JUNE 2025 QUARTERLY ACTIVITIES REPORT
HIGHLIGHTS
LMFP BATTERY STRATEGY
•
Additional testing equipment installed enabling Firebird to complete laboratory scale
production from “Ore to Cathode” within its own R&D laboratory.i Button
manufacturing and testing will remain at third party independent laboratory.
•
10 kg/day lab-scale cathode production facility now established.
•
LMFP results demonstrate higher energy density for Firebird LMFP, with key
measurements (0.1C@156 mAh/g)ii indicating >10% improvement over standard LFP.
•
These LMFP test work results exceed current industry benchmarks; ongoing
development aims to enhance this further using advanced methodologies.
•
Over 100 LMFP batches have been completed, with sample stockpile being built for
distribution to Chinese and Western cathode manufacturers.
•
Substantial cost advantages expected to flow through to manganese sulphate
operating costs through this innovative LMFP production process, which retains
manganese sulphate in solution, eliminating the need for sulphate crystallisation,
packaging and other ancillary costs.
•
Subsequent to the quarters end, two patents have been granted and four advancing
through national review in China, strengthening Firebird’s robust intellectual property
portfolio across the full LMFP value chain—from precursor formulation to advanced
cathode architecture.iii
•
Patents confirm Firebird’s technical leadership in the fast-growing LMFP sector,
showcasing our innovation edge in next-generation manganese-rich battery
chemistries.
•
Patents are 100% owned by Firebird, supporting the Company’s LMFP strategy
launched in 2023 and firmly positioning Firebird at the forefront of western LMFP
technology development.
CORPORATE
•
Leading global battery expert Ken Hoffman appointed as special advisor to assist with
strategy to expand the Company’s activities into Western markets.
•
Mr Hoffman was previously the Global Head of Battery Materials at McKinsey &
Company, where he advised on strategic planning, supply chain integration, and
capital raising for clients across the global battery value chain
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
KILN DEVELOPMENT
•
Firebird successfully completed calcining trials for Taza Metal Technologies (Taza), an
established manganese chemical business based in Kazakhstan, who supplies the
European market.iv
•
Taza, seeking to utilize stockpiles of lower-grade manganese ore (18–20% Mn) for highpurity manganese sulfate (HPMSM) production, engaged the Firebird technical team
for support.
•
Taza is seeking to procure manganese chemical processing equipment, including a
calcining kiln, from China. Trial work with Firebird forms a critical component of their
due diligence in assessing potential supply partners.
•
Trial work was based on 3.3 tonne manganese ore sample received from Taza and Taza
has covered all costs associated with completing the test work.
•
Results demonstrated a significant energy reduction, with average consumption of 230
kWh per tonne of ore feed (which includes drying and kiln pre-heating), compared to
greater than 400 kWh/t quoted for conventional rotary kilns by third party suppliers.
On a commercial-scale kiln, a further 25% reduction is expected— bringing total
consumption to less than half.
MANGANESE MARKET DEVELOPMENTS
•
Strong structural growth in demand for high-purity manganese chemicals, driven by
current increasing adoption of LMFP and emerging LMR cathode technologies. Recent
GM and Ford announcements confirm LMR as a key focus for future EV platforms.
FINANCIAL
•
Cash at 30 June 2025: $1.5 million.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Firebird Metals Limited (ASX: FRB, “Firebird” or “the Company”) is pleased to provide an
update on its activities during the June 2025 Quarter (“the Quarter”).
LMFP BATTERY STRATEGY
Installation of the final equipment components enabling “Ore-to-Cathode” lab-scale production
facility.
Installed equipment is now operational, with a production capacity of 10 kilograms of MFP
cathode material per day. Samples are available for distribution to interested cathode
manufacturers both within China and Western cathode producers.
The test facility allows Firebird to test the impact of different feedstocks, from front of process
through to final product, and therefore provides a capability to test, measure and de-risk the
impact of different feedstocks on process all the way through to final product.
Firebird’s LMFP test work program made strong progress during the quarter, with over 100
batches completed at its R&D Centre and preparation of sample material underway for external
evaluation. Button cell testing continues via third-party laboratories.
Test work completed in collaboration with Central South University (CSU) who is globally
recognised for its leadership in battery materials innovation. CSU’s faculty includes some of the
world’s foremost experts in the lithium-ion battery supply chain, and its alumni include founders
of major industry players such as BYD and Ronbay Technology.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Discharge
Specific
Capacity
Firebird Results
Targeting
0.1 C
156 mAh/g
>160 mAh/g
1C
133 mAH/g
>140 mAh/g
Chinese Industry Standard
(T/CIAPS0029—2023)
150 mAh/g
130 mAh/g
Note: 0.1C discharge capacity is the discharging or charging entire capacity over 10 hours & 1C discharging or charging
entire capacity over 1 hours, both LMFP based Mn/Fe 60/40, with theoretical Voltage for cathode of 3.82V, all testing
conducted in accordance with Chinese Industry Standard T/CIAPS0029—2023
Theoretical Energy Density Industry benchmarking based on 0.1C Testing
Producer / Source
mAh/g
Volts
Theoretical Energy Density
(mAh/g x V = Wh/kg)
Firebird LMFP
156
3.82
595.92 Wh/kg
Dynanonic Spec Sheet LFP
>150
3.41
511.5 Wh/kg
16.5%
Dynanonic LFP commercial
testing by CSU
158
3.41
538.78 Wh/kg
10.6%
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
%
Improvement
of FRB LMFP
over
www.firebirdmetals.com.au
Results of the testing exceed Chinese industry standards, using materials that are all
commercially available and from third party chemical suppliers. Test results confirm that
Firebird’s MFP precursor materials can produce batteries that meet, and in some cases exceed,
Chinese Industry standards. This demonstrates their strong potential as suitable feedstock for
CAM manufacturers.
Discharge Specific Capacity refers to the amount of electric charge a battery can deliver per unit
mass of the active material during discharge. It is a key performance indicator for battery
materials, especially cathodes and anodes.
These results will provide essential real-world performance data for prospective cell
manufacturing partners, supporting efforts to optimise battery efficiency, product consistency,
and scalability.
The results will establish the baseline for ongoing test work, including metal doping,
carbonisation, and nanonisation, in line with customer processes and test methods — each
expected to further enhance cathode performance.
LMFP PATENTS
Post-quarter end Firebird announced that two “Invention Patents” were granted in China for its
proprietary LMFP material design and synthesis processes. These patents are 100% owned by
Firebird and provide a structural cost and performance advantage by enabling direct integration
of high-purity manganese sulphate (HPMSM) production with pre-cathode (pCAM) synthesis.
Four additional patents are advancing through national review in China, with international filings
also underway. Together, these patents represent a comprehensive portfolio of innovations in
LMFP material design and synthesis, from precursor engineering to final cathode structures.
By integrating manganese sulphate (MnSO₄) production directly with MFP pCAM processing,
Firebird expects to realise a significant natural cost advantage in LMFP cathode material
manufacturing — a key differentiator as the Company advances its strategy to become a vertically
integrated, low-cost producer of manganese-based battery materials.
This vertically integrated approach is a key differentiator as the Company continues to advance
its strategy to become a low-cost, globally competitive producer of manganese-based battery
materials. Importantly all intellectual property remains owned by Firebird Metals.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Recent export restrictions imposed by China on advanced LMFP technology underscore the
strategic importance of Firebird’s fully owned intellectual property. Developed independently
through in-house innovation and collaboration with leading research institutions allows the
Company to retain full control over its development pathway and commercialisation strategy. With
the flexibility to operate both within China—where Firebird’s R&D and pilot operations are based—
and in Western markets, Firebird is uniquely positioned to supply high-performance, manganeserich cathode materials to a rapidly growing global battery industry.
KILN DEVELOPMENT
The Company announced it has successfully completed calcining and leaching test work for Taza
Metal Technologies (Taza) which is a part of ongoing technical due diligence of Firebird’s energyefficient calcining kiln for Taza’s manganese chemical production.
Firebird’s Chinese subsidiary, Hunan Firebird Battery Technology (HFBT), has processed 3.3 tonnes
of 18-20% manganese ore from lower-grade stockpiles from Taza’s mine in Kazakhstan using the
Company’s pilot scale calcining kiln, reducing the manganese ore to manganese monoxide (MnO).
Taza has covered all costs associated with completing the test work.
This is another significant step in the Company’s strategy to commercialise its innovative, efficient
technology globally, and validates the quality of Firebird’s calcining kiln.
The trial demonstrated significant energy reduction, 230 kW/t (including energy consumption
during startup and preheating) achieved against quoted 400 + kW/t for conventional rotary kilns
from third party suppliers. On a commercial-scale kiln, a further 25% reduction is expected—
bringing total consumption to less than half.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Taza Metal Technologies, a Kazakhstan-based manganese mining and chemical processing
company, is seeking to utilize stockpiles of lower-grade manganese ore (18–20% Mn) for highpurity manganese sulfate (HPMSM) production.
Taza is actively pursuing the procurement of manganese chemical processing equipment from
China, including a calcining kiln, as part of its strategy to expand high-purity manganese sulphate
(HPMSM) production. As a key component of its due diligence process, Taza has re-engaged
Firebird’s technical team, following previous successful collaboration, to undertake test work.
These trials are designed to evaluate the performance, efficiency, and operational suitability of the
proposed equipment under real-world conditions, providing critical technical validation to support
Taza’s procurement decisions.
Firebird’s Energy Efficient Calcining Kiln
Firebird’s calcining kiln, currently under patent application, provides significantly greater energy
efficiency than existing alternatives. Firebird has successfully completed trials of the pilot scale
calcining kiln, with remarkable results generated – indicating that the calcining kiln has the
potential to reduce energy usage by 70%.1
Compared to conventional kilns, which typically require more than 300kWh per tonne of feed,
FRB’s pilot kiln operates at only 80-100kWh per tonne – translating to a significant cost reduction
of USD30 per tonne of product, or approximately 5% of total production costs.
The calcining kiln technology is highly scalable, and in addition to applications in manganeserelated mineral processing, will also be assessed for use across industries such as iron ore
beneficiation and lithium sulphate production.
1
See FRB ASX announcement dated 21 October 2024: FRB Successfully Test Energy Efficient Rotary Kiln – 70% Reduction in Energy Consumption
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
MANGANESE RICH BATTERY CHEMISTRIES
The use of manganese-rich cathodes is expanding rapidly, with LMFP (Lithium Manganese Iron
Phosphate) emerging as the leading candidate for mass-market adoption. MFP precursor
materials will be critical in facilitating the broader shift from LFP to LMFP cathodes, supporting
the next generation of cost-effective and higher-performing battery technologies. Soochow
Securities forecast that LMFP will replace 50% of LFP to become a >US$20 billion market by 2030.
The companies long term objective is to provide fully integrated processing solutions for
manganese-rich cathode materials, with an initial focus on the rapidly emerging LMFP
technology. While our R&D centre and operations are initially based in China, where global
leadership in cathode material development and production makes it the ideal foundation. Our
long-term objective is to replicate these activities in Western markets through the deployment of
advanced technology and the establishment of localised production facilities. The Company looks
forward to providing further updates as the test work program progresses.
The use of manganese-rich cathodes is expanding rapidly, with LMFP (Lithium Manganese Iron
Phosphate) emerging as the leading candidate for mass-market adoption. MFP precursor
materials will be critical in facilitating the broader shift from LFP to LMFP cathodes, supporting
the next generation of cost-effective and higher-performing battery technologies. Soochow
Securities forecast that LMFP will replace 50% of LFP to become a >US$20 billion market by 2030.
The companies long term objective is to provide fully integrated processing solutions for
manganese-rich cathode materials, with an initial focus on the rapidly emerging LMFP technology.
Our R&D centre is initially based in China, where global leadership in cathode material
development and production makes it the ideal foundation.
CORPORATE
Ken Hoffman has been appointed as a special advisor. Mr Hoffman is a globally recognised expert
in battery materials, with over 30 years of experience across investment management, energy,
and the metals and mining sectors. He previously served as Global Head of Battery Materials at
McKinsey & Company, where he led strategic planning, supply chain integration, and capitalraising initiatives for clients across the global battery value chain. Ken has conducted over 100 due
diligence assessments on battery technologies and critical mineral assets and has developed AIbased evaluation frameworks for leading industry stakeholders.
Prior to his tenure at McKinsey, Ken was Global Head of Metals & Mining Research at Bloomberg
and held senior investment roles as Portfolio Manager and Global Director of Research at major
funds including Millennium Partners and MarCap Investors.
Global demand for high-purity manganese chemicals is entering a period of structural growth,
driven by the rapid adoption of LMFP and the emerging shift toward LMR cathode technologies.
These manganese-rich chemistries provide a cost-effective, high-performance alternative to
traditional ternary batteries. Recent announcements from GM and Ford underscore this
transition, with both automakers advancing LMR battery production as part of their nextgeneration EV strategies. However, there is currently very limited high-purity manganese sulphate
production capacity outside of China, highlighting the urgent need for diversified and scalable
supply to meet this growing demand. This marks a significant turning point for manganese,
reinforcing its critical role in the future of battery materials
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
FINANCIAL OVERVIEW
The Appendix 5B for the quarter ended 30 June 2025 provides an overview of the Company’s
financial activities.
Exploration expenditure for the Quarter was $167,000 and primarily related to environmental
work and consulting fees.
Expenditure related to the development of the Chinese manganese sulphate plant and Mn 3O4
plant was $306,000.
The total amount paid to Directors of the Company, their associated and other related parties was
$168,000 comprising salary and Directors’ fees.
Cash and cash equivalents at Quarter end were $1.5M.
This announcement has been approved for release by the Board.
For further information contact:
Mr Peter Allen
Managing Director
+61 8 6245 9818
admin@firebirdmetals.com.au
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
About Firebird Metals Limited
Firebird Metals is an advanced manganese developer focused on combining mining and
downstream processing with a dedication to the advancement of the EV battery sector.
The Company is currently progressing its unique China-focused lithium manganese iron
phosphate (“LMFP”) battery strategy, which will develop Firebird into a near-term producer of highpurity, battery-grade manganese sulphate, a key cathode material in LMFP batteries for electric
vehicles.
Execution of this strategy will place Firebird at the forefront of manganese sulphate production,
at a time when the use and demand for manganese in batteries continues to rapidly grow. Due to
the low number of ASX-manganese developers and increasing use of LMFP by car manufacturers,
Firebird considers that it is in a strong position to benefit from this growing market and deliver
significant value to its shareholder base.
The Company also owns 100% of its project portfolio, located in the renowned East Pilbara
manganese province of Western Australia, which boasts a total Resource of 234Mt2,3, with exciting
exploration and development growth upside. The portfolio is led by the flagship Oakover Project,
which holds a Mineral Resource Estimate of 176.7 Mt at 9.9% Mn, with 105.8 Mt at 10.1% Mn in an
Indicated category.
The Company is committed to generating sustainable long-term value and growth for
stakeholders, through the implementation of best practice exploration methods while prioritising
the well-being, health and environmental protection of its employees and communities it operates
in.
JORC Compliance Statement
This announcement contains references to Mineral Resource Estimates, which have been reported
in compliance with Listing Rule 5.8 and extracted from previous ASX announcements as
referenced. The Company confirms that it is not aware of any new information or data that
materially affects the information previously reported and that all material assumptions and
technical parameters underpinning the Mineral Resource Estimates continue to apply and have
not materially changed.
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global Resource of 176.7
Mt at 9.9% Mn.
2
3
See ASX announcement dated 1 December 2021: Inferred Resource of 57.5 Mt at 12.2% Mn.
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Forward-looking statements
This announcement may contain certain “forward-looking statements”. Forward looking
statements can generally be identified by the use of forward-looking words such as, “expect”,
“should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”, “estimate”, “target” and other
similar expressions. Indications of, and guidance on, future earnings and financial position and
performance are also forward-looking statements. Forward-looking statements, opinions and
estimates provided in this presentation are based on assumptions and contingencies which are
subject to change without notice, as are statements about market and industry trends, which are
based on interpretations of current market conditions. Forward-looking statements including
projections, guidance on future earnings and estimates are provided as a general guide only and
should not be relied upon as an indication or guarantee of future performance.
Additional Listing Rule Information
The Company advises the following information in accordance with Listing Rule 5.3.3 as at 30 June
2025:
Western Australian
Project
Tenement
Ownership at the
Start of quarter
Ownership at end of
Quarter
Oakover
Oakover
Oakover
Oakover
Hill 616
Disraeli*
E 52/3577
E 46/1392
E 52/3948
E 46/1570
E 52/3633
E 46/1389
100%
100%
100%
100%
100%
20%
100%
100%
100%
100%
100%
0%
Wandanya
Wandanya*
E 46/1456
E 46/1457
20%
20%
20%
0%
The Company notes that the tenements marked with * were surrendered during the quarter and
confirms that there no acquisitions of tenement interests during the quarter.
References
FRB ASX Announcement 10 June 2025: Firebird Installs Additional Equipment to Advance
“Ore To Cathode” Laboratory-Scale Production
ii
mAh/g is milliampere-hours per gram & 0.1C discharge capacity is the discharging or
i
charging entire capacity over 10 hour, LMFP based Mn/Fe 60/40, with theoretical Voltage for
cathode of 3.82V.
iii
FRB ASX Announcement 21 July 2025: Firebird Secures Key LMFP – Strengthens Global IP
Position in Next-Gen Battery Materials
iv
FRB ASX Announcement 21 July 2025: Firebird’s Energy Saving Rotary Kiln Successfully Tests
Low Grade Manganese Ore for European Sulphate Producer, Reducing Energy Use by >50%
Suite 38, 460 Stirling Highway
Peppermint Grove WA 6011
ABN: 24 610 035 535
+61 8 6245 9818
admin@firebirdmetals.com.au
ASX:FRB
www.firebirdmetals.com.au
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Firebird Metals Limited
ABN
Quarter ended (“current quarter”)
24 610 035 535
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
(27)
(253)
(b) development
-
-
(c) production
-
-
(d) staff costs
(168)
(838)
(e) administration and corporate costs
(226)
(966)
(a) exploration & evaluation
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
-
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (GST refunds)
40
324
1.9
Net cash from / (used in) operating
activities
(381)
(1,733)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
(47)
(d) exploration & evaluation
(140)
(420)
(e) investments – MnSO4+Mn3O4 plant
China
(306)
(1,391)
-
-
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(446)
(1,858)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
-
-
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
-
-
3.5
Proceeds from borrowings
-
45
3.6
Repayment of borrowings
(17)
(17)
3.7
Transaction costs related to loans and
borrowings
(1)
(2)
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
(18)
26
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
2,347
5,067
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(381)
(1,733)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(446)
(1,858)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(18)
26
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
-
-
1,502
1,502
Current quarter
$A’000
Previous quarter
$A’000
1,502
2,347
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
1,502
2,347
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
142
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A’000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
n/a
n/a
7.2
Credit standby arrangements
n/a
n/a
7.3
Other (please specify)
n/a
n/a
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
n/a
n/a
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(381)
8.2
Payments for exploration & evaluation classified as investing
activities (item 2.1)
(446)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(827)
8.4
Cash and cash equivalents at quarter end (item 4.6)
1,502
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
1,502
1.82
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: Yes.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: The company is confident it will raise sufficient cash from existing and new
shareholders in the 3rd quarter of 2025 to continue the exploration and
development of its projects.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: Yes, as per answer in 8.8.2
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
30 July 2025
By the Board
Authorised by: ............
Share your feedback
Discover