Results of Annual General Meeting
Released
Released
Announcement PDF
25 November 2026
RESULTS OF ANNUAL GENERAL MEETING
Firebird Metals Limited (“FRB”, “Firebird” or “the Company”) is pleased to advise, in
accordance with ASX Listing Rule 3.13.2 and Section 251AA of the Corporations Act, details of
the resolutions and proxies received for the Annual General Meeting held on 25 November
2026.
All resolutions put to the meeting were passed on a poll. Poll results and proxies received are
set out over the page.
This announcement has been authorised for release by the Company Secretary of Firebird
Metals Limited.
For further information contact:
Oonagh Malone
Company Secretary
- END -
25 November 2026
Resolutions voted on at the meeting If decided by poll Proxies received
Resolution
Result
Voting
method
Voted for Voted against Abstained For Against Abstain Discretion
No. Short description Number % Number % Number Number Number Number Number
1 Adoption of Remuneration Report Passed Poll 13,460,388 99.0% 137,758 1.0% 0 12,924,068 137,758 0 36,320
2 Re-Election of Director - Evan Cranston Passed Poll 16,636,290 100.0% 3,778 0.0% 17,500 13,058,048 3,778 17,500 18,820
3 Approval of 7.1A Mandate Passed Poll 16,527,310 99.3% 112,758 0.7% 17,500 12,949,068 112,758 17,500 18,820
25 November 2026
About Firebird Metals Limited (ASX:FRB)
Firebird is an Australian battery materials technology company developing advanced
manganese-based lithium-ion battery materials for the EV and energy-storage
markets. Its proprietary, patented and exclusively licensed technology enables the direct
processing of manganese concentrate to cathode active materials (CAM) within a single
integrated process line, pairing a high-efficiency kiln and advanced crystallisation with
downstream processing know-how to target lower cost and energy use.
The Company’s immediate focus is delivery of its Australian Demonstration Plant
(ADP) in Perth, supported by a $2 million grant from the Australian Renewable
Energy Agency (ARENA) under the Battery Breakthrough Initiative. The ADP, Australia’s
first demonstration-scale facility processing manganese concentrate into high-purity
manganese sulphate (HPMSM) and downstream battery materials, including CAM, is
advancing rapidly through 2026. It builds on Firebird’s operating pilot facility, which has
demonstrated the full flowsheet from manganese ore to high-performance CAM, and will
validate the process under Australian conditions while delivering HPMSM and cathode
samples for customer qualification.
Firebird is advancing near-term HPMSM production for the lithium manganese iron
phosphate (LMFP) market, alongside a lithium manganese rich (LMR) program for next-
generation cathodes.
Firebird also holds 234 Mt of manganese resources in Western Australia, led by Oakover
(176.7 Mt at 9.9% Mn, including Indicated 105.8 Mt at 10.1% Mn1
) and Hill 616 (57.5 Mt at
12.2% Mn2
). The Company has the flexibility to source manganese ore through third-party
suppliers and stockpiles, with mining optionality retained within its broader portfolio.
JORC Compliance Statement
This announcement contains references to Mineral Resource Estimates, which have been
reported in compliance with Listing Rule 5.8 and extracted from previous ASX
announcements as referenced. The Company confirms that it is not aware of any new
information or data that materially affects the information previously reported and that
all material assumptions and technical parameters underpinning the Mineral Resource
Estimates continue to apply and have not materially changed.
1
See ASX announcement dated 23 March 2023: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at 9.6% for global
Resource of 176.7 Mt at 9.9% Mn.
2
See ASX announcement dated 1 December 2021: Inferred Resource of 57.5 Mt at 12.2% Mn.
Share your feedback
Discover