Firebird Metals AGM Presentation
Released
Released
Announcement PDF
The First Fully Integrated
Advanced Battery Materials
Plant Outside China
Prove. Demonstrate. Commercialise.
AGM Company Presentation | 25 November 2026
ASX: FRB
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
The shift to
manganese -rich
cathode chemistries
MARKET DRIVER
Manganese is cheaper, safer, more abundant and
supply -secure, and it is moving up the cathode mix
TODAY
LFP
Lithium Iron Phosphate dominates
~80% of cathode market.
EMERGING
LMFP
Lithium Manganese Iron Phosphate,
rapid adoption from 2028.
THE FUTURE
LMR
Lithium Manganese Rich, mass adoption
after 2030.
Manganese content of cathode (%)
0
15
20
25
>55
-5
5
15
25
35
45
55
65
LFP NCM Sodium-Ion LMFP LMR
Firebird Tech
2
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
MARKET VALIDATION
LMFP and LMR are now OEM and cell -maker roadmaps
GM + LG Energy Solution (US / Korea)
First LMR prismatic EV cells, ~30% denser than LFP at similar cost; first vehicle targeted 2028.
Ford (US)
In-house LMR chemistry; 2nd -gen cells on a Michigan pilot line; vehicle integration by 2030.
CATL (China)
M3P advanced LMFP scaling 2024 –25; believed to hold the largest LMR patent portfolio.
LG Chem / POSCO Future M (Korea)
Gen1 LMR cathode mass -production -ready; POSCO full -scale LMR production late 2026.
Firebird Metals (Australia)
Successfully demonstrated HPMSM, LMFP and LMR battery materials performance at a large scale Pilot plant, now
executing the first demonstration scale plant in the West.
Sources: Company announcements and industry press compiled by Traubenbach Associates (K. Hoffman, Firebird Special Advisor), current to Q3 2026.
3
Who’s committed?
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
4
First outside China: concentrate to cathode in one circuit
INTEGRATED PROCESS
From manganese concentrate to finished cathode active material in a single integrated process line
Mn
Concentrate
Feedstock
UHPMSM
in solution
p-CAM
Precursor
CAM
LMFP / LMR
Energy -efficient
Patented kiln uses 70% less electricity. 5th -gen
crystalliser uses 90% less energy than
conventional single -effect evaporators.
Capital -light
Removes conventional intermediate
steps and inter -facility logistics,
lowering capex and opex versus the
standard split supply chain.
Value Chain Consolidation
Transforming a complex, multi country, multi
plant battery materials supply chain into a single
integrated circuit
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
5
Firebirds new integrated manganese supply chain solution
INTEGRATED PROCESS
Transforming a complex, multi country, multi plant battery materials supply chain into a single integrated circuit
Current global
supply chain
1. Mining
Manganese ore
Australia, South Africa, Brazil
2. Refining
High -purity manganese sulphate
China
3. Battery
materials
Manganese pCAM / CAM
China, Japan, Korea
4. Battery
cells
Lithium -ion batteries
China, Japan, Korea
5. EV &
Defense use
US defence applications
USA
Firebird new
supply chain
*Case Study
1. Mining
Manganese ore
2. Refining & battery materials
High -purity manganese sulphate Manganese pCAM / CAM
3. Battery
cells
Lithium -ion batteries
A single W estern Countr y
4. EV &
Defense use
US defence applications
US -based step
Processing, cathode and battery manufacturing move from China, Japan and Korea to the US
Firebird’s Oakover
Manganese Project, Australia
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
6
Prove. Demonstrate. Commercialise .
STRATEGY
A staged pathway from proven pilot to commercial revenue. Each step de -risks the next.
Prove
Chinese Pilot Plant, Hunan
• 650sqm large -scale pilot operating
since 2023
• Proven process across 150+ batches.
• Production of independently verified
high quality, UHPMSM, p -CAM and
CAM samples
Demonstrate
Australian Demonstration Plant, Perth
• 775sqm site secured, all key equipment
ordered, 1 st container of gear arrived
• A$1.0M of the A$2.0M ARENA grant received.
• Assembly and commissioning Q1 CY27, first
samples Q2 CY27.
Commercialise
Western jurisdictions, from 2027
• ADP samples to US and Western
qualification programs.
• North American plant pathway with US
partners: JVs, licensing, equipment sales
and offtake.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
7
PROVE.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Pilot Plant - Proven and patented
TECHNOLOGY FOUNDATION
ADP de -risked by an operating pilot plant, an extensive patent portfolio and a sector -leading technical team
650 sqm
HUNAN
PILOT PLANT
5+1
LMFP &
KILN PATENTS
+50 yrs
MANGANESE
EXPERTISE
Operating since Dec 2023
with multiple successful
concentrate -to-cathode
campaigns
+150 batches
outperforming China
Industry Standards
Five core LMFP patents
under exclusive ex -China
licence through 2045,
plus high -efficiency
electric calcination kiln
patent
1st Quartile on cost curve
Combined manganese,
battery and resource
sector experience
across the team that
is unmatched in Western
markets
8
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Customer testing
confirms >99.99%
purity
INDEPENDENT VALIDATION
Independent international customer testing exceeds
Chinese industry standards across all key parameters
PURITY
>99.99%
MnSO₄ purity confirmed by international
customer testing in June 2026.
GRADE
32.6%
Manganese content exceeds the
Chinese Superior Grade benchmark of
32.18 Wt.%.
IMPURITIES
<0.5 ppm
Most impurity elements below detection
limits, validating in -line impurity removal.
Source: ASX announcement, 2 July 2026
IMPURITY LEVELS BENCHMARKED TO CHINA INDUSTRY STANDARD
Element China standard (Superior) Firebird HPMSM (Jun 2026)
Iron (Fe) ≤ 10 ppm <0.5 ppm
Copper (Cu) ≤ 10 ppm <0.5 ppm
Lead (Pb) ≤ 10 ppm <0.5 ppm
Chromium (Cr) ≤ 10 ppm <0.5 ppm
Aluminium (Al) ≤ 10 ppm <0.5 ppm
Potassium (K) ≤ 30 ppm <0.5 ppm
Calcium (Ca) ≤ 50 ppm <0.5 ppm
Sodium (Na) ≤ 100 ppm 2.6 ppm
HPMSM battery -grade prices up 23% year -to-date, on growing EV and storage demand
(SMM, June 2026)
9
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
First 99.999% purity
manganese sulphate
ULTRA - HIGH PURITY
In-line impurity extractant process delivers 5N purity,
with most impurities below lower detection limits
PURITY
99.999%
5N MnSO ₄ produced at the Hunan Pilot
Plant. The only Western producer.
IMPURITIES
≤1 ppm
Most elements ≤1 ppm in Firebird
testing; third -party results ≤5 ppm.
PRICE PREMIUM
~33%
Approximate premium for ultra -high -
purity material over standard battery -
grade MnSO ₄.
Source: ASX announcement, 19 October 2026. Firebird results by AAS.
IMPURITIES VS CHINA STANDARD HG/T 4823 -2023
Element
China standard
(Superior)
Firebird result (Oct
2026)
Third -party result
Manganese (Mn) 32.18 Wt.% ≥ 32.48 Wt.% ≥ 32.46 Wt.%
Iron (Fe) ≤ 10 ppm ≤ 1 ppm < 5 ppm
Copper (Cu) ≤ 10 ppm ≤ 1 ppm ≤ 5 ppm
Lead (Pb) ≤ 10 ppm ≤ 1 ppm ≤ 5 ppm
Chromium (Cr) ≤ 10 ppm ≤ 1 ppm ≤ 5 ppm
Aluminium (Al) ≤ 10 ppm ≤ 1 ppm ≤ 5 ppm
Potassium (K) ≤ 30 ppm ≤ 1 ppm ≤ 5 ppm
Calcium (Ca) ≤ 50 ppm ≤ 5 ppm ≤ 15 ppm
Sodium (Na) ≤ 100 ppm ≤ 1 ppm ≤ 5 ppm
Next: Oakover ore being processed to UHPMSM at Hunan, to be replicated as the first ADP
campaign in 2027. Results to follow independent testing.
10
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
11
LMR cathode matches commercial benchmark
LMR CATHODE PROGRAM
Independent electrochemical testing confirms Firebird's proprietary LMR cathode performance in line with commercial benchmark
263.7
mAh/g DISCHARGE
CAPACITY (0.1C)
+65%
VS TYPICAL LFP
CATHODES
+20
SYNTHESIS
CAMPAIGN BATCHES
0.1C discharge capacity of
263.7 mAh/g and 1C
capacity of 211.2 mAh/g, in
line with commercially
sourced benchmark
material
Approximately 65% higher
discharge capacity than
typical LFP and 26% higher
than high -nickel NCM
cathode materials
Among the first Western -
listed companies to
publicly report
electrochemical
performance data for
proprietary LMR cathodes
Source: ASX announcement, 28 July 2026. LFP and high -nickel NCM figures are typical industry values cited in the announcement.
160
210
261.3 263.7
LFP NCM LMR ref. Firebird
LMR
0.1C discharge capacity (mAh/g)
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
12
Improved LMR precursor quality
LMR PRECURSOR PROGRAM
Optimised co -precipitation and washing lift tap density, cut sulphur and tighten particle size versus July 2026 results
1.35
g/cm³ PRECURSOR
TAP DENSITY
-46%
SULPHUR CONTENT,
NOW 610 ppm
6.0 µm
D90 PARTICLE SIZE,
FROM 7.8 µm
35% above Firebird's July
2026 result (1.0 g/cm³) and
11% above a commercial
reference (1.22 g/cm³)
Down from 1,130 ppm in
July through refined
washing. Sulphur is a key
impurity that can adversely
affect battery performance
D50 of 4.2 µm matches the
commercial reference,
indicating tighter particle -
size control. Key indicators
consistent across three
batches
Source: ASX announcements, 28 July and 26 October 2026.
1.00
1.20 1.22
1.35
FRB Jul-
26
Target Comm.
ref.
FRB Oct-
26
Precursor tap density (g/cm³)
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
13
DEMONSTRATE.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Demonstration Plant
ADP - SITE SECURED
April: Multi-year lease executed for the 775 sqm purpose -fit facility
August: Firebird team moves into the ADP site as the new corporate head office
September: Final site readiness activities completed
November: First container of equipment arrived
December: ADP assembly commences
13 Sangiorgio Court
Osborne Park, Perth WA
~7 km from Perth CBD
10 min drive time
Multi year lease + options to extend
775sqm footprint
Capital -light deployment with room to scale.
Project Readiness
14
Source: ASX announcement, 30 April and 2 September 2026 July 2026
• Dr Chris Passmore (Chemical Engineer) employed as ADP
Technical Lead, other local appointments to follow
• Regular site visits to China pilot plant
• Operating procedures and risk management plan developed
• Engagement with Universities and engineering Firms
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
ADP - SITE SECURED
15
Demonstration Plant
Firebird ADP Site – Process Area
Firebird ADP Site – Office Area
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
FEDERAL GOVERNMENT BACKING
A$2.0M ARENA grant secured, A$1.0M received
Non -dilutive funding under the Battery
Breakthrough Initiative, validating Firebird's
technology platform and delivery track record
A$2.0M
ARENA grant secured | A$1.0M received
Non -dilutive • No IP rights granted • Matched 1:1 by Firebird
Battery Breakthrough Initiative
Federal Government Program | National Battery Strategy
GRANT VALIDATION AND DELIVERY
Technical viability
Independent technical review confirms the integrated manganese -to-CAM platform is credible
and commercially relevant.
Strategic alignment
Direct fit with Australia's Critical Minerals Strategy, energy storage priorities and Net Zero 2050
commitments.
Milestone 1 complete: A$1.0M received
Osborne Park ADP site secured, all key equipment ordered and Risk Management Plan accepted
by ARENA, ahead of schedule and within budget.
Milestone 2 underway
Firebird relocating to the Osborne Park ADP facility; remaining A$1.0M payable across coming
milestones.
ARENA CEO Darren Miller: "…an important step toward building domestic capability
to convert Australian manganese into battery cathode materials."
ASX: FRB firebirdmetals .com .au
16
Source: ASX announcement 23 April and 17 July 2026
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
ASX: FRB firebirdmetals .com.au
Delivering on schedule
ADP development timeline to first samples, Q1 CY2027
ACTIVITY Q1 2026 Q2 2026 Q3 2026 Q4 2026 Q1 2027
IP Licence Agreement
ARENA Grant – Milestone 1
Site Selection & Lease
Equipment Orders Placed
Equipment Fabrication & FAT
First Equipment Shipment
Remaining Equipment Delivery
Site Readiness
ADP Assembly & Commissioning
First Samples
Customer / Investor / Govt Site Visits
Australia Patent Application
China Pilot Plant LMR Development
✓
✓
✓
✓
17
✓
✓
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
18
COMMERCIALISE.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Commercial Scale Battery Materials Plant Complex
2024 Feasibility Study for a commercial scale plant completed:
This study will now be adapted for a plant to be constructed in the West
• Location: Jinshi High -Tech Chemical Industrial Park, Jinshi City, Hunan, China
• Production: Equivalent 72,500 tpa high purity manganese sulphate monohydrate
• Ore Feed: Approximately 66,000 tonnes annually
• Competitive OPEX: US$579/t
• Competitive CAPEX: ~US$94m (*inclusive or working capital)
2024 Feasibility Study Highlights
Source: ASX announcement, 2 October 2024
19
Firebird commercial scale manganese battery materials plant complex plant site ( 12 hectare site)
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Commercial Opportunity
TECHNOLOGY POSITIONED ON THE FIRST QUARTILE OF THE COST CURVE IN A MARKET THAT IS GROWING SIGNIFICANTLY
Feasibility -study OPEX, including kiln savings,
sits below every published peer study charted
1,577
1,294 1,250
790
579
0
300
600
900
1200
1500
1800
Euro Manganese
Study (ASX ann.
14/5/2026)
E25 Feasibility,
Train 1 (ASX
12/4/2023)
Benchmark Mineral
Intelligence: China
EMM route (Apr
2024)
Benchmark Mineral
Intelligence: China
ore to sulphate,
44% Mn (Apr 2024)
Firebird Feasibility
plus kiln savings
US$579/t¹
SMM price, June 2026
0
500
1000
1500
2000
2500
3000
2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
0
1000
2000
3000
4000
5000
6000
Bloomberg base -case GWh forecast (Dec 2025)
and FRB HPMSM demand (kt)
HPMSM demand (kt) Global GWh
GWh kt
Sources: ASX Announcement, 7 May 2024 plus kiln savings; peer studies as charted; SMM price May 2026; Bloomberg GWh forecast (De c 2025), Firebird -derived HPMSM demand.
US$/t
20
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Four routes to revenue
COMMERCIALISATION: ONE INTEGRATED PROCESS, FOUR WAYS TO MONETISE IT
The ADP is the proof point for every route.
Joint ventures
Co -developing processing capacity
with strategic partners, contributing
Firebird's process IP and operating
know -how.
Technology licensing
Licensing the patented concentrate -to-
CAM process to third -party processors
outside China. Capital -light, with IP
retained.
Equipment sales
Supply of Firebird's energy -efficient kiln
and crystalliser technology to
manganese processors.
Product offtake
HPMSM, p -CAM and CAM supply to
cathode makers and OEMs, starting with
qualification samples from the ADP.
21
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
What happens next?
NEWSFLOW
A dense run of milestones from vessel arrival to first samples and customer qualification
Jul – Nov 2026
Site readiness and equipment
ordering
Dec 2026
Plant Assembly
Q1-2 2027
Commissioning & first samples
2027
Qualification and
commercialisation
• First v essel arrival at
Fremantle, early October
• Further container shipments
as FAT completes, each with
a market update
• Site readiness complete
• September quarterly report
• 1st container of equipment
arrives
• ADP equipment assembly
commences
• Customer, investor and
government site visits
• LMR program updates from
the Hunan pilot plant
• ADP equipment assembly
completes
• ARENA Milestone 2:
Assembly of the ADP facility
• ADP commissioning
commences
• ARENA Milestone 3:
Commissioning of the ADP
• First HPMSM and cathode
samples
• Australian patent application
• 3rd party verified results and
announcements
• Customer and OEM
qualification programs
• Commercialisation strategy
and partnering execution:
JVs, licensing, equipment
sales, product offtake
22
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Cost & Performance Benefits
Why manganese wins the chemistry race
CHEMISTRY OUTLOOK
LFP
Low cost but a capped theoretical
energy density
LMFP & LMR
Offering pathways to higher energy
density at competitive cost
NMC
Higher energy density, with greater
cost and thermal -management
demands
Na -ion
Low energy density and yet to
establish a clear cost advantage
PROS
• ~$40/kWh, lowest cost today
• 10,000+ cycles
• Safe chemistry, excellent record
• Proven at scale, dominant in BESS
PROS
• 190–300 Wh/kg, superior to LFP and
equivalent to NCM
• Est. ~$50/kWh, could fall below LFP
• Higher voltage, better system
efficiency
• Strong cold -weather performance
PROS
• 250 –290 Wh/kg, high energy density
• Ex-China capacity, installed Western
base
• High recycle value
• EV proven
PROS
• Good cold -weather performance
• No lithium needed
Sources: BloombergNEF Battery Price Survey 2025; Wood Mackenzie; Benchmark Mineral Intelligence; Traubenbach Associates research (K. Hoffman, Firebird Special Advisor). Cost figures are indicative cell -level estimates, not vendor -disclo sed.
23
CONS
• 100 –150 Wh/kg, lowest energy
density of all of all
• Transition -metal cost risk (Ti, Sn, La)
• Early stage, limited commercial
deployment
• Low recycling value
CONS
• 150–190 Wh/kg, low energy density
• Poor cold -weather performance
• Low voltage limits applications
• Low recycling value
CONS
• ~$80/kWh, high cost
• Cold -weather degradation
• 3,000 –6,000 cycles
• Thermal runaway, worst safety profile
CONS
• Newest chemistry, limited field data
• High -purity Mn scarce outside China
• Manufacturing ramp still early
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Leadership that has built and operated manganese plants
TEAM
Over 50 years of combined manganese expertise paired with deep battery materials and capital markets experience
Evan Cranston
Executive Chairman
Mining executive; corporate &
mining law background.
Ron Mitchell
Chief Executive Officer
25+ yrs commercial, strategy &
BD; 15 yrs in lithium and
battery materials.
Wei Li
Executive Director
Chartered Accountant; led
commissioning of A$150M
EMD plant, Hunan.
Ashley Pattison
Non -Executive Director
Chartered Accountant; 20+ yrs
in resources operations,
finance & strategy.
Brett Grosvenor
Non -Executive Director
25+ yrs mining & power
industry; engineering & MBA
qualified.
Ken Hoffman
Special Advisor (Board)
Former Global Head of Battery
Materials, McKinsey; battery
value chain strategy.
Peter Allen
Key Consultant
20+ yrs marketing manganese,
lithium and other commodities.
Mr Zhou Qiyun
China CTO
20+ yrs in Mn sulphate
processing; MVR crystalliser
design and patents.
Mr Tang
Chief Executive Officer
(China)
Mn sulphate plant operations &
engineering; MVR
commissioning and process
optimisation .
+
Central South University partnership, global leaders in Li -ion battery
materials processes; alumni founded BYD and Ronbay Technology.
24
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Corporate
Snapshot
Board & Mgmt ,
13.72%
Tolga Kumova ,
8.19%
Canmax ,
5.89%
Others ,
65.80%
Westbeck
Capital , 6.40%
$0.10
Share price
*24 Nov 2026
$18.24 M
Market
capitalization
0.8 M
Performance
rights
182.36 M
Shares on issue
49 M
Options
@ $0.3 to $1.00
$3.3 M
Cash on hand:
*30 Sept 2026
Capital Stack
ASX: FRB | firebirdmetals.com.au 25
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Firebird is creating a platform that can attract global
capital and strategic partnerships into Western Australia
WHY FIREBIRD
World -first ADP, secured
Perth lease executed, fit -out and
equipment procurement completed.
Government -validated
A$2M ARENA grant, non -dilutive,
anchoring capital -light delivery.
Defensible IP to 2045
Five core LMFP patents under exclusive
ex-China licence ; high -efficiency kiln patent.
Multiple revenue paths
Licensing, JVs, equipment sales,
HPMSM, p -CAM and CAM offtake.
Upstream optionality
234 Mt of WA manganese resources at
Oakover and Hill 616, ore -agnostic
flowsheet.
A Platform for Global Strategic
Partnerships
Engagement with number of Tier 1 Western
OEM’s and battery companies
ASX: FRB | firebirdmetals.com.au 26
OAKOVER MANGANESE PROJECT
100% owned by Firebird
Granted mining lease
176Mt JORC resource
Tier 1 mining jurisdiction
FIREBIRD METALS
FIREBIRD METALS
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
100% Owned Oakover
Manganese Project
UPSTREAM SECURITY
234 Mt of manganese resources in
Western Australia provides long -term
feedstock optionality for the ADP
176.65 Mt
Oakover JORC Resource
@ 9.9% Mn
73%
IRR
(DMS scoping study, 2023)
A$741M
NPV
@ 8% discount rate
18 yrs
Life of Mine
JORC Mineral resource estimate
Classification Tonnes (Mt) Mn (%) Fe (%) SiO₂ (%) Al₂O ₃ (%) P (%)
Indicated 105.78 10.1 8.9 39.2 9.8 0.10
Inferred 70.87 9.6 8.0 36.5 9.5 0.09
Total 176.65 9.9 8.6 38.1 9.7 0.10
HILL 616 +
57.5 Mt
@ 12.2% Mn (Inferred)
Total 234 Mt
across Firebird's WA portfolio.
Source: ASX announcements, 23 March 2023 and 30 August 2023
Source: ASX announcements, 23 March 2023 and 30 August 2023
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Rapid and Successful Mineral Resource
Development
Notes:
1. For Full Details refer ASX announcement "Prospectus" dated 16/3/2021
2. For Full details refer ASX announcement "Hill 616 Maiden inferred Resources increases Mn 90%" dated 1/12/2021
3. For full details refer ASX announcement "Game Changing Resource Upgrade at Oakover " dated 10/3/2022
4. For Full details refer ASX announcement "Firebird grows Oakover Indicated Resource by 80% to 105.8 Million Tonnes " dated 23/3/2023
Since listing in early 2021, FRB has rapidly grown and
developed its project portfolio, with a key focus on Oakover
250
200
150
100
50
0
Million
Tonnes
Resource
Mar 2021
ASX listing,
Oakover Inferred
Mineral Resource
of 64 Mt at 10% 1
Aug 2021
Oakover Maiden
233-hole, 10,000m
RC drill program
Dec 2021
Maiden Inferred
Mineral Resource
at Hill 616 of
57.5Mt at
12.2%Mn2
Mar 2022
108 Mt uplift in
Oakover Mineral
Resource to 172 Mt
at 9.9% Mn
July 2022
Completion of
Oakover Mn conc
Scoping Study –
confirming
excellent potential
Mar 2023
Infill drill
program results
lift Indicated
Resource by
80% from 58.7
Mt to 105.8 Mt
Oct 2022
Completion
of Oakover
Infill Drill
Program
March 2025
Mining Lease
Granted
2023
Updated Dense
Media
Separation
(DMS) scoping
study, results
confirm Oakover
Project as long -
life, tier -one
manganese
operation
ASX: FRB firebirdmetals .com.au 30
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Mining
Lease
Firebird has been granted
Mining Lease
ML 52/1086
for the Oakover Manganese Project
Receipt of the Mining Lease is
conditional on the Company’s
development of a mining proposal,
requiring approval from the
Department of Energy, Mines,
Industry Regulation and Safety
(DEMIRS)
The Mining Lease covers a large area
of 3,429.8 ha, including the Sixty
Sixer, Jay Eye and Karen Pits, as well
as proposed processing plant,
tailings storage and waste dump
DMS Manganese concentrate
scoping study
Updated Dense Media Separation (DMS)
Manganese Concentrate Scoping Study
(30/8/23) results confirm flagship Oakover
Project as long -life, tier -one manganese
operation.
18-year Life of Mine
Approximate A$741.3 M NPV at a
discount rate of 8% , Impressive IRR of
73.1%, with pay back in 16 months
~4Mt annual processing, ~1.2 Mt of 30 -32
% Manganese (Mn) concentrate annually
Capex estimated of A$123 million
Low mine strip ratio of 0.45:1
Indicated material accounts for 99.2% of
the material processed
Key results include
Environmental surveys/studies
Flora, Fauna, Sub
Terranean Fauna,
Aquatic Fauna
surveys complete
Desk top Water
study complete
Source: ASX announcement, 18 March 2025
Source: ASX announcement, 18 March 2025
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Disclaimer
IMPORTANT INFORMATION
This presentation contains summary information about Firebird Metals Limited (Firebird) (ABN 24 610 035
535) and is current as of 25 November 2026 . The information in this presentation is of a general background
and does not purport to be complete. This presentation is not investment or financial product advice (nor
tax, accounting or legal advice) and is not intended to be used for the basis of making an investment
decision.
The information contained in this presentation has been prepared without taking into account the objectives,
financial situation or needs of individuals. Investors should obtain their own advice before making any
investment decision. Firebird has prepared this document based on information available to it at the time of
preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or
completeness of the information, opinions and conclusions contained in this presentation.
This presentation contains certain “forward -looking statements”. Forward looking statements can generally
be identified by the use of forward -looking words such as, “expect”, “should”, “could”, “may”, “predict”, “plan”,
“will”, “believe”, “forecast”, “estimate”, “target” and other similar expressions. Indications of, and guidance on,
future earnings and financial position and performance are also forward -looking statements. Forward -
looking statements, opinions and estimates provided in this presentation are based on assumptions and
contingencies which are subject to change without notice, as are statements about market and industry
trends, which are based on interpretations of current market conditions. Forward -looking statements
including projections, guidance on future earnings and estimates are provided as a general guide only and
should not be relied upon as an indication or guarantee of future performance
This presentation contains statements that are subject to risk factors associated with Firebird and the mining
exploration industry. It is believed that the expectations reflected in these statements are reasonable, but
they may be affected by a range of variables which could cause actual results or trends to differ materially.
Firebird disclaim any intent or obligation to publicly update any forward -looking statements, whether as a
result of new information, future events or results or otherwise. To the maximum extent permitted by law,
Firebird, their related bodies corporate (as that term is defined in the Corporations Act 2001 ( Cth ) and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility or
liability including, without limitation, any liability arising from fault or negligence on the part of any person,
for any loss arising from the use of the presentation or its contents or otherwise arising in connection with it.
This presentation has been approved by the Board of Firebird.
JORC COMPLIANCE
This presentation contains references to Exploration Results and Mineral Resource Estimates,
which have been reported in compliance with ASX Listing Rules 5.7 and 5.8 and extracted from
previous ASX announcements as referenced. The Company confirms that it is not aware of any
new information or data that materially affects the information included in the said
announcements, and in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the relevant market
announcements continue to apply and have not materially changed.
The Company confirms that the material assumptions and technical parameters underpinning
the production target disclosed in the Company's announcement dated 7 May 2024 continue
to apply and have not materially changed.
Oakover Resource: Indicated Resource of 105.8Mt at 10.1%; Inferred Resource of 70.9Mt at
9.6% for global Resource of 176.7 Mt at 9.9% Mn
Hill 616 Resource: Inferred Resource of 57.5 Mt at 12.2% Mn
For full details refer to ASX announcements 10/3/22, 30/1/23, 23/3/23, 26/6/23, 30/8/23,
1/9/23, 18/10/23, 21/11/23, 13/12/23, 29/1/24, 13/3/24, 7/5/24, 14/5/24, 28/5/24, 5/6/24,
10/9/24, 12/9/24, 24/9/24, 2/10/24, 21/10/24, 28/10/24, 9/12/25, 10/2/25, 20/2/25, 18/3/25,
12/5/25, 24/6/25, 21/7/25, 30/7/25, 5/8/25
CAUTIONARY STATEMENTS
SULPHATE FEASIBILITY STUDY
The Feasibility Study referred to in this presentation is a Technical Feasibility of the
establishment of the Battery Grade Manganese Sulphate Project Stage 1 Processing Plant in
China (the Plant). The Feasibility Study is based on the material assumptions contained in the
Feasibility Study document released to the ASX on 7 May 2024. These include assumptions
about the availability of funding. While the Company considers all of the material assumptions
to be based on reasonable grounds, there is no certainty that they will prove to be correct or
that the range of outcomes indicated by the Feasibility Study will be achieved.
Notwithstanding the developments set out in this presentation, Investors should note that
there is no certainty that the Company will be able to raise the amount of funding to develop
the Plant when needed. It is also possible that such funding may only be available on terms that
may be dilutive to or otherwise affect the value of Company’s existing shares. It is also possible
that the Company could pursue other ‘value realisation’ strategies such as a sale, partial sale or
joint venture of the Plant. If it does, this could materially reduce the Company’s proportionate
ownership of the Plant. Given the uncertainties involved, investors should not make any
investment decisions based solely on the results of the Feasibility Study.
ASX: FRB
ASX: FRB | firebirdmetals.com.au
FIREBIRD METALS
Cautionary statements
DMS Concentrate Scoping Study
The Updated Scoping Study announced to the ASX on 30 August 2023 has been undertaken for
the purpose of initial evaluation of a potential development of the Oakover Manganese Project.
The Scoping Study is a preliminary technical and economic study of the potential viability of the
Oakover Manganese Project as a manganese producer. The Scoping Study outcomes,
production target and forecast financial information referred to in this release are based on low
accuracy level technical and economic assessments that are insufficient to support estimation
of Ore resources.
The Scoping Study has been completed to a level of accuracy of +/ - 35% in line wi