ARENA MILESTONE 1 COMPLETE
A$1,000,000 CASH PAYMENT RECEIVED
Site Development Activities Commenced at ADP site in Osborne Park, Perth
Highlights
• Firebird has received the first A$1.0 million cash payment under the Australian
Government's Australian Renewable Energy Agency (ARENA) Battery
Breakthrough Initiative (BBI) grant program.
• All key Australian Demonstration Plant (ADP) Milestone 1 deliverables have been
completed ahead of schedule and within budget, including site selection,
placement of all major equipment orders and completion of a comprehensive Risk
Management Plan.
• The non-dilutive ARENA funding is matched by existing Company cash reserves,
with a further A$1.0 million expected to be received over the coming quarters as
Firebird achieves additional ADP assembly and commissioning milestones.
• Firebird will relocate to the Osborne Park, Western Australia ADP facility next
month, with site establishment and Milestone 2 development activities now
underway.
• All major process equipment to be sourced from China has been independently
verified as compliant with Australian electrical standards following an in-
country inspection by the Company's Australian electrical contractor.
• Commercial engagement continues to accelerate across the global battery supply
chain, with multiple discussions progressing with leading international battery
manufacturers, automotive OEMs, and other downstream industry participants.
Figure 1. Firebird’s proprietary concentrate to HPMSM to lithium-manganese cathode process.
17 July 2026
2
Australian-owned Firebird Metals Limited (“FRB”, “Firebird” or “the Company”) is
pleased to announce that the Australian Renewable Energy Agency (“ARENA”) has
formally approved the Company’s completion of Milestone 1 under the A$2,000,000
Battery Breakthrough Initiative (“BBI”) grant program, triggering a A$1,000,000 non-
dilutive cash payment to Firebird.
All Milestone 1 deliverables have been completed ahead of schedule and within budget.
ARENA’s formal sign-off confirms that all required deliverables have met strict
compliance requirements of the Government agency, including site selection, full
equipment procurement, and submission and acceptance of a Risk Management Plan
for the ADP.
Firebird CEO, Mr Ron Mitchell, commented:
“Receiving this first milestone payment from ARENA is an important achievement for Firebird.
Beyond providing non-dilutive funding, it represents continued confidence from the
Australian Government in our technology, our execution capability, and our ability to deliver
this strategically significant project on schedule and within budget.
“With all major equipment now ordered and our Australian Demonstration Plant site in
Osborne Park secured, we are transitioning into the next phase of development as site
preparation activities advance ahead of equipment delivery, assembly and commissioning in
the coming months.
“The ADP is a critical step in Firebird's commercialisation strategy. It will provide an
integrated demonstration-scale platform to validate our proprietary processing technologies,
optimise manufacturing processes, produce customer qualification materials, and generate
the operational data required to support future commercial-scale deployment. As the first
advanced manganese battery materials facility of its kind outside China, the ADP is expected
to play a key role in accelerating strategic partnerships and underpinning Firebird's broader
global commercial growth strategy.”
Australian Demonstration Plant (ADP), Osborne Park, Perth
The ADP, designed to be the world’s first fully integrated manganese-to-cathode active
material (CAM) processing facility outside China, is now entering the site readiness,
equipment installation and commissioning phase. The facility is located at Osborne
Park, Perth, Western Australia.
Key activities completed under Milestone 1 include:
17 July 2026
3
• ADP site secured: The Company has secured the ADP premises in Osborne Park,
Western Australia, with a fit-for-purpose office fit-out and site preparation activities
now underway.
• All key equipment orders placed: As announced on 16 June 2026, all critical
equipment orders for the ADP have been placed, representing a significant project
milestone.
• Equipment compliance confirmed: The Company’s licensed Australian electrical
contractor recently completed an in-country inspection in China, meeting with
equipment vendors and confirming that all key equipment complies with applicable
Australian electrical standards.
• Risk Management Plan accepted: With support from a leading Australian
engineering firm, Firebird completed a formal Risk Management Plan for the ADP.
This key ARENA deliverable was completed ahead of schedule and has been
accepted by ARENA.
• Operational procedures finalised: All key operational procedures have been
translated into English and finalised. The Company has also commenced discussions
with a range of suitably qualified professionals interested in joining the first-of-its-
kind ADP project.
About the ARENA Battery Breakthrough Initiative
The Australian Renewable Energy Agency (“ARENA”) is an Australian Government agency
established to accelerate pre-commercial innovation in support of the global transition
to net zero emissions. The Battery Breakthrough Initiative (“BBI”) is a $500 million ARENA
program forming a key part of Australia’s National Battery Strategy, aimed at supporting
domestic battery manufacturing capability and supply chain resilience.
Firebird’s grant of up to A$2,000,000 is structured across three milestones. The grant is
non-dilutive and does not grant ARENA any rights to Firebird’s current or future
intellectual property. Project funding will be matched by Firebird’s existing funds at hand.
This announcement has been authorised for release by the Board of Firebird Metals
Limited.
For further information contact:
Ron Mitchell
CEO
E: ron.mitchell@firebirdmetals.com.au
Ph: +61 407 726 325
- END -
17 July 2026
4
About Firebird Metals Limited (ASX:FRB)
Firebird is an Australian battery materials technology company developing advanced
manganese-based lithium-ion battery materials for the EV and energy-storage
markets. Its proprietary, patented and exclusively licensed technology enables the
direct processing of manganese concentrate to cathode active materials (CAM) within a
single integrated process line, pairing a high-efficiency kiln and advanced crystallisation
with downstream processing know-how to target lower cost and energy use.
The Company's immediate focus is delivery of its Australian Demonstration Plant
(ADP) in Perth, supported by a $2 million grant from the Australian Renewable
Energy Agency (ARENA) under the Battery Breakthrough Initiative. The ADP, Australia's
first demonstration-scale facility processing manganese concentrate into high-purity
manganese sulphate (HPMSM) and downstream battery materials, including CAM, is
advancing rapidly through 2026. It builds on Firebird's operating pilot facility, which has
demonstrated the full flowsheet from manganese ore to high performance CAM, and
will validate the process under Australian conditions while delivering HPMSM and
cathode samples for customer qualification.
Firebird is advancing near-term HPMSM production for the lithium manganese iron
phosphate (LMFP) market, alongside a lithium manganese rich (LMR) program for next-
generation cathodes.
Firebird also holds 234 Mt of manganese resources in Western Australia, led by Oakover
(176.7 Mt at 9.9% Mn, including Indicated 105.8 Mt at 10.1% Mn1
) and Hill 616 (57.5 Mt
at 12.2% Mn2
). The Company has the flexibility to source manganese ore through
third‑party suppliers and stockpiles, with mining optionality retained within its broader
portfolio.
JORC Compliance Statement
This announcement contains references to Mineral Resource Estimates, which have
been reported in compliance with Listing Rule 5.8 and extracted from previous ASX
announcements as referenced. The Company confirms that it is not aware of any new
information or data that materially affects the information previously reported and that
all material assumptions and technical parameters underpinning the Mineral Resource
Estimates continue to apply and have not materially changed.
1
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource of 176.7 Mt
at 9.9% Mn.
2
See ASX announcement dated 1 December 2021: Inferred Resource of 57.5 Mt at 12.2% Mn.
Share your feedback
Discover