plant (ADP), is non-dilutive and
does not grant ARENA any rights to Firebird’s current or future intellectual property.
• Perth site secured and lease executed for the ADP. Firebird executed a multi-year lease
over a 775 sqm purpose-fit light industrial facility in Osborne Park, Perth, to house the
ADP, the only fully integrated manganese concentrate-to-cathode active material
processing facility outside China.
• All key equipment orders placed for the ADP. All long-lead equipment orders were
placed for the ADP, unlocking the first payment of ARENA grant funding.
• ADP development advancing on schedule. ADP development remains on schedule and
on budget, with equipment shipment to Australia anticipated early Q4 2026. The ADP
remains on track for assembly and commissioning in 2026, targeting a world-first
capability to produce aa range of advanced battery materials within a single integrated
facility outside China.
• Subsequent to the end of the reporting period, independent international customer
testing confirmed Firebird’s production of ultra-high purity manganese sulphate
(MnSO₄) exceeding 99.99%, with impurity levels across all key parameters significantly
below Chinese industry standards.
• Cash: At 30 June 2026 was A$3.6m (excludes the $1.0m cash grant received by ARENA
on 16 July 2026).
Figure 1: ADP property located in Osborne Park, Perth.
2
Australian-owned Firebird Metals Limited (ASX: FRB, Firebird or the Company) is
pleased to provide an update on its activities for the quarter ended 30 June 2026 (“the
Quarter”).
Firebird CEO, Mr Ron Mitchell, commented:
“The June quarter marked the transition of the Australian Demonstration Plant from planning
into delivery. Securing our purpose-fit Perth facility in Osborne Park and placing all key long-
lead equipment orders were two defining milestones that together commence the busiest and
most transformative operational phase in Firebird’s history.
“The placement of equipment orders unlocked the first payment of our A$2 million ARENA
Battery Breakthrough Initiative cash grant, with site readiness activities underway in
preparation for equipment dispatch to Australia in the coming months. Subsequent to quarter
end, independent international customer testing confirmed our ability to produce high purity
manganese sulphate exceeding 99.99% with extremely low impurities, providing valuable
third-party validation of our processing technology.
“As we advance the ADP toward assembly and commissioning later this year, we continue to
make strong progress in engagement with prospective customers, strategic partners and
potential funding counterparties. We look forward to updating the market on these initiatives
in the coming quarters.”
Manganese-Rich Battery Strategy: From Planning to Delivery
Australian Demonstration Plant: Perth Site Secured
On 30 April 2026, Firebird executed a multi-year lease agreement over a 775 sqm
purpose-fit light industrial facility in Osborne Park, Perth, Western Australia, to house the
Company’s flagship Australian Demonstration Plant (ADP). The facility was secured
following an extensive site selection process encompassing technical, commercial and
regulatory due diligence across multiple candidate locations.
The multi-year lease with options to extend, provides long-term operational security to
scale demonstration activity and transition toward commercial-scale deployment.
Osborne Park is a well-established light industrial precinct located approximately 7 km
from the Perth CBD, offering sufficient three-phase grid power, appropriate zoning, a
deep local engineering skills base and excellent accessibility for customer, shareholder
and strategic partner site visits.
The ADP will be the only fully integrated manganese concentrate-to-cathode active
material (CAM) processing capability outside China, transforming what has traditionally
been a fragmented, multi-facility, multi-country supply chain into a single integrated
process. Execution of the lease satisfied a key deliverable under Milestone 1 of the
Company’s A$2,000,000 ARENA Battery Breakthrough Initiative (BBI) grant.
3
Following execution of the lease, the Company advanced detailed fit-out design and
procurement of long-lead equipment, enabling Firebird to progress directly to site
mobilisation.
Figure 2: Location of the ADP site in the Perth Metropolitan Area.
Figure 3: Model diagram and layout (matching the Osborne Park property) of the proposed Australian
Demonstration Plant (ADP) to be constructed in Perth, Western Australia.
4
All Key Equipment Orders Placed for the ADP
On 16 June 2026, Firebird announced that formal equipment orders had been placed for
all long-lead items required to construct the ADP, completing key deliverables under
Milestone 1 of the Company’s ARENA grant funding. The orders were placed by Firebird’s
wholly owned Chinese subsidiary, Jinshi Firebird Trading Co., Ltd, under a fully executed
Intercompany Procurement and Sourcing Agreement and Equipment Export Sales
Contract.
The orders cover four integrated equipment and services packages:
• HPMSM and precursor cathode active material (p-CAM) pilot equipment;
• manganese-based CAM pilot equipment;
• testing and analytical instruments;
• and technical services covering detailed design, commissioning, sample
production and operator training.
All equipment is being manufactured to Australian electrical, voltage, cable and safety
standards, incorporating certified components from tier-one brands. In conjunction with
the orders, Firebird executed a licence agreement permitting export of the contracted
equipment and granting exclusive use of the associated technology patents underpinning
the ADP process flowsheet. ADP development remains on schedule and on budget, with
all key equipment expected to arrive in Australia early Q4 2026, followed by construction
and commissioning at the Perth site.
Figure 4: All key equipment for the ADP has been ordered, replicating a proven advanced manganese
battery materials flowsheet from our China Pilot Plant.
5
LMR and MFP Cathode Programs: Building Toward Customer Samples
Firebird continued to advance its lithium manganese rich (LMR) technology development
programs during the Quarter. Development work on the Company’s LMR cathode
technology progressed at the China Pilot Plant, with initial LMR cathode performance
results anticipated to be released in the September quarter. The LMR program continues
to be co-funded by strategic partner Taza Metal Technologies, which has committed to
fund 50% of the LMR research and development activities. The manganese iron
phosphate (MFP) precursor qualification program also continued, building on results
demonstrating that all key technical and performance parameters exceed Chinese
industry standards (T/CIAPS0029–2023), including approximately 33% lower impurity and
approximately 25% higher tap density, underpinning ongoing customer sampling and
commercial engagement activities.
ADP Development Activities: A Catalyst-Rich Window
Development of the ADP accelerated materially during the Quarter, transitioning from
planning into active delivery in line with the Company's 2026 development timeline.
Key progress included:
Site Secured: Firebird executed a long-term, capital-light lease over a 775 sqm purpose-
fit facility in Osborne Park, Perth, satisfying a key Milestone 1 deliverable under the ARENA
BBI grant and enabling fit-out design and site mobilisation to commence.
Equipment Orders Placed: All key long-lead equipment orders were placed during the
Quarter across four integrated equipment and services packages spanning the ADP's fully
integrated flowsheet, from manganese concentrate through HPMSM, p-CAM and finished
CAM, commencing a short-term fabrication and Factory Acceptance Testing (FAT)
program with shipment to Australia anticipated early Q4 2026.
Engineering, Licence and Design: Detailed fit-out design progressed, integrating China-
developed process know-how with Western engineering, safety and regulatory standards
(including AS1210/ASME-compliant pressure vessels and advanced automation systems).
Firebird also executed a licence agreement permitting export of the contracted
equipment and granting exclusive use of the technology patents underpinning the ADP
process flowsheet.
Firebird is engaging with reputable Australian-based engineering companies to support
key engineering, commissioning and operational activities for the ADP, ensuring the
Company executes a seamless integration of the ADP flowsheet in accordance with
Australian standards in relation to safety, risk and operational management systems.
The ADP will produce representative samples of HPMSM, p-CAM and CAM for initial
product validation with OEMs, cell manufacturers and cathode producers, facilitating a
commercialisation pathway via technology licensing agreements, joint ventures and
product sales.
6
Figure 5: Australian Demonstration Plant key catalyst timeline.
A$2,000,000 ARENA Grant Awarded: Milestone 1 Advancing
On 23 April 2026, Firebird was awarded a milestone structured A$2,000,000 grant from
the Australian Renewable Energy Agency (ARENA) under its Battery Breakthrough
Initiative (BBI) Program to support the development of the ADP. The award followed an
extensive due diligence process, including independent technical review, and represents
a significant endorsement of Firebird’s proprietary manganese processing technology
and the strategic importance of establishing cathode active material production capability
in a Western jurisdiction. Grant activities are structured across three milestones: Project
Commencement, Site Selection and Equipment Procurement (Milestone 1); Construction
and Equipment Installation (Milestone 2); and Commissioning and Operations (Milestone
3).
During the Quarter, Firebird progressed key deliverables under Milestone 1 of its
A$2,000,000 non-dilutive, cash-based ARENA grant. Execution of the Perth site lease and
the placement of all long-lead equipment orders form part of the Milestone 1
deliverables, progressing the Company toward receipt of the Milestone 1 cash payment.
The ARENA grant is non-dilutive and does not grant ARENA any rights to Firebird's current
or future intellectual property. Grant funding will be matched by the Company's existing
funds at hand and directly supports equipment purchasing, commissioning and
operation of the ADP.
The Company continues to receive strong inbound interest from potential strategic
partners, including OEMs, battery producers and end-users seeking access to non-China
sources of manganese-based battery materials, and will provide further updates as
material developments arise.
Corporate and Investor Engagement
Active Investor Engagement Program
Firebird maintained an active investor, industry and government engagement program
throughout the Quarter, engaging brokers, institutions, family offices and sophisticated
retail investors on the Company's concentrate-to-cathode strategy, the role of LMFP and
LMR, the ADP development pathway, and Firebird's IP positioning in a tightening battery
materials market. CEO Ron Mitchell presented at the Critical Minerals Australia
Conference in Perth as an invited speaker, where he also joined the opening panel on
building global partnerships for secure supply chains, and presented to investors at The
Stock Network's ASX Gems Investment Conference. Ron also attended a number of
7
industry and government events during the Quarter, including the AmCham WA Critical
Minerals Business Lunch featuring the WA Minister for Mines and Petroleum, Hon David
Michael MLA, and the US Consul General, a Gilbert + Tobin boardroom dinner with The
Hon. Ambassador Joe Hockey (ret.), and a Macquarie Group resources lunch with Chief
Economist Ric Deverell. The Company intends to continue this program throughout 2026
and welcomes further approaches for one-on-one or small group meetings.
Strategic and government alignment
Firebird's integrated manganese-to-cathode technology platform and the ADP remain
strongly aligned with global government priorities around critical minerals processing,
sovereign battery manufacturing capability, supply chain resilience and Net Zero 2050
commitments.
The Board is confident that the combination of Firebird's independently validated
technology, secured IP position, proven pilot plant results, and the strategic imperative
for non-Chinese sources of manganese-based cathode materials positions the Company
well to access support to successfully implement the ADP and broader commercialisation
pathway.
Firebird continues to engage with Western OEMs, battery and cathode manufacturers,
and strategic investors to support sample qualification and commercial partnership
discussions linked to the ADP.
Outlook: Near-Term Catalysts (Q3 CY2026)
The approximately 90-day equipment fabrication period represents a catalyst-rich de-
risking window during which multiple value-driving milestones are expected.
Shareholders should anticipate a steady stream of material updates across the period,
including:
• LMR cathode performance results: Initial Lithium Manganese Rich (LMR)
cathode performance results from the China Pilot Plant, to be released.
• High Purity Manganese Sulphate results: Further results, in relation to the
Company’s high purity manganese sulphate product lines, to be released.
• Factory Acceptance Testing: Rolling FAT milestones across the HPMSM, p-CAM
and CAM equipment packages, with each anticipated as a discrete market update
ahead of shipment.
• Patent pipeline: Continued progress on additional manganese-based battery
materials patent applications as Firebird expands its intellectual property
portfolio.
• ADP site fit out and recruitment of key personnel: The Company will move into
the new ADP site in August and expects to announce the addition of key ADP
technical appointments.
• Shipment and site arrival: Consolidation, shipment, customs clearance and
arrival of all equipment, followed by assembly and commissioning activities in Q4.
• ARENA milestone payments and partnering: Further cash payments under the
ARENA milestone progression, together with strategic partner updates and
broader corporate developments as they arise.
8
Subsequent to the End of the Quarter
Subsequent to the end of the quarter, on 2 July 2026, Firebird announced that
independent international customer testing had confirmed the Company’s production of
high purity manganese sulphate monohydrate (HPMSM) exceeding 99.99%. In June 2026,
a potential international customer conducted independent testing of a Firebird HPMSM
sample produced at the Company’s Hunan pilot plant and Firebird’s in-line impurity
removal process, benchmarked against China national industry standards.
Across all measured impurity parameters, the Firebird sample significantly exceeded the
China industry standards, with the majority of elements recorded below 0.5 ppm
detection limits, with the manganese content of 32.6 Wt.% exceeding the Chinese
Superior Grade benchmark. These results provide valuable third-party validation of
Firebird’s ability to consistently produce battery-grade equivalent HPMSM and reinforce
engagement with prospective customers and strategic partners ahead of the production
of Australian-made qualification samples from the ADP.
Oakover Manganese Project, Western Australia
Oakover is Firebird's strategic 100% owned, upstream JORC resource intended to secure
long-term manganese supply for the battery materials business. The project hosts
favourable, near-surface mineralisation and prior metallurgical test work has
demonstrated the potential to produce battery-grade feed.
No significant activity or expenditure was undertaken at the Oakover
Project during the Quarter, with work limited to tenure maintenance and
desktop planning while focus remained on downstream LMFP/LMR and
ADP technology initiatives.
Quarterly Cashflow Disclosures
The Appendix 5B for the quarter ended 30 June 2026 provides an overview
of the Company’s financial activities.
Exploration expenditure for the Quarter was approximately $38,000 and primarily related
to environmental work and consulting fees.
Expenditure related to the development of the Chinese pilot plant was approximately
$258,000.
The total amount paid to Directors of the Company, their associated and other related
parties was $264,000 comprising salary, Directors’ fees and rent.
Cash and cash equivalents at Quarter end were approximately A$3.6m (excludes the
$1.0m cash grant received by ARENA on 16 July 2026).
- END -
This announcement has been approved for release by the Board.
9
For further information contact:
Ron Mitchell Gigi Penna
CEO Investor Relations
ron.mitchell@firebirdmetals.com.au +61 404 147 568
+61 407 726 325 FRB@calderahouse.com.au
About Firebird Metals Limited (ASX:FRB)
Firebird is an Australian battery materials technology company developing advanced
manganese-based lithium-ion battery materials for the EV and energy-storage
markets. Its proprietary, patented and exclusively licensed technology enables the
direct processing of manganese concentrate to cathode active materials (CAM) within a
single integrated process line, pairing a high-efficiency kiln and advanced crystallisation
with downstream processing know-how to target lower cost and energy use.
The Company's immediate focus is delivery of its Australian Demonstration Plant
(ADP) in Perth, supported by a $2 million grant from the Australian Renewable
Energy Agency (ARENA) under the Battery Breakthrough Initiative. The ADP, Australia's
first demonstration-scale facility processing manganese concentrate into high-purity
manganese sulphate (HPMSM) and downstream battery materials, including CAM, is
advancing rapidly through 2026. It builds on Firebird's operating pilot facility, which has
demonstrated the full flowsheet from manganese ore to high performance CAM, and
will validate the process under Australian conditions while delivering HPMSM and
cathode samples for customer qualification.
Firebird is advancing near-term HPMSM production for the lithium manganese iron
phosphate (LMFP) market, alongside a lithium manganese rich (LMR) program for next-
generation cathodes.
Firebird also holds 234 Mt of manganese resources in Western Australia, led by Oakover
(176.7 Mt at 9.9% Mn, including Indicated 105.8 Mt at 10.1% Mn1
) and Hill 616 (57.5 Mt at
12.2% Mn2
). The Company has the flexibility to source manganese ore through third‑party
suppliers and stockpiles, with mining optionality retained within its broader portfolio.
JORC Compliance Statement
This announcement contains references to Mineral Resource Estimates, which have been
reported in compliance with Listing Rule 5.8 (Oakover: 23 March 2023 – Indicated
Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource
of 176.7 Mt at 9.9% Mn; Hill 616: 1 December 2021 – Inferred Resource of 57.5 Mt at 12.2%
Mn) and extracted from previous ASX announcements as referenced. The Company
confirms that it is not aware of any new information or data that materially affects the
information previously reported and that all material assumptions and technical
parameters underpinning the Mineral Resource Estimates continue to apply and have
not materially changed.
1
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global
Resource of 176.7 Mt at 9.9% Mn.
2
See ASX announcement dated 1 December 2021: Inferred Resource of 57.5 Mt at 12.2% Mn.
10
ASX announcements made during the Quarter:
Date Announcement
23-Apr-26 Firebird Awarded A$2,000,000 in Federal Government Grant Funding
30-Apr-26 Firebird Secures Perth Site and Executes Lease for Australian
Demonstration Plant
20-May-26 Firebird Presentation Critical Minerals Australia Conference
16-Jun-26 All Key Equipment Orders Placed for Australian Demonstration Plant
02-Jul-26 International Customer Testing Confirms Production of >99.99% MnSO₄
(subsequent to quarter end)
Additional Listing Rule Information
The Company advises the following information in accordance with Listing Rule 5.3.3:
Western Australian
Project
Tenement Ownership at the
Start of quarter
Ownership at end of
Quarter
Oakover E 52/3577 100% 100%
Oakover E 46/1392 100% 100%
Oakover E 52/3948 100% 100%
Oakover E 46/1570 100% 100%
Hill 616 E 52/3633 100% 100%
Wandanya E 46/1456 20% 20%
Forward Looking Statements
This announcement may contain certain “forward-looking statements”. Forward looking
statements can generally be identified by the use of forward-looking words such as,
“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”,
“target” and other similar expressions. Indications of, and guidance on, future earnings
and financial position and performance are also forward-looking statements. Forward-
looking statements, opinions and estimates provided in this presentation are based on
assumptions and contingencies which are subject to change without notice, as are
statements about market and industry trends, which are based on interpretations of
current market conditions. Forward-looking statements including projections, guidance
on future earnings and estimates are provided as a general guide only and should not be
relied upon as an indication or guarantee of future performance.
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Firebird Metals Limited
ABN Quarter ended (“current quarter”)
24 610 035 535 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(38) (679)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (264) (1,121)
(e) administration and corporate costs (160) (1,200)
1.3 Dividends received (see note 3) - -
1.4 Interest received - -
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (GST refunds) 41 193
1.9 Net cash from / (used in) operating
activities
(421) (2,807)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (38) (313)
(d) exploration & evaluation (10) (68)
(e) investments - MnSO4+Mn3O4 plant
China
(258) (664)
(f) CAPEX - Australian demonstration
plant
(25) (25)
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
(g) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(331) (1,070)
3. Cash flows from financing activities
- 6,000
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- (403)
3.5 Proceeds from borrowings - 48
3.6 Repayment of borrowings (14) (52)
3.7 Transaction costs related to loans and
borrowings
(1) (3)
3.8 Dividends paid - -
3.9 Other - 392
3.10 Net cash from / (used in) financing
activities
(15) 5,982
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
4,374 1,502
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(421) (2,807)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(331) (1,070)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(15) 5,982
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
3,607 3,607
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 3,607 4,374
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
3,607 4,374
6. Payments to related parties of the entity and their
associates
Current quarter
$A’000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
254
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities n/a n/a
7.2 Credit standby arrangements n/a n/a
7.3 Other (please specify) n/a n/a
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end n/a
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
n/a
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (421)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(331)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (752)
8.4 Cash and cash equivalents at quarter end (item 4.6) 3,607
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 3,607
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
4.80
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: n/a
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: n/a
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
30 July 2026
Date: ...................................................................................
By the Board
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalen
Share your feedback
Discover