Firebird Metals Investor Presentation
Released
Released
Announcement PDF
EXECUTING A CHINA-BASED, BATTERY GRADE HIGHPURITY MANGANESE PRODUCTION STRATEGY
AUGUST 2024
ASX: FRB
DISCLAIMER
CAUTIONARY STATEMENT – SULPHATE FEASIBILITY STUDY
This presentation contains summary information about Firebird Metals Limited (Firebird) (ABN 24 610 035
535) and is current as of 2 August 2024. The information in this presentation is of a general background and
does not purport to be complete. This presentation is not investment or financial product advice (nor tax,
accounting or legal advice) and is not intended to be used for the basis of making an investment decision.
The Feasibility Study referred to in this presentation is a Technical Feasibility of the establishment of the Battery Grade Manganese
Sulphate Project Stage 1 Processing Plant in China (the Plant). The Feasibility Study is based on the material assumptions contained in the
Feasibility Study document released to the ASX on 7 May 2024. These include assumptions about the availability of funding. While the
Company considers all of the material assumptions to be based on reasonable grounds, there is no certainty that they will prove to be
correct or that the range of outcomes indicated by the Feasibility Study will be achieved.
The information contained in this presentation has been prepared without taking into account the objectives,
financial situation or needs of individuals. Investors should obtain their own advice before making any
investment decision. Firebird has prepared this document based on information available to it at the time of
preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or
completeness of the information, opinions and conclusions contained in this presentation.
This presentation contains certain “forward-looking statements”. Forward looking statements can generally be
identified by the use of forward-looking words such as, “expect”, “should”, “could”, “may”, “predict”, “plan”,
“will”, “believe”, “forecast”, “estimate”, “target” and other similar expressions. Indications of, and guidance on,
future earnings and financial position and performance are also forward-looking statements. Forward- looking
statements, opinions and estimates provided in this presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry
trends, which are based on interpretations of current market conditions. Forward-looking statements
including projections, guidance on future earnings and estimates are provided as a general guide only and
should not be relied upon as an indication or guarantee of future performance
This presentation contains statements that are subject to risk factors associated with Firebird and the mining
exploration industry. It is believed that the expectations reflected in these statements are reasonable, but they
may be affected by a range of variables which could cause actual results or trends to differ materially. Firebird
disclaim any intent or obligation to publicly update any forward-looking statements, whether as a result of
new information, future events or results or otherwise. To the maximum extent permitted by law, Firebird,
their related bodies corporate (as that term is defined in the Corporations Act 2001 (Cth) and the officers,
directors, employees, advisers and agents of those entities do not accept any responsibility or liability
including, without limitation, any liability arising from fault or negligence on the part of any person, for any
loss arising from the use of the presentation or its contents or otherwise arising in connection with it.
JORC Compliance Statement
This announcement contains references to Exploration Results and Mineral Resource Estimates, which have
been reported in compliance with ASX Listing Rules 5.7 and 5.8 and extracted from previous ASX
announcements as referenced. The Company confirms that it is not aware of any new information or data
that materially affects the information included in the said announcements, and in the case of estimates of
Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcements continue to apply and have not materially changed.
The Company confirms that the material assumptions and technical parameters underpinning the production
target disclosed in the Company's announcement dated 7 May 2024 continue to apply and have not materially
changed.
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23, 30/8/23, 1/9/23,
18/10/23, 21/11/23, 13/12/23, 29/1/24, 13/3/24, 7/5/24, 14/5/24, 28/5/24 and 5/6/24.
Oakover Resource: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for
global Resource of 176.7 Mt at 9.9% Mn
Hill 616 Resource: Inferred Resource of 57.5 Mt at 12.2% Mn
Notwithstanding the developments set out in this quarterly report, Investors should note that there is no certainty that the Company will
be able to raise the amount of funding to develop the Plant when needed. It is also possible that such funding may only be available on
terms that may be dilutive to or otherwise affect the value of Company’s existing shares.
It is also possible that the Company could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the
Plant. If it does, this could materially reduce the Company’s proportionate ownership of the Plant. Given the uncertainties involved,
investors should not make any investment decisions based solely on the results of the Feasibility Study.
CAUTIONARY STATEMENT- DMS CONCENTRATE SCOPING STUDY
The Updated Scoping Study announced to the ASX on 30 August 2023 has been undertaken for the purpose of initial evaluation of a
potential development of the Oakover Manganese Project. The Scoping Study is a preliminary technical and economic study of the
potential viability of the Oakover Manganese Project as a manganese producer. The Scoping Study outcomes, production target and
forecast financial information referred to in this release are based on low accuracy level technical and economic assessments that are
insufficient to support estimation of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/- 35% in line with a scoping level study accuracy. While each of the JORC
modifying factors was considered and applied, there is no certainty of eventual conversion to Ore Reserves or that the production target
itself will be realised. Further exploration and evaluation work and appropriate studies are required before the Company will be in a
position to estimate any Ore Reserves or to provide any assurance of an economic development case. Accordingly, given the uncertainties
involved, investors should not make any investment decisions based solely on the results of the Scoping Study. Given that the results of
the Scoping Study are subject to the qualifications above (including assumptions as to accuracy), any results reported in this release
should be considered as approximates and subject to variances having regard for the assumptions referred to in this release. The
Company has reasonable grounds for disclosing a Production Target, given that approximately 99% of the Life-of-Mine (LOM) Production
Target is in the Indicated Mineral Resource category, and 1% is in the Inferred Mineral Resource category. The production target stated in
this announcement is based on Firebird’s current expectations of future results or events and should not be relied upon by investors
when making investment decisions. Further evaluation work and studies are required to establish sufficient confidence that the
production target will be met. Firebird confirms that the financial viability of the Oakover Manganese Project is not dependent on the
inclusion of Inferred Resources in the Scoping Study.
The Company considers all the material assumptions in this Study to be based on reasonable grounds. These include assumptions about
the availability of funding. While Firebird considers all of the material assumptions to be based on reasonable grounds, there is no
certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping Study will be achieved. To achieve the
range of potential outcomes indicated in the Scoping Study, funding of in the order of $123 million (excluding working capital and finance
costs) will likely be required. Investors should note that there is no certainty that Firebird will be able to raise that amount of funding
when needed. However, the Company has concluded it has a reasonable basis for providing the forward-looking statements included in
this announcement and believes that it has a "reasonable basis" to expect it will be able to fund the development of the Project. It is also
possible that such funding may only be available on terms that may be dilutive to or otherwise affect the value of Firebird’s existing
shares. It is also possible that Firebird could pursue other ‘value realisation’ strategies such as a sale, partial sale or joint venture of the
project. If it does, this could materially reduce Firebird’s proportionate ownership of the project. Given the uncertainties involved,
investors should not make any investment decisions based solely on the results of the Scoping Study.
The Mineral Resources underpinning the production target in the Scoping Study have been prepared by a competent person in
accordance with the requirements of the JORC Code (2012). For full details of the Mineral Resources estimate, please refer to Firebird’s
ASX release dated 23 March 2023. Firebird has confirmed that it is not aware of any new information or data that materially affects the
information included in that release. All material assumptions and technical parameters underpinning the estimates in that ASX release
2
continue to apply and have not materially changed.
BUILDING A LOW-COST, HIGH-PURITY MANGANESE
SULPHATE PLANT
Unique, Low-Cost,
Speed-to-Market
Strategy
Sustainable Economics
and Perfect Timing
Successfully executing a high-purity, battery grade manganese sulphate strategy to supply into the
rapidly expanding LMFP battery market
Due to low-cost MnSO4 production profile, the Company will be in a competitive position across all
market environments, at a time when the LMFP market is forecasted for exponential growth
Stage two of operations to be supplied by flagship Oakover Project (Western Australia)
Industry Leading
Management, Board and
In-Country Team
Well-Funded and
Supported
Led by a Board and Management team with decades of manganese experience and proven abilities of
building companies through the lifecycle and into production
Assembled a proven and high-quality team in China, who are leaders in the development and
production of high-purity manganese
Strong cash position of $5.1m (30 June 2024) to fund key workstreams across China strategy and at
Oakover
Firebird has attracted a strong investor register supported by highly-reputable investor Canmax
Technologies Co., Ltd who has a 9.7% holding in the Company
3
DELIVERING ON THE FIREBIRD VISION
COMPANY VISION
Become a global leader in the manganese industry by seamlessly combining mining and downstream processing, with a profound
dedication to the advancement of Li-ion & Na-ion battery sectors.
By harnessing the power of innovation and sustainability, Firebird aims to play a pivotal role in shaping the future of energy
storage solutions and significantly contributing to a more sustainable and electrified world.
BATTERY MINERALS
MINING
Stage 1 – China
50,000tpa Battery Grade MnSO4 and 10,000tpa Mn3O4
using 3rd party ore
Stage 2 - China
300,000tpa equivalent Battery
Grade MnSO4 – Using Oakover
ore
Stage 2 - Western Production
100,000tpa equivalent Battery
Grade MnSO4 - using Oakover ore
Oakover
Manganese
Concentrate
18-year Life of
Mine
Assess and execute
on other battery
grade project
development
opportunities
Continue to
increase
manganese
Resource base
Cathode Producer
GLOBAL CATHODE PRODUCER
4
INDUSTRY LEADING MANGANESE TEAM
• Board brings impressive credentials, leveraging previous successes moving
companies through development into operations
• Firebird boasts extensive manganese experience:
• Peter Allen (Managing Director) has more than 20 years' experience in
the marketing and development of manganese projects
• Wei Li (Finance Director and Managing Director of China Subsidiary) has
extensive manganese battery experience and assisted in
commissioning an A$150 million Electrolytic Manganese Dioxide
(EMD) plant in Hunan China
• In China, HFBT has recruited two key highly-experienced technical
professionals:
• Mr Zhou 20 years’ experience in battery grade MnSO4 production. Mr
Zhou was a part-owner of a battery grade MnSO4 plant, consulted to
many existing MnSO4 plants in China and involved in development,
optimisation and commercialisation of technologies for MnSO4
processing (including patents)
• Mr Tang has significant experience in the design, engineering and
operation of MVR and sulphate production
• Included amongst more than a dozen patents are the two significant energy
savings patents of:
• 5th Gen Crystallisation Reactor
• Energy Efficient Multi-purpose Rotary Kiln
BOARD
EVAN CRANSTON
Non-Executive Chairperson
PETER ALLEN
Managing Director
WEI LI
Finance Director
ASHLEY PATTISON
Non-Executive
Director
BRETT GROSVENOR
Non-Executive
Director
CHINA
HUNAN FIREBIRD BATTERY TECHNOLOGY (HFBT)
WEI LI
Managing Director
MR ZHOU
Chief Operating Officer
MR TANG
Operations Manager
5
LMFP STRATEGY – FAST EXECUTION
Looking ahead
Completed
September 2023
Release of ChinaBased HighPurity
Manganese
Sulphate Battery
Strategy
November 2023
Establishment of
a World-Class
Technical Team
October 2023
Strategic
Cornerstone
Investment by
Canmax
Technologies
January 2024
Commencement
of Pilot Plant
Operations
December 2023
Location For
Battery Grade
Manganese
Sulphate Plant
Secured
April and May
2024
Investor Site
Visits
March 2024
Strategic
Partnerships
Established with
China Chemical
and Hunan
Chemical
Engineering
Design Institute
May 2024
Financing
Agreement for
60% or Required
CAPEX with
China
Construction
Bank
May 2024
Completion of
Highly Successful
Feasibility Study
June 2024
Progressing
Critical Permits &
Sunward
Agreement
Mid-Q3 2024
Preliminary
Engineering
Design
August 2024
FirebirdSunward Kiln
Testing
Ongoing
Customer
Engagement
Late H2 2025
Commencement
of Operations
Late H2 2024
Final Investment
Decision
Ongoing
Government Support: Jinshi Government continues to actively assist Firebird in the permitting process, offering substantial financial incentives, including a 62.5% land rebate in
cash within 60 business days and six years of tax incentives from commercial production.
6
STAGE 1 CHINA-BASED FEASIBILITY STUDY AND FINANCING
• Feasibility Study confirmed unique opportunity to establish a nearterm, highly competitive-cost, battery grade manganese sulphate
operation.
•
Projected CAPEX of US$83.5M, working capital US$10.7M
•
Plant Capacity: Battery Grade MnSO4 50kt/a & Mn3O4 10kt/a or equivalent
MnSO4 of 72.5kt/a
•
Environmentally friendly process with no wastewater and all residues
consumed by cement plant
• Significant cost, development and operational advantages through
establishing operations in China
• FINANCING - Combined indicative and non-binding agreements for
~60% of the financing requirements for low-cost CAPEX of US$83.5M:
•
Non-binding indicative offer from China Construction Bank to provide
50% of plant CAPEX requirements (subject to conditions precedents),
at very attractive terms plus 70% of required working capital
•
Non-binding agreement with China Chemical to provide up to 20%
of construction and installation costs on a deferred payment basis,
interest-free and repayable 12 months after the commencement of
commercial production
•
Binding Agreement with Jinshi local Government to receive a 62.5%
rebate (totalling ~US$4.2 million) on the ~US$6.8 million land purchase
For full details refer to ASX announcements dated 7/5/24 and 14/5/24
7
RAPID DEVELOPMENT PROGRESS
BEING MADE ON-THE-GROUND IN
CHINA
•
Preliminary design work, R&D centre,
equipment supplier due diligence & project
permitting all being progressed at full speed
•
Estimated permitting & design on track for
completion by late Q3 2024
•
European customer and investor site visits
•
Formal advice from Jinshi Government &
relevant departments confirming the process
to repatriate profits and capital from
operations in China - Firebird successfully
repatriated capital funds to Australia from
China in early June
•
As further proof of the strong levels of
support in China, Firebird will receive a
preferential tax rebate for 6 years
For full details of timeline refer to ASX announcement dated 7/5/24
8
GROWING IMPORTANCE AND NEED FOR MANGANESE IN BATTERIES
CRITICAL ROLE OF MANGANESE IN BATTERIES
Traditional
Uses
• Manganese has a long history of being a
cathode material for batteries in the form of
Electrolytic Manganese Dioxide (EMD)
• Current production market sizes are 482,000t
in China and 107,000t for rest of the world
Manganese content (kg) in per battery in each vehicle above
Source: Benchmark Mineral Intelligence
Manganese
Lithium-ion
Batteries
• Mn is used in Li-ion batteries, including NCM,
LMO and LMFP – due to significant benefits of
LMFP, the use of this cathode mix is set for
massive growth
• Size and growth of LMFP market is
potentially the largest in medium to long
term (est. avg. 900kg of MnSO4 per 1 tonne
of LMFP)
Indicative Metals Intensity By Battery Type
LFP
NCA
NCM 9½½
NCM 811
Mn
NCM 712
Ni
NCM 622
Na-ion
Batteries
• Na-ion batteries inherently have lower density
• Sodium batteries contain around 30% Mn
Research and advocates for manganese rich batteries is on
the rise, due to manganese being abundant and relatively
inexpensive compared with nickel and cobalt
Co
NCM 523
Li
NCM 307
Emerging
Manganese
rich
Battery
configurations
Fe
NCM 217
P
NCM 111
LMFP
LMO
0
0.2
0.4
0.6
Source: Benchmark Mineral Intelligence and company research
0.8
1
1.2
1.4
10
LMFP IS THE FUTURE CATHODE FOR EV BATTERIES
BYD's Chairman, Wang Chuanfu, emphasized the significance of their LMFP technology:
EV manufacturers using LFMP
"Our LMFP Blade Battery represents a significant leap forward in EV battery
technology. We believe it will set a new standard for safety, energy density, and costeffectiveness in the industry."
Dr. Zeng Yuqun, Chairman of CATL, highlighted the importance of LMFP in their strategy:
Battery manufacturers using LFMP
"LMFP technology is a key component of our next-generation battery solutions. It
allows us to offer our customers a compelling combination of performance, safety,
and cost, which is crucial for the mass adoption of EVs."
Li Zhen, Chairman of Gotion High-Tech, commented on their LMFP strategy:
"We see LMFP as a game-changer in the EV battery market. Our investments in this
technology, both in China and internationally, reflect our confidence in its potential
to meet the evolving needs of automakers and consumers."
Cathode material manufacturers using LMFP
Yang Hongxin, President of SVOLT, stated in a press release:
"Our LMFP technology represents a significant step towards more sustainable and
high-performance batteries. We believe it will play a crucial role in the next
generation of EVs, offering an excellent balance of cost, performance, and
environmental considerations.“
Source: Giga-MANGANESE – The AWAKENING newsletter
力泰锂
能
11
LMFP IS THE FUTURE CATHODE FOR EV BATTERIES
• Lithium Iron Phosphate (LFP) is the world’s most used Li-ion cathode material
for EV batteries
• Three critical key considerations for battery manufacturers when assessing and
developing a cathode mix is safety, cost and capacity
• Adding high purity manganese sulphate (MnSO4) to LFP, creates LMFP and
delivers significant operational and safety benefits to a battery
• LMFP is an upgrade from LFP by introducing manganese to replace iron
•
LMFP has a higher thermal run-away temperature than nickel-based batteries
•
LMFP costs approximately 30% of nickel-based batteries
•
Enhances the voltage platform and increases energy density by 15-20%
•
LMFP is flexible, used on its own or mixed with nickel-based batteries
• Soochow Securities forecast LMFP will replace 50% of LFP batteries by 2030
• Caitong Securities forecast blending LMFP with nickel-based batteries in
China to reach 30% by 2030
• Firebird is executing its LFMP battery strategy at the perfect time and will
be well-positioned to supply into this rapidly growing market
12
CHINA OPERATIONS
INDUSTRY LEADING MANGANESE PARTNERS
• Firebird’s partners are leaders within their industries
• Strategic Cooperation Agreement with China Chemical will deliver Firebird
a significant amount synergies and advantages:
•
China Chemical invested in and manages the Jinshi High-Tech Chemical
Industrial Park, where the Company’s plant and operations will be located
•
China Chemical has significant technical expertise and proven credentials in
construction of chemical plants
•
China Chemical has the highest qualification for installation of chemical
equipment
• A dedicated technical team will be formed with China Chemical, once
preliminary design work is completed
• Hunan Chemical Engineering Design Institute (HCEDI) engaged to complete the
Feasibility Study & Engineering Design
• HCEDI is the leading MnSO4 project design institute globally and Firebird’s
in-country technical team have previously worked closely with HCEDI on
several projects
For full details refer to ASX announcements 13/3/24
14
OPERATIONS LOCATED IN THE EPICENTRE OF
CHINESE MnSO4 DEMAND
•
Plant to be located in the world-class Jinshi High-Tech Industrial Park, Hunan Province, China
•
Strategic location and within close proximity (150km radius) to existing and potential customers - LFP capacity is just under 3Mt/a
•
Even if a fraction of conversion from LFP to LMFP is actioned, it will significantly exceed Firebird’s production capacity
Source: Benchmark Minerals, Company Research
15
JINSHI HIGH-TECH
INDUSTRIAL PARK
• The Park is ranked as one of the highest in the
Hunan Province for its services and facilities
• The Park is conveniently located on Lishui River,
which connects onto the Yangtze River. The bulk
terminal has a capacity of over 10 Mt/annum
• Provides access to tier-one infrastructure such as
a steam plant, dual power lines, water treatment
plant, cement plant depot
• Attractive land price & tax incentive. Firebird has
received better incentives than any other
company in the Industrial Park and qualifies for all
Chinese domestic company grants
• Strong support from local governments on
foreign investment
• Currently over 100 companies operate in the Park.
Several new businesses have set up pilot plants
within the development area and Firebird currently
operates from the development area
16
RAPID DEVELOPMENT PROGRESS BEING DELIVERED IN CHINA
R&D LAB COMPLETE, PILOT PLANT TRIALS UNDERWAY
• Firebird completed construction of the Research and Development lab in January 2024, ahead of schedule and under budget
• Pilot Plant operational and producing samples of MnSO4 and Mn3O4 for potential customers and offtake parties
• Pilot Plant has design capacity to produce 10kg of battery-grade MnSO4 per day (can be increased to suit Company needs)
• The Pilot Plant will also be used to demonstrate the production process to financiers
• R&D lab will be used to complete testing on several other potential Mn rich precursor Cathode Active Materials (pCAM)
• Video of Firebird Lab
For full details refer to ASX announcement dated 29/1/24
18
HIGH-LEVEL PROCESS FLOW DIAGRAM 50KTPA HIGH PURITY MnSO4·H2O AND 10KTPA HIGH PURITY Mn3O4
• Firebird’s Chinese technical
team’s expertise reflected in low
capital intensity and low
operating cost process
• Reduction roasting, crystallisation
and drying & packing all have
patents
For full details refer to ASX announcement dated 7/5/24
19
5th GENERATION CONTINUOUS HIGH PRESSURE
CRYSTALLISATION REACTOR IS WORLD LEADING
1st
2nd
3rd
4th
1st generation Single effect evaporator
•Indirect heating to concentrate solution
2nd generation Multi-effect evaporator
•60% energy use of 1st generation
•Recycle residual heating to pre-heat incoming solution
3rd generation MVR
•40% energy use of 1st generation
•More efficient heating and recycle energy
4th generation Single High pressure, high temperature
reactor
•25% energy use of 1st generation
•Like a pressure cooker, efficiency improved due to high
pressure and temperature
5th generation (patent technology) Continuous highpressure system, 8% energy use of 1st generation
5th
•1/3 energy use of 4th generation
•Based on 4th generation system, it operates
continuously & residual energy is used in pre-heating
feed solutions
•
Most Chinese companies currently using 1st to 4th
generation
•
5th generation is successfully used in Commercial
Production
20
CALCINING UNIT – SUNWARD AGREEMENT
• Conventional calcining technology consumes minimum 300kwh per tonne of
feed, materials are heated to 900 degrees celsius and cooled down by using a
combination of water and air - energy is wasted during cooling
• Firebird’s technology (patent application lodged) utilises heat from
calcined material to pre-heat incoming material, reducing energy usage by
80%, further enhancing the cost-efficiency of the Company’s high-purity
manganese plant
• Development agreement signed with Zhongji Sunward Technology Co, Ltd
(“Sunward”), a leading producer of rotary tunnel kilns used in many
chemical plants across China
• Energy Saving rotary kiln technology can be applied in various industrial
applications
• Sunward agreed to pay Firebird a 5% royalty on future sales revenue and
the Company retains the right to collaborate with other manufacturers
• Sunward will fund 50% of the cost of a pilot plant which has a total cost
estimate of US$200,000 and is responsible for the detailed engineering design
and manufacturing of the pilot plant
• Pilot plant construction is expected to be completed in August and data
collected from testing will be used to inform the current project design
For full details refer to ASX announcement dated 5/6/24
Detailed 3D Design of Firebird’s Rotary Kiln
21
ENGINEERING & PERMITTING - PROGRESSING AS PLANNED
• Firebird currently focused on completing key preliminary
engineering & civil work design works
• More than 50% of preliminary design work completed
• Firebird has engaged several high-quality equipment suppliers
• Once completed, design work will be reviewed by relevant
department for preliminary permitting of construction process
• Remaining critical Environmental and Energy permits are in the
final stage of assessment
• Safety permit awarded in May which, along with
Environmental and Energy, is required for construction and
operation of the battery grade manganese sulphate plant
• Government permitting is progressing rapidly
For full details refer to ASX announcement dated 28/5/24
PERMIT
1 Project Initiation Permit by the
NDRC (National Development and
Reform Committee)
STATUS
Granted
2 Project Environmental Permit via the EIA report complete and has gone
Environmental Impact Assessment
(EIA) Document
through initial Expert Panel review;
Full approval expected iminently
3 Project Safety Permit
4 Project Energy Permit via Energy
Granted
Energy consumption complete, has
been lodged with Government and
expected to be approved in August
2024
5 Water and Soil Monitoring Permit
30% complete, awaiting detailed
design
6 Workplace Health and Safety Permit
30% complete, awaiting detailed
design
7 Social Stability Permit
8 Building and Construction Permit
Work commenced
Following preliminary design
Technology Evaluation Document
22
OAKOVER PROJECT
OAKOVER PROJECT
Over the medium to long term, Oakover will play an
integral role in the delivery of Firebird’s manganese
battery material strategy
PORT HEDLAND
Key Highlights
• Near-surface, gently dipping geology
• Metallurgical test work demonstrated saleable 30 - 32% Mn
concentrate product achievable
NEWMAN
• Hydrometallurgy test work demonstrated Battery Grade MnSO4
achievable
WESTERN
AUSTRALIA
• Concentrate DMS Scoping Study – 18-year mine life, 1.2Mtpa
with low strip ratio and mining costs
Mineral Resource
Classification
Tonnes (Mt)
Mn (%)
Fe (%)
SiO2 (%)
Al2O3 (%) P (%)
Indicated
105.78
10.1
8.9
39.2
9.8
0.10
Inferred
70.87
9.6
8.0
36.5
9.5
0.09
Total
176.65
9.9
8.6
38.1
9.7
0.10
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23 and 30/8/23
1
PERTH
24
LARGE RESOURCE WITH STRONG GROWTH UPSIDE
• Through the successful exploration and development, Firebird has grown Oakover
into a sizeable manganese project
• Updated DMS Manganese Concentrate Scoping Study generated strong
results and highlighted Oakover as a long-life, high-quality operation:
•
18-year Life of Mine
•
~A$741.3 M NPV at a discount rate of 8%
•
Impressive IRR of 73.1%
•
CAPEX of A$123M
•
Payback period of just 16 months
• Company’s primary focus is execution of the China-based battery grade
manganese strategy. However, development and environmental work will continue
over the next 18 months at Oakover, with key activities including:
•
Environmental surveys and studies
•
Diamond drill program for ongoing metallurgical test work
•
Pre-Feasibility Study metallurgical test work program
•
Hydrology/water monitoring
•
Finalisation of the Mining Lease Application, including native title and heritage
negotiations
Execution of these workstreams will see Firebird successfully deliver on its
vision to become a global leader in the manganese industry, combining mining
and do
Share your feedback
Discover