M4M: Macro Launches Mining Services & Acq. Manganese Assets
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
23 July 2024
Macro launches Mining Services Division & Acquires
80% Interest in DSO Manganese Assets
Highlights
•
Macro Metals Ltd (Macro) has entered into a binding agreement with Firebird Metals Ltd
(ASX: FRB) (Firebird) to acquire 80% interest in the Wandanya, Disraeli and
Midgengadge Manganese Projects in the Eastern Pilbara region of Western Australia
•
If Macro makes a decision to mine for a Project and Firebird elects to participate, an
incorporated 80:20 SPV will be formed which will enter into a life of mine, mining
services contract (Mining Services Agreement) with Macro’s wholly owned, mining
services subsidiary, Macro Mining Services Pty Ltd (MMS)
•
Under the Mining Services Agreement, MMS will exclusively provide all services across
the entire pit to customer supply chain on a commercial, arms’ length schedule of rates
•
MMS will leverage Macro’s proven in-house exploration and fast-tracked development
capabilities to acquire project equity interests in the exploration assets of other mining
companies that warrant development and provide pit to customer mining services
Wandanya Project:
•
Potential to deliver high grade Manganese Direct Shipping Ore (DSO) product in the
near term in a rising manganese market
•
Consists of 3 Prospects: Wandanya, Donkey and Crossroads
•
Multiple shallow significant drilling results from Donkey Prospect include:
•
o
13m at 23.6% Mn from 1m (DKAT19), including 4m at 34.45% Mn from 6m
o
9m at 25.2%Mn from 1m (DKRC041), including 3m at 39.9% Mn from 3m
o
8m at 29.5% Mn from 10m (DKRC032)
o
8m at 24.0% Mn from 1m (DKRC1)
o
6m at 29.8% Mn from surface (DKRC4)
o
5m at 40.8%Mn from surface, EOH in mineralisation (DKAT35)
o
5m at 35.0%Mn from surface (DKRC024)
o
6m at 30.8% Mn from surface (DKRC045), including 2m at 40.6% Mn from surface
o
6m at 28.8% Mn from surface (DKRC6)
o
4m at 36.2% Mn from 1m (DKRC7)
Crossroads and Wandanya are two additional prospects defined by rock chip sampling
with reported grades of up to 55.3% Mn and 54.55% Mn for Crossroads and Wandanya
respectively
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 1 of 33
Macro Metals Limited (ASX:M4M) (Macro or the Company) is pleased to announce it has signed a
binding Heads of Agreement with Firebird Metals Ltd (ASX: FRB) (Firebird) to acquire an 80%
interest in each of the Wandanya, Disraeli and Midgengadge Manganese Projects (comprising
(E46/1456, E46/1457, E46/1389 and E45/5906) (Projects), located in the East Pilbara region of
Western Australia (Acquisition).
The consideration payable by Macro for its 80% interest in the three Projects is:
•
minimum aggregate expenditure of A$150,000 across the three Projects within 12 months
of completion of the Acquisition; and
•
at least 10 Reverse Circulation (RC) drill holes for a minimum of 100 metres drilled in total on
each Project, the costs of which shall be included in calculation of the A$150,000 minimum
aggregate expenditure.
Macro will free carry Firebird at 20% on each Project through to the completion of a Project
Execution Plan (which shall include a high level mine plan, and capital and operating budget
estimates) and the giving of a decision to mine (DTM) by Macro. During this period, Macro will also
be solely responsible for keeping the tenements in good standing by meeting the minimum annual
expenditure commitments.
Should Macro make a DTM in respect of a Project then:
•
Firebird may elect to retain its 20% interest and form an incorporated joint venture with
Macro on a 20% Firebird : 80% Macro basis (SPV); or
•
convert its project equity interest into a 1% free on board (FOB) royalty on all product
produced and sold from the Project.
If an SPV is formed, then it will enter into a life of mine, mining services contract (Mining Services
Contract) with Macro Mining Services Pty Ltd, a wholly owned subsidiary of Macro (MMS).
Under the Mining Services Contract, the SPV must appoint MMS as the operator of all mining
operations to be conducted by the SPV for the life of mine. MMS will be exclusively responsible for
managing and/or self-performing all activities required to develop and operate each mine
including, but not limited to, project development, construction, mine planning, drill and blast,
mining load and haul, crushing, screening and processing, off-site haulage, port services and
international shipping (Mining Services).
MMS shall provide the Mining Services to the SPV on an arms’ length basis that includes commercial
margins being applied to all overhead, capital and operating expenditure MMS incurs in providing
the Mining Services.
In addition, the SPV will enter into a sales and marketing agreement with Firebird pursuant to
which Firebird will be entitled to receive a commission of 1% of the actual FOB value realised by the
SPV from product sold by Firebird. Firebird may also give notice to the SPV electing to acquire any
volume of product produced by the SPV at prevailing market prices for use in its own downstream
processing operations.
MMS aims to leverage the Company’s existing in-house capability of fast tracking permitting,
exploration and development of exploration assets by entering into agreements with third parties
that have suitable assets warranting development to secure a meaningful project equity stake as
well as life of mine, mining services contracts for the entire pit to customer supply chain.
Completion of the Acquisition is conditional upon due diligence to the absolute satisfaction of
Macro and any necessary regulatory or third-party consents or approvals required before close of
business on 30 September 2024 (or such time as otherwise agreed).
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 2 of 33
The Company advises that Mr Evan Cranston is a Director of both Macro and Firebird, and that three
Macro Directors hold a relevant interest in Firebird as follows; Mr Tolga Kumova (9.37%), Mr Robert
Jewson (2.15%) and Mr Evan Cranston (0.35%). This Acquisition has been approved by the
independent Directors of Macro.
Figure 1: Location plan of East Pilbara Manganese Portfolio
Mr Simon Rushton, Managing Director said: “I am really pleased to have negotiated Macro’s
first joint venture and launch our mining services division.
My aim is to build core project development, construction and operational teams within Macro
supported by an appropriately resourced corporate team. There is a minimum overhead
required regardless of whether you are supporting one operation or several and the key to
being sustainable through the commodity cycles is to get the unit cost of support and
operational services down as quickly as possible.
By providing mining services to third parties we can scale our teams quicker than by only
providing services as we bring each of our own projects into operation. This means we have
more resources, a wider array of skills and experience, redundancy and flexibility sooner; all of
which are crucial for safely running a profitable, sustainable diversified mining and mining
services business.
We will look to take the organic mining services revenue and our 80% profit share from
exploiting the DSO manganese and investing it into our iron ore projects as well as growing
our mining services capabilities. Importantly, this potential revenue may enable us to
evaluate and organically fund a future manganese beneficiation operation likely using simple
dense media separation post crushing and screening.
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 3 of 33
I wish to extend my thanks to Peter and the team at Firebird for an enjoyable and respectful
negotiation process between our two companies. I believe the deal should provide
meaningful value add for our respective shareholders and we will now focus on completing
our due diligence and thereafter getting these Projects unlocked and evaluated as quickly as
possible with the aim of near term production at Wandanya.
From a Macro shareholder perspective, to negotiate an 80% interest in three potentially highquality DSO manganese projects and look to fast track their development in the current
favourable manganese market was opportunistic but too good to look past. While it is a
divergence from iron ore, it is still very much a Pilbara based focus, and the DSO part of a
manganese projects is very similar if not identical to an iron ore operation, in terms of requiring
drill and blast, mining, crushing and screening and mine to port logistics. MMS providing these
mining services will certainly not distract from the wider Macro technical services team’s focus
on fast tracking Cane Bore, Turner and Goldsworthy East.”
Wandanya Project - E46/1456 and E46/1457
The Wandanya Project is located 50km south-west of the Woodie Woodie Manganese Mine in the
East Pilbara Region of Western Australia. The project is located 300km south-east of Port Hedland
and access is via the all-weather Port Hedland-Marble Bar-Ripon Hills-Nifty Road.
The Project is comprised of two granted exploration licences E46/1456 and 1457 covering a land area
of 51km2.
Figure 2: Wandanya Project - Prospect Location Plan
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 4 of 33
Donkey Prospect
The Donkey prospect is located near the junction of the Redmont Creek and Davis River.
Manganese mineralisation crops out in two discrete areas over a 500m long hill area adjacent to
the river terrace of Redmont Creek. Mineralisation appears to be hosted by chert breccia and occurs
as a small-massive and ferruginous manganese area developed in the north and south of the
prospect area. Maximum mineralised depth to bedrock was estimated at 13m.
Extensive drilling has been completed by Pilbara Manganese in 2014 over an area of approximately
390m by 320m. Within areas of high-grade surficial mineralisation, drilling was conducted on an
approximate 10m by 10m spacing.
Multiple significant intercepts identified and key results include:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
13m at 23.6% Mn from 1m (DKAT19) including 4m at 34.4% Mn from 6m;
9m at 25.2%Mn from 1m (DKRC041) including 3m at 39.9% Mn from 3m;
8m at 29.5% Mn from 10m (DKRC032);
8m at 24.0% Mn from 1m (DKRC1);
7m at 31.0% Mn from 11m (DKRC15);
7m at 20.9% Mn from 2m (DKRC9);
6m at 29.8% Mn from surface (DKRC4);
3m at 32.0% Mn from 2m EOH In mineralisation (DKAT13);
5m at 40.8%Mn from surface, EOH in mineralisation (DKAT35);
5m at 35.0%Mn from surface (DKRC024);
6m at 30.8% Mn from surface (DKRC045);
7m at 25.3% Mn from 2m, EOH in mineralisation (DKRC2);
7m at 23.5% Mn from surface (DKRC3);
6m at 28.8% Mn from surface (DKRC6); and
4m at 36.2% Mn from 1m (DKRC7).
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 5 of 33
Figure 3: Outcropping Manganese Mineralisation at Donkey Prospect
Figure 4: Donkey Prospect Drill Collar Plan
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 6 of 33
Crossroads Prospect
The Crossroads prospect consist of a flat-topped hill area located adjacent to the Nullagine-Ant HillSkull Springs cross-roads.
The western edge of the prospect is marked by a 5m to 8m high scarp, with outcropping of rounded
shiny black massive manganese occurring in a chert breccia. The hill is approximately 380m long
and 80m to 220m wide. Outcropping away from the western edge of the hill is characterised by
lateritic material and minor areas of manganese mineralised outcrop.
The prospect covers an area of approximately 1km north to south and is 300m wide. Exploration
activities have included rock chip sampling, with significant results including 55.2% Mn and 53.3%
Mn.
Figure 5: Crossroads Prospect - Rock Chip Samples (Mn%)
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 7 of 33
Wandanya Prospect
Extensive rock chip sampling has been completed across the Wandanya Prospect by Shaw River
Resources and Talisman Mining with grades of up to 64.96% Mn returned.
The southern zone has mineralisation defined over an area approximately 1,000m by 800m. No
drilling has been completed to date across this prospect.
Figure 6: Wandanya Prospect - Rock Chip Samples (Mn%)
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 8 of 33
Disraeli Project- E46/1389
The Disraeli Project is located 230km north-north-east of Newman and 50km south of the Woodie
Woodie Manganese Mine. Access from Newman is via the Balfour Downs gravel road. Exploration
conducted has included rock chip sampling, Dipole-Dipole Induced Polarisation (DDIP) and limited
drilling of the DDIP survey targets.
Drilling of the DDIP targets intersected manganese mineralisation:
•
•
17m at 14.1% Mn from 76m (SWW320); and
11m at 15.1% Mn from 93m (SWW322).
Multiple prospects within the Project have been rock chip sampled and have provided encouraging
results with no drill testing to date. A comprehensive program of collating the available exploration
information on the Project has commenced.
Midgengadge Project- E45/5906
The Midgengadge Project is located approximately 30km (75km via road) northwest of the Woodie
Woodie Managanese Mine.
Key Terms of the Acquisition
•
Subject to due diligence and any required third party consents to be satisfied or waived by
Macro on or before 30 September 2024 (or such later date as the parties may agree), Macro
will acquire an 80% interest in each of E46/1456, E46/1457, E46/1389 and E45/5906 from
Firebird, an unrelated party.
•
Macro to pay the following consideration for its 80% interest in the three Projects:
o
spend an aggregate $150,000 on exploration activities across the three Projects over
the next 12 months; and
o
drill a minimum of 10 RC holes and a minimum total of 100m drilled on each Project
with costs to count towards aggregate expenditure commitment.
•
Macro will free carry Firebird at 20% on each Project through to a decision to mine by Macro.
•
A decision to mine must be accompanied by a mineral resource estimate and a Project
Development Plan prepared by Macro and that includes Macro’s high level mining plan and
budget estimate pricing for the development and operation of a mineral on the Project.
•
Should Macro make a decision to mine in respect of a Project, Firebird can elect by written
notice within 30 days to either:
•
o
retain its 20% interest and form an incorporated joint venture with Macro for that
Project; or
o
convert its equity interest in that Project to a 1% FOB royalty on all product produced
and sold from the Project.
Upon formation of an SPV:
o
ASX:M4M
The SPV will enter into a life of mine, mining services contract with Macro’s wholly
owned mining services subsidiary, MMS, pursuant to which MMS will provide and/or
manage all services in the pit to customer supply chain on an arms’ length,
commercial basis via a schedule of rates.
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 9 of 33
o
a sales and marketing agreement with Firebird pursuant to which Firebird will:
▪
receive a commission of 1% of actual realised FOB value on all product
produced by MMS and sold by Firebird; or
▪
have the right to acquire product produced by MMS from the Project at
prevailing market prices for use in Firebird’s own downstream processing
operations.
•
If Macro determines not to give a decision to mine in respect of a Project, then Firebird will
have the right to re-acquire that Project from Macro for nominal consideration.
•
The agreement otherwise contains terms and conditions considered standard for
agreements of this nature.
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Simon Rushton
Managing Director
Macro Metals Limited
+61 8 6143 6707
info@macrometals.com.au
Alex Cowie
NWR Communications
+61 412 952 610
alexc@nwrcommunications.com.au
About Macro Metals Limited
Macro’s Iron Ore portfolio has the potential for multiple sources of iron ore production utilising the
well-established and proven export infrastructure of the Pilbara and emerging infrastructure in the
West Pilbara.
The Company is focussing on expediting the development of its Cane Bore, Catho Well, Turner and
Goldsworthy projects.
Utilising a fit for purpose, safety and results focused, rapid development approach across the Macro
assets the Board sees substantial scale and the real potential for Macro to quickly become a multi
mine iron ore producer.
Competent Person’s Statement
The information in this announcement that relates to the East Pilbara Manganese Portfolio is based
on information compiled and fairly represented by Mr Robert Jewson, who is a Member of the
Australian Institute of Geoscientists and Executive Director of Macro Metals Limited. Mr Jewson has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration,
and to the activity which he has undertaken, to qualify as a Competent Person as defined in the
2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves. Mr Jewson consents to the inclusion in
this report of the matters based on this information in the form and context in which it appears. Mr
Jewson is a shareholder of Macro Metals Ltd.
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 10 of 33
Forward Looking Statements
This announcement may include forward-looking statements. Forward-looking statements are
only predictions and are subject to risks, uncertainties and assumptions which are outside the
control of the Company. Actual values, results or events may be materially different to those
expressed or implied in this announcement. Given these uncertainties, recipients are cautioned not
to place reliance on forward looking statements. Any forward-looking statements in this
announcement speak only at the date of issue of this announcement. Subject to any continuing
obligations under applicable law, the Company does not undertake any obligation to update or
revise any information or any of the forward-looking statements in this announcement or any
changes in events, conditions, or circumstances on which any such forward looking statement is
based.
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 11 of 33
Appendix 1: Exploration Results and Location Information
Table 1: Wandanya Prospect Rock Chip Results
Sample
Easting
Northing
Mn %
Al2O3 %
CaO %
MgO %
Na2O %
SiO2 %
TiO2 %
RC010
280233
7570017
41.59
5.13
0.63
7.21
3.83
12.17
0.25
0.86
0.033
0.251
5.9
0.06
SJE1001
280933
7569932
41.66
1.01
0.34
13.97
1.62
11.86
0.13
0.12
0.054
0.086
4.15
0.02
SJE1002
280979
7570037
54.55
1.26
0.35
2.34
2.07
12.24
0.14
0.13
0.025
0.035
2.59
0.02
SJE1003
280962
7570659
7.7
2.24
0.34
44.15
0.62
9.37
0.18
0.25
0.106
0.312
10.59
0.14
SJE1004
281059
7570914
48.29
1.98
0.53
2.68
2.91
11.9
0.29
0.56
0.048
0.075
7.08
0.04
SJE1005
281094
7571151
15.81
1.73
0.09
37.87
0.6
10.2
0.16
0.19
0.03
0.142
8.17
0.06
SJE1006
281181
7571155
37.4
2.17
0.22
10.44
2.12
10.85
0.16
0.32
0.079
0.147
13.54
0.04
SJE1007
280835
7569970
23.75
2.84
0.19
25.71
1.38
11.16
0.28
0.14
0.059
0.114
10.8
0.08
SJE1008
280697
7569874
41.32
2.91
0.64
11.58
3.15
12.14
0.12
0.44
0.058
0.318
3.04
0.02
SJE1009
280559
7570113
38.04
3.01
0.39
6.1
3.35
10.53
0.38
0.65
0.02
0.217
18.02
0.03
SJE1010
280499
7570073
32.2
3.34
0.49
5.03
2.96
9.05
0.17
0.34
0.009
0.266
29.63
0.07
SJE1011
280282
7570053
46.64
5.41
0.22
2.63
4.07
12.21
0.21
0.33
0.021
0.019
7.95
0.07
SJE1012
280236
7570016
34.54
4.96
0.47
13.52
3.2
11.81
0.35
0.67
0.025
0.196
8.1
0.06
WD011
280652
7569842
0.5
3.83
2.41
27.84
0.47
5.63
1.21
0.08
0.072
0.151
46.55
0.12
WD012
280622
7569855
1.05
2.03
0.07
5.3
0.66
2.68
0.33
0.03
0.029
0.02
85.72
0.09
WD013
280559
7569823
16.92
3.44
0.11
11.43
0.98
5.48
0.11
0.05
0.039
0.012
49.57
0.16
WD014
280555
7569808
12.7
2.73
0.09
12.51
0.73
4.22
0.04
0.05
0.043
0.009
56.6
0.12
WD015
280531
7569801
6.29
2.66
0.09
17.13
0.38
2.97
0.03
0.03
0.062
0.048
61.81
0.09
WD016
280504
7569836
5
4
0.27
9.5
2.02
4.27
0.48
0.02
0.014
0.051
69.62
0.19
WD017
280408
7569934
43.26
5.49
0.25
3.5
2.89
11.66
0.28
0.43
0.03
0.008
10.77
0.14
WD018
280324
7569985
36.37
8.1
0.07
11.95
1.79
12.14
0.05
0.2
0.04
0.014
5.41
0.24
WD019
280243
7570020
24.89
5.53
0.23
21.3
2.57
10.93
0.39
0.32
0.041
0.069
11.54
0.13
WD020
280525
7570034
41.52
6.85
0.21
4.69
3.67
12.51
0.16
0.3
0.013
0.037
7.64
0.06
WD021
280522
7570041
23.35
2.76
0.39
6.45
2.1
7.44
0.06
0.23
0.008
0.25
44.42
0.06
WD022
280550
7570075
13.35
1.26
0.29
39.17
1.08
10.89
0.22
0.1
0.233
0.116
9.08
0.04
WD023
280565
7570107
3.3
2.19
0.2
49.46
0.64
10.66
0.23
0.07
0.192
0.125
9.2
0.08
WD024
280507
7570098
20.55
1.2
0.29
28.58
1.55
10.74
0.14
0.15
0.149
0.126
12.6
0.04
WD025
280577
7570128
0.77
1.67
0.08
6.12
0.11
1.93
0.05
0.03
0.017
0.071
88
0.09
WD026
280772
7570056
7.69
2.83
0.11
39.69
0.8
10.04
0.18
0.14
0.145
0.093
18.23
0.11
WD027
280770
7570013
1.35
2.12
0.21
58.52
0.2
5.19
0.15
0.03
0.041
0.196
5.9
0.05
WD028
280832
7569978
30.59
2.94
0.14
18.52
2.04
11.26
0.2
0.19
0.053
0.049
10.7
0.1
WD029
280975
7570659
0.6
2.21
0.29
51.85
0.31
9.01
0.12
0.23
0.162
0.328
12.51
0.09
WD030
280921
7570713
0.14
1.26
0.49
50.9
0.07
10.11
0.03
0.31
0.124
0.386
15.52
0.04
WD031
281065
7570909
47.27
2.39
0.57
1.7
3.2
12.25
0.32
0.67
0.041
0.069
6.53
0.05
WD032
281092
7571154
9.32
2.92
0.07
43.19
0.54
9.27
0.08
0.15
0.039
0.17
11.13
0.08
WD033
281157
7571158
24.31
2.23
0.13
29.69
0.92
9.59
0.08
0.19
0.038
0.139
6.65
0.04
WD034
281184
7571152
39.29
2.61
0.24
9.55
2.56
11.26
0.22
0.32
0.064
0.073
10.13
0.05
WD035
280297
7569989
7.71
1.46
0.08
5.24
0.62
3.08
0.02
0.08
0.014
0.049
77.74
0.02
WD036
280310
7569980
33.3
3.52
0.28
11.61
1.64
11.92
0.25
0.15
0.081
0.023
5.91
0.05
WD037
280329
7569954
34.18
5.77
0.08
15.93
1.75
11.54
0.03
0.12
0.042
0.023
6.66
0.26
ASX:M4M
Fe %
K2O %
LOI %
P%
S%
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 12 of 33
Sample
Easting
Northing
Mn %
Al2O3 %
CaO %
MgO %
Na2O %
WD038
280307
7569895
24.2
5.63
0.06
6.73
1.79
8.15
0.04
0.34
0.018
WD039
280366
7569792
35
7.3
0.22
8.69
2.45
12.54
0.16
0.34
WD040
280129
7569555
2.17
13.17
0.02
41.85
0.24
9.99
0.03
WD041
280183
7569443
28.3
15.84
0.39
9.86
1.43
14.53
WD042
280182
7569600
1.01
19.31
0.04
33.53
0.15
WD043
280457
7569832
41.56
6.2
0.32
4.96
WD044
280442
7569780
1.24
1.12
0.08
WD045
280481
7569615
42.16
7.33
WD046
280714
7569623
7.71
WD047
280625
7569578
WD048
280467
WD049
280474
ASX:M4M
Fe %
K2O %
LOI %
P%
S%
SiO2 %
TiO2 %
0.013
39.62
0.2
0.01
0.007
13.61
0.05
0.03
0.057
0.059
13.82
0.77
0.19
0.21
0.039
0.02
11.58
1.13
12.46
0.1
0.02
0.061
0.052
18.76
1.14
3.77
11.84
0.12
0.22
0.024
0.045
10.09
0.05
2.79
0.21
1.48
0.07
0.02
0.003
0.022
92.55
0.04
0.44
4.07
3.4
12.79
0.51
0.46
0.072
0.057
9
0.07
1.64
0.34
50.62
0.69
3.45
0.03
0.07
0.038
0.187
11.17
0.07
40.56
6.98
0.22
3.85
2.98
12.29
0.14
0.48
0.008
0.04
11.84
0.08
7569614
29.46
3.47
3.34
11.2
2.52
13.93
1.89
0.66
0.078
0.041
15.91
0.03
7569626
36.43
9.01
0.53
2.84
3.23
12.01
0.48
0.39
0.054
0.017
18.77
0.15
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 13 of 33
Table 2: Donkey and Crossroads Rock Chip Results
Sample
Easting
Northing
Al2O3%
CaO %
Fe %
K2O%
LOI%
MgO%
Mn%
SiO2 %
SO3%
TiO2%
DKJP056
284532
7575790
2.16
0.12
24.5
1.52
12.7
0.05
33.1
2.34
0.03
0.08
DKJP057
284577
7575907
1.11
0.15
14.3
1.26
12.8
0.07
44.1
2.48
0.11
-0.01
DY001
284736
7575990
2.35
0.83
21.1
1.34
14.1
0.56
34.1
4.2
0.12
0.09
DY002
284720
7575997
1.5
0.24
2.21
2.44
12.6
0.25
55.2
2.57
0.06
0.06
DY003
284789
7575957
2.39
0.81
13.6
0.94
14.1
0.5
42.3
3.28
0.11
0.04
DY004
284579
7575919
1.44
0.26
3.32
2.15
13
0.21
55.3
1.64
0.07
0.02
DY005
284597
7575829
6.67
0.13
8.8
1.37
13.7
0.15
43.2
5.18
0.09
0.58
DY006
284528
7575796
2.67
0.1
16.6
1.58
13.5
0.11
39.6
1.9
0.05
0.1
DY007
284519
7575745
1.95
0.09
7.87
1.05
13.1
0.06
50.9
1.4
0.06
0.04
DY008
284490
7575732
1.12
0.03
56.1
0.11
11.2
0.07
1.72
2.39
0.11
0.06
DY009
284503
7575796
2.08
0.09
31.4
1.65
12.5
0.28
25.7
3.21
0.08
0.09
DY010
284486
7575761
4.02
0.07
17.6
2.07
13.5
0.15
37.4
3.53
0.08
0.15
DY011
284467
7575754
2.17
0.23
25.5
2.37
12.7
0.23
27.7
7.15
0.09
0.09
DY012
284399
7575726
6.47
0.04
25.6
1.59
13.6
0.09
27.4
3.99
0.1
0.34
DY013
284411
7575701
6.94
0.07
8.56
1.93
14.4
0.12
44.1
3.28
0.08
0.41
DY014
284393
7575601
3.75
0.13
3.03
2.29
13.4
0.14
53.3
1.1
0.05
0.07
DY015
284386
7575544
7.54
0.05
29.6
0.66
13.6
0.19
22.6
4.51
0.22
0.3
PM102326
284750
7574422
1.22
0.1
4.88
1.35
12.6
0.06
52.6
5
0.06
0.03
PM106821
284722
7574539
2.36
0.08
9.43
1.6
13
0.03
48.9
0.92
0.04
0.06
PM106822
284605
7575071
3.11
0.13
18
0.89
12.8
0.08
34.5
8.89
0.08
0.1
PM106823
284577
7575104
3.27
0.12
11.4
2.04
13.2
0.05
41.7
6.15
0.08
0.1
PM106824
284778
7574396
1.31
0.07
3.84
1.24
10.7
-0.01
45.3
17.3
0.06
0.03
PM106825
284642
7574993
1.26
0.09
18.6
1.05
13.2
0.04
40
2.43
0.05
0.04
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707 | info@macrometals.com.au | www. macrometals.com.au | Page 14 of 33
Table 3: Donkey Drill Results
Hole
Type
Easting
Northing
Maximum Depth
Azimuth
Dip
DKAT1
AC
284727.6
7574550
6
0
-90
DKAT10
AC
284446.8
7574357
3
0
-90
DKAT11
AC
284438.7
7574335
3
0
-90
DKAT12
AC
284629.6
7574372
13
0
-90
DKAT13
AC
284634
7574363
6
0
-90
DKAT14
AC
284638.4
7574355
6
0
-90
DKAT15
AC
284642.7
7574347
6
0
-90
DKAT16
AC
284647
7574339
21
0
-90
DKAT17
AC
284655.1
7574343
6
0
-90
DKAT18
AC
284663.1
7574348
4
0
-90
DKAT19
AC
284671.3
7574352
14
0
-90
DKAT2
AC
284744.7
7574555
6
0
-90
DKAT20
AC
284667.1
7574360
13
0
-90
DKAT21
AC
284679.5
7574356
19
0
-90
DKAT22
AC
284675.6
7574344
18
0
-90
DKAT23
AC
284662.1
7574389
9
0
-90
DKAT24
AC
284670.3
7574393
12
0
-90
DKAT25
AC
284665.9
7574401
12
0
-90
DKAT26
AC
284752.2
7574406
19
0
-90
DKAT27
AC
284748
7574414
9
0
-90
DKAT28
AC
284784.7
7574423
7
0
-90
DKAT29
AC
284740.5
7574457
6
0
-90
DKAT30
AC
284733.7
7574469
9
0
-90
DKAT31
AC
284755.5
7574350
15
0
-90
DKAT32
AC
284689.2
7574456
9
0
-90
DKAT33
AC
284685
7574464
6
0
-90
DKAT34
AC
284676.8
7574460
7
0
-90
DKAT35
AC
284668.6
7574455
8
0
-90
DKAT4
AC
284761.9
7574572
6
0
-90
DKAT5
AC
284736.5
7574575
6
0
-90
DKAT6
AC
284685.5
7574480
3
0
-90
DKAT7
AC
284669.7
7574478
5
0
-90
DKAT8
AC
284659.7
7574466
4
0
-90
DKAT9
AC
284454.2
7574345
8
0
-90
DKRC019
RC
284677.6
7574591
40
0
-90
DKRC020
RC
284681.6
7574534
34
0
-90
DKRC021
RC
284708.1
7574560
34
0
-90
DKRC022
RC
284737.3
7574528
34
0
-90
DKRC023
RC
284768
7574443
34
0
-90
DKRC024
RC
284763.8
7574411
28
0
-90
DKRC025
RC
284736.2
7574472
34
0
-90
DKRC026
RC
284742.3
7574383
22
0
-90
ASX:M4M
Macro Metals Limited ACN 001 894 033
Suite 23, 513 Hay Street, Subiaco WA 6008 | PO Box 1311, Subiaco WA 6904
+61 (0) 8 6143 6707
Share your feedback
Discover