Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 April 2025
MARCH 2025 QUARTERLY ACTIVITIES REPORT
HIGHLIGHTS
CHINESE LMFP BATTERY STRATEGY
•
Firebird finalised four non-binding offtake MoUs with tier-one, China-based battery
cathode manufacturers for supply of manganese sulphate (MnSO4) and manganese
tetra-oxide (Mn3O4) from its proposed battery-grade plant, following successful
distribution and analysis of pilot plant samples
•
The Company engaged Sedgman Pty Ltd, a CIMIC Group Company, to drive the
technical marketing of the Company’s innovative calcining kiln in Australia and
internationally
•
Firebird signed a non-binding MoU with mining and metallurgy leader Eramet for
the supply of manganese ore for Stage One of operations at Firebird’s proposed
plant in China
o
•
Agreement followed successful testing of a 200kg sample of Eramet ore,
which was used to produce battery-grade MnSO4 and Mn3O4 at the
Company’s R&D centre in Jinshi
Firebird processed five manganese sulphate batches into LMFP CAM, producing
button batteries for performance testing
o
o
In collaboration with CSU, the Company plans to test 100 batches, advancing
to larger-scale pouch testing upon successful results
Test work expected completion by June 2025
•
Firebird’s proposed Battery Grade Manganese Sulphate Plant has been recognised
as a ‘Key Construction Project’ by the Hunan Government and local Jinshi
Government
•
Demonstrating the innovative approach of Firebird, its sector-leading team and the
quality of the project, the Company’s in-country subsidiary, Hunan Firebird Battery
Technology, has been awarded:
o
o
“Industry-Academia-Research Cooperation Support Award"; and
"Technology-Based Small and Medium-Sized Enterprise Award”
OAKOVER PROJECT
•
Firebird was granted Mining Lease ML 52/1086 for the Company’s 100% owned
Oakover Manganese Project, located 85km east of Newman in Western Australia.
CORPORATE
•
Cash position at 31 March 2025 of $2.35M
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Firebird Metals Limited (ASX: FRB, “Firebird” or “the Company”) is pleased to provide an
update on its activities during the March 2025 Quarter (“the Quarter”).
CHINESE LMFP BATTERY STRATEGY
PRODUCTION OF LMFP BATTERIES
In October 2024, Firebird entered into a binding strategic collaboration agreement with Central
South University (“CSU”) to develop innovative processing methods to produce lithium manganese
iron phosphate (“LMFP”) as cathode active material (“CAM”).1
Pursuant to this agreement, Firebird and CSU commenced testing of a combination of solid and
co-precipitation methods for the production of LMFP.
In early March 2025, Firebird announced that 5 batches from manganese sulphate in solution were
processed into LMFP CAM. The produced CAM was subsequently utilised to produce LMFP button
batteries for analysis and testing to evaluate performance, charge/discharge cycles, and
degradation.2
Upon successful completion of these tests, the Company will proceed to larger-scale pouch testing.
Firebird plans to complete 100 batches total alongside CSU by June 2025, turning each batch into
button batteries for analysis aligned with battery industry standards. Insights from this testing will
allow the Company and CSU to optimise battery performance.
Firebird is the first Australian company to produce LMFP batteries. The first production of
LMFP batteries is a transformative step forward for Firebird in the overarching commercialisation
of the Company’s LMFP cathode materials, with the primary objective of distributing a costefficient, high-quality product directly into global battery markets.
Image 1 and 2: Firebird LMFP Button Battery
See FRB ASX announcement 28 October 2024: Exclusive Collaboration Secured with Professor Ou & Professor Ming from Central South University to
Develop LMFP Cathode Material
1
2
See FRB ASX announcement 4 March 2025: Firebird Produces LMFP Batteries
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Cost and Production Advantages
In LMFP cathode production, producers typically purchase crystallised MnSO4 and then dissolve it
back into solution for further processing, which uses a significant amount of energy. Firebird’s
process eliminates packaging and crystallisation steps, giving the Company a critical cost
advantage in LMFP CAM production.
Eliminating packaging and crystallisation steps equates to a ~32% or US$167/t saving in projected
manganese sulphate operating costs3. In addition, the Company expects that reduced grinding at
a pCAM level will return further total cost savings.
Figure 1: Cost savings in LMFP Production
Image 3: Aerial View of Proposed Plant
3
See FRB ASX announcement 7 May 2024 for full details regarding proposed operating cost. Stated savings are calculated costs for each removed
stage of process by using LMFP process.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
FIREBIRD’S BATTERY GRADE MANGANESE SULPHATE PLANT
Firebird’s proposed manganese plant, located in the premier Jinshi High-Tech Industrial Park, is
the cornerstone of the Company’s strategy to become a leading low-cost producer of batterygrade cathode raw materials.
All critical permits for the plant have been obtained in less than a year by the Company’s in-country
subsidiary, Hunan Firebird Battery Technology (“HFBT”), and from the completion of a Financial
Investment Decision, the plant is expected to be built in less than 12 months – underscoring the
efficiency and competitive advantage provided by establishing operations in China. As outlined in
the project Feasibility Study (refer to FRB Announcement 7 May 2024), the plant boasts a very low
CAPEX of US$83.5 million.
Firebird’s proposed plant will have a production capacity of 50kt MnSO 4 plus 10kt Mn3O4, (72.5Kt
MnSO4 equivalent), with low capital intensity and operational costs drawn from the Company’s
innovative processing methods. Approximately 60% of the required financing has been secured
through indicative and non-binding agreements with key partners, including China Chemical and
China Construction Bank.
Provincial Government Support and Awards
Firebird’s Battery Grade Manganese Sulphate Plant has been officially designated as a Key
Construction Project by both the Hunan Provincial Government and the Jinshi Municipal
Government. This endorsement underscores the strategic importance of Firebird’s development
and affirms the Company’s differentiated approach to establishing a near-term, low-cost producer
of manganese-based cathode materials for the fast-growing electric vehicle (“EV”) market.
As a Key Construction Project, the plant is entitled to a range of preferential policies and
government support, including:
•
Priority access to government subsidies and grant programs;
•
Expedited financial services and support from banks; and
•
Dedicated assistance from government project development departments.
This recognition highlights Firebird’s innovative strategy, the strength of its technical and
management teams, and the overall quality of the project. In further acknowledgment of its
leadership in the sector, Firebird received two prestigious awards at the Jinshi Municipal Economic
Work Conference in February 2025:
•
Industry-Academia-Research Cooperation Support Award; and
•
Technology-Based Small and Medium-Sized Enterprise Award
These awards, combined with the Key Construction Project status, will assist Firebird’s
development trajectory and reflect the Company’s strong, collaborative relationships with key
stakeholders and local government bodies at the project site.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
OFFTAKE FOR STAGE ONE OF OPERATIONS IN CHINA
Firebird finalised four non-binding offtake Memorandums of Understanding (“MoUs”) during the
quarter for the supply of manganese sulphate and manganese tetra-oxide from the Company’s
proposed battery grade manganese sulphate plant.4
The MoUs were finalised following successful distribution and analysis of MnSO 4 and Mn3O4
samples produced from the Company’s pilot plant to several customers.
The MoUs were made with tier-one, China-based battery cathode manufacturers.
Stage One of operations boasts a potential production capacity of 50kt MnSO 4 and 10kt Mn3O4
(72.5Kt MnSO4 equivalent)5 and the MoUs represent:
•
•
Up to 70% of potential Stage One MnSO4 production; and
Up to 100% of potential Stage One Mn3O4 production
These agreements highlight the demand and critical need within China for a near-term, reliable
and high-quality source of MnSO4 and Mn3O4, feeding into the lithium manganese iron phosphate
(“LMFP”) market which is forecasted for exponential growth up to >US$20 billion by 2030.6
The agreements also highlight the competitive advantage of Firebird’s operations in this rapid
growth market – validating the exceptional quality and attractive cost profile afforded by the
Company’s commitment to innovation and efficiency. The agreements also validate the Company’s
vision for establishing R&D operations and its proposed plant in China, on the doorstep of the EV
and battery market.
Table 1: MOU Offtake Agreements Summary
Buyer
Purchases
Qty per annum (tonnes)
Producers
Zhejiang Haichuang Lithium Battery
MnSO4
Up to 12,000
NCM Cathodes
Jinchi Energy Materials Co., Ltd.
MnSO4
Up to 5,000
NCM Cathodes
Shaanxi Ziyang Xianggui Manganese Industry
MnSO4
Up to 8,000
Mn3O4
Sichuan Changhong New Energy Technology
MnSO4 and
Up to 10,000 each
LMO Cathodes
Co., Ltd
Mn3O4
Technology Co., Ltd.
Co., Ltd.
4
5
6
See FRB ASX announcement 20 February 2025: Firebird Secures Multiple Offtake MOUs for Stage One of Operations
Refer to ASX announcement 7 May 2024 for full details
Soochow Securities report dated 16 August 2023
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
STRATEGIC ENGAGEMENT OF SEDGMAN FOR KILN COMMERCIALISATION
Firebird engaged Sedgman Pty Ltd, a CIMIC Group Company, to drive the technical marketing of
the Company’s innovative calcining kiln in Australia and internationally.7
Sedgman has over four decades of experience in minerals and metals project development, and
novel process technology adoption. Sedman is an industry leader in pioneering the use of new
technologies to improve the efficiency of processing plants, with experience spanning major
markets around the world. Sedgman, like Firebird, is committed to advancing methods, materials
and technologies that generate value and improve the efficiency of the industry and are a highquality partner to help advance the commercialisation of the Company’s kiln.
Engaging Sedgman was a key step in the Company’s overall aim to commercialise its kiln
technology – whilst capitalising on the opportunity to utilise innovation from its Chinese technical
team, like the calcining kiln, to improve cost efficiency within its own processes.
Image 4: Pilot Calcining Kiln
Firebird’s Energy Efficient Calcining Kiln
Firebird’s calcining kiln, currently under patent application, provides significantly greater energy
efficiency than existing alternatives. Firebird has successfully completed trials of the pilot scale
calcining kiln, with remarkable results generated – indicating that the calcining kiln has the
potential to reduce energy usage by 70%.8
7
See FRB ASX announcement 24 February 2025: Strategic Engagement of Sedgman for Commercialisation of Groundbreaking Calcining Kiln
8
See FRB ASX announcement dated 21 October 2024: FRB Successfully Test Energy Efficient Rotary Kiln – 70% Reduction in Energy Consumption
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Compared to conventional kilns, which typically require more than 300kWh per tonne of feed,
FRB’s pilot kiln operates at only 80-100kWh per tonne – translating to a significant cost reduction
of USD30 per tonne of product, or approximately 5% of total production costs.
The calcining kiln technology is highly scalable, and in addition to applications in manganeserelated mineral processing, will also be assessed for use across industries such as iron ore
beneficiation and lithium sulphate production.
SIGNED NON-BINDING MOU WITH ERAMET FOR MANGANESE ORE
Firebird signed a non-binding MoU with mining and metallurgy leader Eramet for the supply of
manganese ore for Stage One of operations at Firebird’s proposed plant in China.
Eramet is a French multinational mining and metallurgy company listed on the Euronext Paris
exchange. Through its subsidiary Comilog, Eramet operates the Moanda mines in Gabon,
recognised as the world’s largest manganese mining operation. Since commencing operations in
1962, the Moanda mines have been a cornerstone of global manganese production, extracting 7.4
million tonnes of ore in 2023, with 6.6 million tonnes successfully transported.
The agreement followed successful testing of a 200kg sample of Eramet ore, which was used to
produce battery-grade MnSO4 (high-purity manganese sulphate monohydrate) and manganese
tetra oxide (Mn3O4) at the Company’s R&D centre in Jinshi. The MoU established a collaborative
framework aimed at securing the regular purchase and supply of manganese ore, to align with
Firebird’s operational requirements for Stage One at the proposed plant. Stage One of operations
aims to produce 50,000tpa of battery grade MnSO4 and 10,000tpa Mn3O4 utilising third party ore9.
Signing of the MoU marks a pivotal step in accelerating the Company’s journey towards
production, contributing to building a strong foundation for confident cash flow generation at the
proposed plant. The Company’s long-term strategy remains focused on utilising ore from the
Oakover Manganese Project once in operation for Stage Two expansions of its proposed plant.
Key Details of Eramet MoU
The agreement specifies an annual supply of 80,000 tonnes, with 20,000 tonnes to be delivered
quarterly. The agreed annual supply volume exceeds the 66,000 tonnes per annum identified in
Firebird’s Feasibility Study; the additional tonnage serves as a strategic buffer, mitigating potential
disruptions across the logistics chain.
The MoU reflects share intent from Firebird and Eramet to progress into a long-term supply
agreement. This transition is dependent upon Firebird achieving key milestones including securing
project financing, the commencement of construction of the plant, and initiating ore requirements
for production.
Terms relating to pricing and payment mechanisms are commercially sensitive and confidential.
9
Refer to FRB ASX announcement dated 7 May 2024 for full details
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
OAKOVER PROJECT
OAKOVER MINING LEASE GRANTED
Firebird was granted Mining Lease ML 52/1086 for the Company’s 100% owned Oakover
Manganese Project, located 85km east of Newman in Western Australia.10
The Oakover Mining Lease covers a large area of 3,429.8 ha, including the Sixty Sixer, Jay Eye and
Karen Pits, as well as proposed processing plant, tailings storage and waste dump.
The granting of Mining Lease 52/1086 is a significant milestone for Firebird at the Oakover Project,
bringing the Company closer to the goal of vertically integrating Oakover with its downstream
processing strategy.
Receipt of the Mining Lease is conditional on the Company’s development of a mining proposal,
requiring approval from the Department of Energy, Mines, Industry Regulation and Safety
(“DEMIRS”). The Company is progressing environmental surveys and mining studies to support the
mining proposal.
Figure 2: Oakover Project Location and Area
10
See FRB ASX announcement dated 18 March 2025: Firebird Granted Mining Lease for Oakover Manganese Project
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Oakover Project
Oakover is a large, near-surface project which boasts a Mineral Resource Estimate11 of 176.7 Mt at
9.9% Mn including an Indicated Resource of 105.8 Mt at 10.1% Mn.
The Oakover project forms part of Firebird’s long-term vertical integration strategy. The successful
development of the project will ultimately provide Firebird with a 100% owned and secure
feedstock supply for its manganese sulphate processing, reinforcing its unique and competitive
position in the market as a low-cost, manganese-based cathode materials business.
CORPORATE
FINANCIAL OVERVIEW
The Appendix 5B for the quarter ended 31 March 2025 provides an overview of the Company’s
financial activities.
Exploration expenditure for the Quarter was $167,000 and primarily related to environmental
work and consulting fees.
Expenditure related to the development of the Chinese manganese sulphate plant and Mn3O4
plant was $224,000.
The total amount paid to Directors of the Company, their associated and other related parties was
$241,000 comprising salary and Directors’ fees.
Cash and cash equivalents at Quarter end were $2.35M.
This announcement has been approved for release by the Board.
For further information contact:
Mr Peter Allen
Managing Director
+61 8 6245 9818
admin@firebirdmetals.com.au
11
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource of 176.7
Mt at 9.9% Mn.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
About Firebird Metals Limited
Firebird Metals is an advanced manganese developer focused on combining mining and
downstream processing with a dedication to the advancement of the EV battery sector.
The Company is currently progressing its unique China-focused lithium manganese iron
phosphate (“LMFP”) battery strategy, which will develop Firebird into a near-term producer of highpurity, battery-grade manganese sulphate, a key cathode material in LMFP batteries for electric
vehicles.
Execution of this strategy will place Firebird at the forefront of manganese sulphate production,
at a time when the use and demand for manganese in batteries continues to rapidly grow. Due to
the low number of ASX-manganese developers and increasing use of LMFP by car manufacturers,
Firebird considers that it is in a strong position to benefit from this growing market and deliver
significant value to its shareholder base.
The Company also owns 100% of its project portfolio, located in the renowned East Pilbara
manganese province of Western Australia, which boasts a total Resource of 234Mt 12,13, with
exciting exploration and development growth upside. The portfolio is led by the flagship Oakover
Project, which holds a Mineral Resource Estimate of 176.7 Mt at 9.9% Mn, with 105.8 Mt at 10.1%
Mn in an Indicated category.
The Company is committed to generating sustainable long-term value and growth for
stakeholders, through the implementation of best practice exploration methods while prioritising
the well-being, health and environmental protection of its employees and communities it operates
in.
JORC Compliance Statement
This announcement contains references to Mineral Resource Estimates, which have been reported
in compliance with Listing Rule 5.8 and extracted from previous ASX announcements as
referenced. The Company confirms that it is not aware of any new information or data that
materially affects the information previously reported and that all material assumptions and
technical parameters underpinning the Mineral Resource Estimates continue to apply and have
not materially changed.
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource of 176.7
Mt at 9.9% Mn.
12
13
See ASX announcement dated 1 December 2021: Inferred Resource of 57.5 Mt at 12.2% Mn.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Forward-looking statements
This announcement may contain certain “forward-looking statements”. Forward looking
statements can generally be identified by the use of forward-looking words such as, “expect”,
“should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” and other
similar expressions. Indications of, and guidance on, future earnings and financial position and
performance are also forward-looking statements. Forward-looking statements, opinions and
estimates provided in this presentation are based on assumptions and contingencies which are
subject to change without notice, as are statements about market and industry trends, which are
based on interpretations of current market conditions. Forward-looking statements including
projections, guidance on future earnings and estimates are provided as a general guide only and
should not be relied upon as an indication or guarantee of future performance.
Additional Listing Rule Information
The Company advises the following information in accordance with Listing Rule 5.3.3 as at 31
March 2025:
Western Australian
Project
Tenement
Ownership at the
Start of quarter
Ownership at end of
Quarter
Oakover
Oakover
Oakover
Oakover
Hill 616
Disraeli
E 52/3577
E 46/1392
E 52/3948
E 46/1570
E 52/3633
E 46/1389
100%
100%
100%
100%
100%
20%
100%
100%
100%
100%
100%
20%
Wandanya
Wandanya
E 46/1456
E 46/1457
20%
20%
20%
20%
The Company confirms that there no acquisitions or divestments of tenement interests during the
quarter.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Firebird Metals Limited
ABN
Quarter ended (“current quarter”)
24 610 035 535
31 March 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(9 months)
$A’000
(67)
(226)
(b) development
-
-
(c) production
-
-
(d) staff costs
(241)
(670)
(e) administration and corporate costs
(260)
(740)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST refunds)
166
284
1.9
Net cash from / (used in) operating
activities
(402)
(1,352)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
(47)
(47)
(d) exploration & evaluation
(100)
(280)
(e) investments – MnSO4+Mn3O4 plant
China
(224)
(1,085)
-
-
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(371)
(1,412)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
45
45
3.6
Repayment of borrowings
(1)
(1)
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
44
44
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,076
5,067
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(402)
(1,352)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(371)
(1,412)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
44
44
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
2,347
2,347
Current quarter
$A’000
Previous quarter
$A’000
2,347
3,076
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,347
3,076
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
213
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A’000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
n/a
n/a
7.2
Credit standby arrangements
n/a
n/a
7.3
Other (please specify)
n/a
n/a
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
n/a
n/a
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(402)
8.2
Payments for exploration & evaluation classified as investing
activities (item 2.1)
(371)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(773)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,347
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2,347
3.04
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: n/a
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: n/a
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: n/a
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 April 2025
Authorised by: The Board of Firebird Metals Limited
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encour
Share your feedback
Discover